Original source · versioned page text
Development Application Part 1 of 2 Covering Letter, IDAS Forms OPW13/0100
Very large file (12.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.
.._,."..
SCC CORRESPONDENCE
Place Barcode here
/) 1 "1 1 1 1 "1 1 1 1 "1"1 1 1 1 1 1 1 1 1 1 "1
80603666
THIS IS THE FIRST PART OF A
MULTIPLE PART RECORD
Checklist \~~Of ~
/,
(PI~Cle)
<,..
\ 00
~ /"
’-:/~,~~:..~.~,:~~~: ~:,~~,’:(~J~
,’-,
"
,/
"
’..
’""
"
’’’~"’;
... -
j ’-.
"’\
’.... [80X:d-S.\.~~:....\..O.......\LW
[OCR of page images]
9013 fal SCC CORRESPONDENCE
ee ~enos lift
8 Vv THIS IS THE FIRST PART OF A
MULTIPLE PART RECORD
” Checklist \Part | of &
J A (Please Circle)
yo Application number: W 216100
°S<. CADocuments and Settings\eje\Desktop\Multi Part Record Cover Sheet FIRST PART (4).doc
Cc
Boxed DN BOr: AO).
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.
Full text of the other 16 pages
Page 2
8 February 2013
Buckley Vann
TOWN PLANNING CONSULTANTS
Our Reference: 12-3932 DEVELOPMENT PROCESSES
The Chief Executive Officer
Sunshine Coast Regional Council
Development Advice,
^..~..~._,
Due Diligence.
Project Management.
STRATfGIC PLANNING
I
Locked Bag 72
Sunshine Coast Mail Centre QLD 4560
.
Planning Schemes.
Natural Resource Management.
Local Area Planning.
Rural Planning.
SPECIALIST PLANNING
[
Dear Sir/Madam
RE: APPLICATION FOR OPERATIONAL WORKS - PLACING AN
Social Planning.Research.
Training and Coaching.Tours.
Expert Advice to Courts.Planni,ng
for Hospitals, Ports and Schools.
I
ADVERTISING DEVICE ON PREMISES AT 14 HASTINGS STREET,
NOOSA HEADS AND DESCRIBED AS LOT 7 RP 802632
In accordance with s260 of the Sustainable Planning Act 2009, please find attached a
code assessable development application seeking a development permit for
operational works for placing an advertising device on premises (not associated with a
material change of use) at 14 Hastings Street, Noosa Heads, and more formally
described as Lot 7 RP 802632.
The applicant for this application is Gallagher Jeffs Consulting and all correspondence
should be addressed to the applicant c/- Buckley Vann Town Planning Consultants.
Furthermore, in accordance with s263 of the Sustainable Planning Act 2009, owners
consent is not required for a development application for operational works.
In support of the application, please find attached the following documentation:
5 copies of the planning report and proposal plans (including an electronic copy);
IDAS Application Form 1 and 6; and
a cheque for $722 in accordance with Council’s current fee schedule for a General
Sign and Low/Medium Impact Sign under the Noosa Plan.
The accompanying re-purt demonstrates that the proposed development is consistent
with the requirements of the current Noosa Plan, including the relevant provisions of
the Advertising Devices Code. Accordingly, the application should be approved subject
to suitable conditions.
If you have any queries regarding this matter please do not hesitate to contact me on
38521822.
Yours faithfully,
BUCKLEY VANN
Town Planning Consultants
~/lIVt{/~
SHANNON MCGUIRE
Principal Planner BRISBANE
140 Brunswick St
PO 60x205
Fortitude Valley Q 4006
Tel 0738521822
Fax 07 38S2 1750
ABN4S0S64217S9
-1-
[email protected]
www.buckleyvann.com.au
Page 3
,111111 Integrated Development Assessment System form
Application Details - IDAS form 1
(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)
You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
necessary information and documentation will result in your application not being a properly made application.
For all development applications, you must:
.
complete this form (Application details -IDAS form 1)
complete any other forms relevant to your application
.
provide any mandatory supporting information identified on the forms as being required to accompany your
application.
All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable
Planning Regulation 2009.
Applicant details (note:the applicant is the person responsible for making the application and need not be the
owner of the land. The applicant is responsible for ensuring the information provided on all IDAS application forms is
correct. Any development permit or preliminary approval that may be issued as a consequence of this application will
be issued to the applicant.)
Please note: If there is more than one applicant, provide additional applicant details by clicking the "Add another
applicant" button below.
