8. APP G. Engineering RFI Response
Attached to the e-mail MCU14/0102 - Response to Information Request - Email 2 of 2..
Original PDF page 44, section 1. The text section number identifies this passage in the reader.
Project: Eumundi Noosa Road
Project No.: AA007595
Designer: KF
Date: 5/11/2014
Rational Method Calculations
Project Eumundi Noosa Road
Description Catchment 1 (South Corner) Pre-Developed Discharge
Time of Concentration 5.0 minutes
Area of Catchment 0.10 Hectares
Fraction Impervious 0.85
Council Chart No.
15
Council Name
#N/A
ARI C value Rainfall Intensity Discharge (m3/s) Comments
(mm/hr)
3month 0.01 Write anything here
1 year 0.71 128.57 0.02 that is applicable to
the analysis
2 year 0.75 163.17 0.03
5 year 0.84 200.83 0.04
10 year 0.89 222.29 0.05
20 year 0.93 252.10 0.06
50 year 1.00 291.10 0.08
100 year 1.00 320.76 0.08
ARI vs Discharge
6.00
5.00
Discharge (cumecs)
4.00
3.00
2.00
1.00
0.00
0 10 20 30 40 50 60 70 80 90 100
ARI
All Calculations are based on QUDM methods Version 4/05
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.