Stockwell Development Group Pty Ltd SLR Ref No: 620.30735-R01-v1.2 Traffic Impact Statement 2023 03 30-
Traffic Impact Statement update.docx
Noosaville Childcare Centre March 2023
Lot 4, Noosa Business Centre
1 Introduction
1.1 Context
SLR Consulting Australia Pty Ltd (SLR) has been engaged by Stockwell Development Group Pty Ltd (Stockwell) to
prepare a revised Traffic Impact Statement (TIS) for the proposed Childcare Centre development (the
development) to be located on Lot 4 within the Noosa Business Centre in Noosaville. Plans of the proposal are
provided at Appendix A for reference.
The intent of this TIS is to document this advice and assess the consistency of the proposed development against
relevant design standards and good engineering practice to inform Noosa Shire Council’s (NSC) assessment of a
planning application to facilitate the subject development. Specifically, this document considers the car parking,
access and servicing arrangements proposed for the subject development.
1.2 Planning Application
This Development Application (DA) seeks approval for a Material Change of Use (MCU) for a Childcare Centre in
the Business Park Precinct of the Noosa Business Centre (Major Centre Zone).
On 31 May 2022, the DA was submitted for the subject development for what was the proposed Lot 4 (which
has since been registered) on Hofmann Drive, Noosaville. Subsequent to this, NSC issued an Information Request
(IR) on 28 June 2022 consisting of 15 items, four of which related to Traffic.
The previously submitted development plans have been amended in response to the feedback received from
NSC through the information request process, in addition the proposed enrolment has increased by two
children, from a 94 child centre to a 96 child centre.
1.3 Assessment Scope
The intent of this TIS is to document a revised assessment on the traffic engineering related items within NSC’s
Driveways and Parking Code and Transport Code for the revised development scheme. Supplementing this TIS
is a cover letter also prepared by SLR which specifically addresses the Traffic items listed within NSC’s IR dated
28 June 2022.
Page 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - Attachment 4 - Traffic Impact Statement.pdfRelated documentApplication case desk ↗
About this file
- File size
- 10.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.