Namels (individual or company name in full)
Gallagher Jeffs Consulting c/- Buckley Vann Town Planning
Consultants
For companies, contact name IShannon McGuire
Postal address
Buckley Vann Town Planning Consultants, PO Box 205
Fortitude Valley QLD 4006
Contact phone number 10738521822
Mobile number (non-mandatory)
Fax number (non-mandatory) 10738521750
e-mail address (non-mandatory) [email protected]
1. What is the nature of development proposed? (tick all applicable boxes)
o material change of use of premises
o building work
cg] operational work
o reconfiguring a lot
Department of Infrastructure and Planning QPlan l\\\... Queensland
l.\’" Governmen l
Page 4
DDD
12. What type of approval is being sought?
I2.?J development permit
D preliminary approval
D both -
provide details below
3. Is the application for a mobile and temporary environmentally relevant activity (ERA)?
? "
I2.?J No
DYes complete table A and then go to question 5
-
4. L cation of the premises (complete table B and/or table C as applicable. Identify each lot in a separate row)
Table B - street address/lot for the premises or street address/lot on plan for the land adjoining or adjacent to the
premises
.’
Loton plan
Street Address
description
Local government area
Unit Street Street name and official Post Plan type (e.g. Logan,Cairns)
Lot No.
No. No. suburb/locality name code and plan no.
Sunshine Coast Regional
1 N/A 14 Hastings Street, Noosa Heads 4567 7 RP 802632
Council
I2.?J Street address / lot on plan
Street address / lot on plan for the land adjoining or adjacent to the premises (appropriate for development in
D water
e.g. jetty, pontoon)
Table C premises coordinates (appropriate for development in remote areas, over part of a lot or in water e.g.
-
channel dredging in Moreton Bay)
Coordinates (note: place each set of
coordinates in a separate row) Zone Local government
Datum
reference area (If applicable)
Easting Northing Latitude Longitude
D GDA94
D WGS84
1
D other
. ,
~ __
"
I;",~~~’ v~~~_~Ji 1>, I
~"JNI;’ r", ,~"~,,I , , , r’
Mfli’ ,
II II lit’ tlo1 ~1"
51 To~~1 area,"o~ the premises of!wh~~~ tli~ devel p’l’e’;l~’he!opose~ (indicate hectares.S!r’.Q12) -
..._.1i!>Jor ~
9,946m2
6. Current use/s of the premises (e.g. vacant land, house, apartment building, cane farm, etc.)
Sheraton -Resort and Spa, restaurant and specialty retail shops.
7. Provide a brief description of the proposal (e.g. six unit apartment building, 30 lot residenti l subdivision etc.)
Proposed installation of advertising d vices on premises: 3 x freestanding signs, 1 x below awning sign, 1 x wall sign
and updating/recladding an existing free standing sign, associated with the Sheraton Noosa Resort and Cato’s
Restaurant.
Application Details - IDAS form 1
Version 1.018 December 2009
Page 5
r.
DDD
8. Is owner’s consent required for this application? (refer to notes at the end of this form for more information)
~ No
DYes complete either table D, table E or table F as applicable
-
9. Does the application involve a state resource? (e.g. the application involves state land, or taking quarry
materials. Refer to the notes at the end of this form for more information)
~No DYes -
complete table G
10. Identify if any of the following apply to the premises (tick applicable box/es)
D adjacent to a water body, watercourse or aquifer (e.g creek, river, lake, canal) complete table H
-
D on strategic port land under the Transport Infrastructure Act 1994 complete table I
-
D in a tidal water area -
complete table J
11. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow,
water, etc.)
~No DYes -
ensure the type, location and dimension of each easement is included in the plans submitted
12. Does the proposal include new building work or operational work on the premises? (including any
services)
D No ~Yes -
ensure the nature, location and dimensions of proposed works are included in plans submitted
13. Is the payment of a portable long service leave levy applicable to this application? (refer to the notes at the
end of this form for more information)
~ No -
Go to question 15 DYes
15. Has the local government agreed to apply a superseded planning scheme to this application under
section 96 of the Sustainable Planning Act 2009?
~ No
DYes provide details below
-
16. List below all of the forms and supporting information that accompany this application (include all IDAS
forms, checklists, mandatory supporting information etc. that will be submitted as part of this application. Note: this
question does not apply for applications made online using Smart eDA)
Method of lodgement to
Description of attachment or title of attachment
assessment manager
,
1 Planning Report, IDAS forms, Proposal Plans mail
117. Applicant’s declaration
f’J’I By making this application, I declare that all information in this application is true and correct (note: it is
16I unlawful to provide false or misleading information).
