Appendix D Engineering Site Servicing Report

of 21

Page text shows just the words. Original shows the document exactly as it was published.

       The Target Stratum for the foundation of the structure at location BH2 is the CLAYEY
       SAND at a depth of 1300mm below existing ground level.

       It is the designing engineer’s responsibility to address the potential influence of any trees
       present on or around the proposed building site.

       If any further fill is placed over the existing ground, the structure shall be piered through
       the fill into the existing material. Further note that the placement of reactive material as
       fill or cutting of the site may change the site’s classification.

   4. SOIL PROFILE

       Refer to Soil Profile Report for borelog information.

       Whilst every effort has been made to ensure that the borelogs carried out at the subject allotment
       are indicative of the soil profile over the site any discrepancy between the profile detailed in
       the borelogs and that observed during construction shall be referred to Global Testing for
       immediate attention.

   5. MATERIALS LABORATORY TEST RESULTS

       Soil Laboratory testing carried out on samples of the soil taken from the site gave the following
       results:
                 BOREHOLE                                                  BH2
                 DEPTH RANGE OF SAMPLE                                1400-1700mm
                 LIQUID LIMIT (%)                                          N/a
                 PLASTIC LIMIT (%)                                         N/a
                 PLASTIC INDEX (%)                                         N/a
                 LINEAR SHRINKAGE (%)                                      N/a
                 INSTABILITY INDEX (%)                                     N/a
                 SHRINK SWELL INDEX, Iss (%)                                2.6
                 PREDICTED SURFACE MOVEMENT                                N/a

       Please note that the Plasticity Index (PI) determined by the Atterberg Test may be correlated to
       an Instability Index (Ips)with reference to the results of extensive testing carried out by others,
       notably, Dr P Mitchell, ‘Footings for Small Scale Domestic Structures,’ March 1990.

       Yours Sincerely,




       MICHAEL PINKNEY. (Laboratory Manager)




Page | 2 Borelogging in accordance with AS1726-2017 Geotechnical Site Investigations Code
                                            21/0127
Log in to download the original file

Appendix D Engineering Site Servicing Report.pdf · 7.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.