Soil Test & Footing Report SCG 30002(S)

of 18

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Floor Slab Details

The thickness and reinforcement for slabs on ground are shown on the structural plans.

Ground slabs may require thickenings or stiffening beams incorporated in their construction. It may be
advantageous to excavate them at the same time as the perimeter footings. Refer to the structural plans for the
locations and extent of these.

Where the stiffening beams intersect a perimeter footing, their base must be graded down to the footing base
level, 3 x N12 bars must be cogged into the footing and lapped 500 with the beams trench mesh. Refer to the
structural plans for details.

Where the stiffening beams intersect a blockbase or retaining wall, 3-N12 bars must be dowelled 150mm into the
blockbase and lapped 500 with the beams trench mesh. Refer to the structural plans for details.

A levelling layer under the ground floor slab is to comprise of granular material such as clean sand or crusher
dust compacted in 150mm layers. Either well graded sand or crusher dust can be used.

An approved polyethylene damp proof membrane of 0.2mm (min) thickness is to be placed over the levelling
layer. Laps are to be a minimum of 200mm and be taped. All service penetrations and punctures are to be fully
taped. The membrane is to be extended down the inside face of the perimeter footings and must continue under
any thickenings or stiffening beams.

Drilled Piers Supporting the Slab

Slab piers are required where there is more than 300mm of uncontrolled fill beneath the slab. They are to be
founded at a minimum of 300mm into the NATURAL MEDIUM DENSE SILTY SAND. Special attention must be paid
to the extra slab thickening required over slab piers as detailed in the structural plans.

Drilled Pier Reinforcement

                             Pier Depth mm      Perimeter Piers       Slab Piers

                                up to 1500       None required      none required
                                1500-2500         2xN12bars         none required
                                2500-4000         4xN12bars          2xN12bars
                                4000-6000         6xN12 bars         4xN12bars

Pad Footing Details

All pad footings must be founded to the depth nominated on the structural plans. Where this depth is not 300mm
into the NATURAL MEDIUM DENSE SILTY SAND they must be deepened down to this level.


NOTE:    The information contained herein has been compiled following our field and laboratory testing,
         accepted engineering theory and discussions with and information supplied by our client, whom
         is noted on the header page of this report. We offer no warranty for the use of this report by
         other parties without prior written consent from this office.
         The report must be read in conjunction with the attached appendices. If you do not have a copy
         of these please contact our office and a copy can be issued to you.




Sean Richardson – RPEQ 5835
For and on behalf
SCG CONSULTING ENGINEERS




     SCG Consulting Engineers                            4                                   SCG Ref: 30002(S)
Log in to download the original file

Soil Test & Footing Report SCG 30002(S).pdf · 2.4 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.