Application Details -
IDAS form 1
Version 1.0 18 December 2009
Page 6
~
ODD
Notes for completing this form
Question 8:
. Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is required
for an application. Section 260(1 )(e) of the Sustainable Planning Act 2009 provides that if the owner’s consent is
required under section 263, then an application must contain, or be accompanied by, the written consent of the
owner, or include a declaration by the applicant that the owner has given written consent to the making of the
application.
. Owner’s consent is not required for a mobile and temporary ERA.
Question 9:
. Section 264 of the Sustainable Planning Act 2009 provides that if a development involves a state resource, a
regulation may require the application to be supported by certain evidence prescribed under the regulation.
Schedule 14 of the Sustainable Planning Regulation 2009 prescribes the state resources for which evidence is
required to be given, and the evidence required, to support the application.
Question 13:
. The Building and Construction Industry (Portable Long Service Leave) Act 1991 prescribes when the portable
long service leave levy is payable.
. The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy
are prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002.
Question 14:
. The portable long service leave levy need not be paid when the application is made, but the Building and
Construction Industry (Portable Long Service Leave) Act 1991 requires the levy to be paid before a development
permit is issued.
.
Building and Construction Industry Notification and Payment Forms are available from any Queensland post
office or agency, on request from QLeave, or can be completed on the QLeave website at
www.gleave.gld.gov. au. For further information contact QLeave on 1800 803 481 or www.gleave.gld.gov.au.
Privacy -the information collected in this form will be used by the Department of Infrastructure and Planning (DIP)in
accordance with the processing and assessment of your application. Your personal details will not be disclosed for a
purpose outside of the IDAS proces.s, except where required by legislation (including the Right to
Information Act
2009) or as required by Parliament. This information may be stored in a departmental database. The inform tion
collected will be retained as required by the Public Records Act 2002.
OFFICE USE ONLY
Date received
I Reference numbers
NOTIFICATION OF ENGAGEMENT OF A PRIVATE CERTIFIER
Council. I have been engaged as the private certifier for the
To:
building work referred to in this application.
Date of BSA .Certification Building
Name
engagement license number classi.fication/s
Application Details -
IDAS form 1
Version 1.0 18 December 2009
Page 7
DuD
QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable)
Date receipted
QLeave Project Amount form sighted by Name of officer who
Description of the work Date paid
Number paid ($) assessment sighted the form
manager
11
The Sustainable Planning Act 2009 (SPA)is administered by the Department of Infrastructure and Planning. This
form and all other required applfcation materials should be sent to your assessment manager and any referral
agencies.
Application Details -
IDAS form 1
Version 1.0 18 December 2009
Page 8
111111 Integrated Development Assessment System form
I
Building or operational work assessable
against a planning scheme IDAS form 6 -
(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)
This form must be completed for development applications for building works or operational work assessable against
a planning scheme.
You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
necessary information and documentation will result in your application not being a properly made application.
For all development applications, you must:
.
complete Applicant details -
IDAS form 1
.
complete any other forms relevant to your application
.
provide any mandatory supporting information identified on the forms as being required to accompany your
application.
All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning
Regulation 2009.
This form can also be used for development on strategic portland under the Transport Infrastructure Act 1994.
1. What is the nature of the work that requires assessment against a planning scheme? (tick applicable box/es)
D building work complete table A
-
[g]operational work c.omplete table B
-
Table B
What is the nature of the operational work made assessable in the planning scheme? (tick applicable box/es)
D road works D stormwater D water infrastructure
D drainage Works D earthworks D sewerage infrastructure
D landscaping [g] sign age D clearing vegetation under the planning scheme
D other please specify below
-
What type of approval is being sought? (if you have indicated multiple works in the above question, please
use an attachment to this form to detail each approval request)
[g]development permit D preliminary approval D both specify below
-
Is the operational work necessary to facilitate the creation of new lots? (e.g. subdivision)
[g]No DYes -
specify the number of lots being created
Are there any current approvals associated with this application? (e.g. material change of use)
[g]No DYes -
provide details below
Department of Infrastructure and Planning QPlan ~"l\"- Queensland
,
l_\" Government
Page 9
ODD
2. What is the dollar value of the proposed building work? (inc GST, materials and labour) $0.00
""\
Building and operational work assessable against a planning scheme -IDAS form 6
Version 1.0 18 December 2009
Page 10
DDD
3. Confirm the following mandatory supporting information accompanies this application
-.
