Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

8. APP G. Engineering RFI Response

Attached to the e-mail MCU14/0102 - Response to Information Request - Email 2 of 2..

of 68

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 24, section 1. The text section number identifies this passage in the reader.

          Figure 6.2: Bio-Retention Basin Typical Cross-Section (courtesy of Healthy Waterways)


          MODELLING OF THE DEVELOPMENT SITE
          (MUSIC)
          Modelling of the site was undertaken using the ‘Model for Urban Stormwater Improvement
          Conceptualisation (MUSIC)’ as promoted by the Noosa Council and the South East Queensland
          Healthy Waterways Partnership. The development was modelled using the split catchment
          approach. An appropriate type of land use was applied to all surface types within the developed
          catchments; with individual treatment devices assigned the relevant modelling treatment
          parameters. Consequently, a treatment train was established for each catchment, ensuring that
          all water discharging from site adheres to the specified Water Quality Objectives.

          Meteorological data for input into MUSIC was obtained for the Cooroy Composite Station
          (station number 40059) from the Bureau of Meteorology. Six minute time step rainfall data was
          obtained for the climate period from 1/1/1973 to 31/12/1983. The catchment parameters of the
          MUSIC modelling are specified within the South East Queensland Healthy Waterways
          Partnerships’ Water by Design MUSIC Modelling Guidelines for South East Queensland Version
          1 (2010), and have been modelled as such.

          POLLUTANT SOURCE NODE DETAILS
          Tables 6.2 and 6.3 show the pollutant source node parameters input into the MUSIC model.
          These parameters have been utilised in accordance with the South East Queensland Healthy
          Waterways Partnerships’ Water by Design MUSIC Modelling Guidelines for South East
          Queensland Version 1 (2010).

          Table 6.2: Rainfall – Runoff Parameters
           Storage Capacity (mm/day)                       18
           Initial Storage (%)                             10
           Field Capacity (mm)                             80
           Initial Depth (mm)                              50
           Daily Recharge Rate (%)                          0
           Daily Baseflow Rate (%)                         31


                                                                                          Stormwater Management Plans
Page 12                                                                     Hyder Consulting Pty Ltd-ABN 76 104 485 289
                                        f:\aa007595\f-reports\f0002-aar-aa007595 sbswmp report\f0002-aa007595-aar-04.-smp.docx
Log in to download the original file

8. APP G. Engineering RFI Response.pdf · 5.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.