Confirmation
Method of lodgement
of lodgement
All applications for operational works
site plans drawn to scale which show the following:
. the location and site area of the land to which the application relates
(relevantland)
. the north point
. the boundaries of the relevant land
. the allotment layout showing existing lots, any proposed lots (including
the dimensions of those lots), existing or proposed road reserves, [g]confirmed
building envelopes and existing or proposed open space (note:
numbering is required for all lots)
.
any existing or proposed easements on the relevant land and their
function
.
any access limitation strips
. all existing and proposed roads and access points on the relevant land
a statement about how the proposed development addresses the local
government’s planning schemes arid any other planning documents [g]confirmed mail
relevant to the application
Applications for operational works involving earthworks (filling and excavating)
drawings showing:
.
existing and proposed contours
.areas to be cut and filled
. the location and level of any permanent survey marks or reference
stations used as datum for the works Dconfirmed
. the location of any proposed retaining walls on the relevant land and
their height
. the defined flood level (if applicable)
. the defined fill level (if applicable)
Applications for operational works involving roadworks
drawings showing:
.
.
existing and proposed contours
. the centre line or construction line showing chainages, bearings, offsets
if the construction line is not the centreline of the road and all
intersection points
. information for each curve including tangent point chainages and
offsets, curve radii~ arc length, tangent length, superelevation (!f
applicable) and curve widening (if applicable)
. kerb lines including kerb radii (where not parallel to centreline) and
tangent point changes (where not parallel to centreline)
.
edge of pavement where kerb is not constructed Dconfirmed
.
position and extent of channelisation
. location and details of all traffic signs, guideposts, guardrail and other
street furniture
.
pavement markings including details on raised pavement markers
. catch pit, manhole and pipeline locations
.
drainage details (if applicable)
.cross road drainage culverts (if applicable)
. concrete footpaths and cycle paths
. location and details for access points, ramps and invert crossings
.
changes in surfacing material
Buildmg and operatIonal work assessable against a plannmg scheme /DAS form 6
-
Version 1.0 18 December 2009
Page 11
DDD
Confirmation
Method of lodgement
of lodgement
Applications for operational works involving stormwater drainage
drawings showing:
.
existing and proposed contours
.
drainage locations, diameters and class of pipe, open drains and
easements
Dconfirmed
. manhole location, chainage and offset or co-ordinates and inlet and
outlet invert levels
. inlet pit locations, chainage and offset or co-ordinates and invert and
kerb levels
Applications for operational works involving water. reticulation
drawings showing:
. kerb lines or edge of pavement ~here kerb is not constructed
. location and levels of other utility services where affected by water
reticulation works
.
pipe diameter, type of pipe and pipe alignment
. water main alignments
D confirmed
. water supply pump station details (if applicable)
. minor reservoir details (if applicable)
. conduits
. location of valves and fire hydrants
. location of house connections (if applicable)
. location of bench marks and reference pegs
Applications for operational works involving sewerage reticulation
drawings showing:
. location of all existing and proposed services
. location of all existing and proposed sewer lines and manhole locations
. location of all house connection branches
.kerb lines or edge of pavement where kerb is not constructed
.
chainages Dconfirmed
.
design sewer invert levels
.
design top of manhole levels
.
type of manhole and manhole cover
.
pipe diameter, type of pipe and pipe alignment
.location of house connections (if applicable)
.sewer
pump station details (if applicable)
Applications for operational works involving street lighting
drawings showing:
.location of all
light poles and service conduits
. location of all other cross road conduits
.
type of wattage and light~ng
Dconfirmed
.
any traffic calming devices
. additional plans for roundabouts and major roads (if applicable)
. details of any variations to normal alignment
. details of lighting levels
Building and operational work assessable against a planning scheme -IDAS form 6
Version 1.0 18 December 2009
Page 12
DDD
Confirmation
Method of lodgement
of lodgement
Applications for operational works involving public utility services
drawings showing:
.
any existing light poles and power poles
.
any existing u’:lderground services Dconfirmed
. details of proposed services
. alternation to existing services
Applications for operational works involving landscaping works
drawings showing:
. the location of proposed plant species
.a
plant schedule indicating common and botanical names, pot sizes
and numbers of plants
.
planting bed preparation details including topsoil depth, subgrade
preparation, mulch type and depth, type of turf, pebble, paving and Dconfirmed
garden edge
. the location and type of any existing trees to be retained
. construction details of planter boxes, retaining walls and fences
. the proposed maintenance period
.
irrigation system details
Notes for completing this form:
. This form can also be used for development applications for building works or operational works assessable
against the land use plan for Cairns airport land or Mackay airport land. Whenever a planning scheme is
mentioned, take it to mean the land use plan for the airport land.
Privacy -please refer to your assessment manager for further details on the use of information recorded in
this form.
OFFICE USE ONLY
Date Received I Reference Numbers
The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning. This form and
all other required application materials should be sent to your assessment manager and any referral agencies.
Building and operational work assessable against a planning scheme IDAS form 6
-
Version 1.018 December 2009
Page 13
1111111 Integrated Development Assessment System checklist
Operational Works - IDAS Checklist 4
(Sustainable Planning Act 2009, version 1.0, 18 December 2009)
This checklist only applies when the development application seeks approval for operational works.
You should complete all questions unless the checklist indicates otherwise.
All planning and development applications require applicants to complete the following:
.
Applicant details --IDAS form 1
any forms or mandatory supporting information identified as forming part of your application.
If you are unsure of any answers to questions, phone or visit your local government, or go to the Department of
Infrastructure and Planning’s website, www.dip.gld.gov.au.
The checklist and relevant sections do not need to be completed for applications relating only to building work
requiring assessment against the Building Act 1975.
JPart 1 - General questions
1.1
I
Is the
IJ,U
proposed operational ~ork assessable under the planning scheme?
t, ,hllll’II,IHlrll ,III. 1.’1, I ".
DNo
. You must complete Building and operational work assessable against a planning scheme -
IDAS
~Yes form 6
. Continue on to question 1.3
1.3 Is any part of the premises located in part of a future state-controlled road or within 100 metres of a
state-controlled road?
~No . It is recommended that you complete part 2 (starting from question 2.1) of this checklist.
DYes . It is recommended that you complete part 2 (starting from question 2.2) of this checklist.
1.4 Does State Planning Policy 2/02: Planning and Managing Development Involving Acid Sulfate Soils
apply to the development?
~No
DYes . It is recommended that you complete part 3 of this checklist.
1.5 Is there any proposed operational work for filling or excavation?
~ No . It is recommended that you complete part 4 (starting from question 4.5) of this checklist.
0 Yes . It is recommended that you complete part 4 (starting from question 4.1) of this checklist.
Department of Infrastructure and Planning QPlan .’i t~\\.. Queensland
,’. ,_\" GovernmenL
Page 14
. :..
ODD . .
1.6 Is any of the proposed operational work listed in schedule 12 of the Sustainable Planning Regulation
2009 and does it exceed the specified threshold?
rgJ No
. This applic tion requires assessment by the Department of Transport and Main Roads as a
DYes concurrence agency
Section reference:
. Sustainable Planning Regulation 2009, schedule 7, table 3, item 14
1.7 Is any of the proposed operational work listed in schedule 13 of the Sustainable Planning Regulation
2009 and does it exceed the specified threshold?
rgJ No
. This application requires assessment by the Department of Transport and Main Roads as a
DYes concurrence agency
Section reference:
. Sustainable Planning Regulation 2009, schedule 7, table 3, item 15
1.8 Is any part of the premises in an interim koala habitat protection area identified under the South East
Queensland Koala state planning regulatory provisions (SEQ Koala SPRP)?
rgJ No
DYes . It is recommended that you complete part 5 of this checklist.
1.9 Is any of the proposed operational work associated with reconfiguring a lot and the reconfig uration is
also assessable?
rgJ No
DYes . It is recommended that you complete part 6 of this checklist.
1.10 Does the Vegetation Management Act 1999 apply to any of the proposed operational work for the
clearing of native vegetation?
’.
rgJ N
D Yes . It IS recommended th at you complete part 7 ofthi s ch eckhst.
1.11 Is any of the proposed operational work for any thing constructed’or installed that allows, under the
Water Act 2000, for taking or interfering with water from a watercourse, lake or spring (otherthan
using a water truck to pump water; and other than under the Water Act 2000, section 20(2), (3)or (5),
or from a dam constructed on a watercourse or lake?
rgJ No . It is recommended that you complete part 8 (starting from question 8.8) of this checklist.
DYes . It is recommended that you complete part 8 (starting from question 8.1) of this checklist.
1.12 Is any of tile proposed operational work tidal work, other than excluded work defined under the
Sustainable Planning Regulation 2009?
rgJ No
DYes . It is recommended that you complete part 9 of this checklist.
’
,
Operational works /DAS checklist 4
-
Version 1.0 December 2009
Page 15
ODD
1.13 Is any of the operational work proposed to be carried out within a coastal management district?
~No
DYes . It is recommended that you complete part 10 of this checklist.
1.14 Is any of the proposed operational work for constructing or raising waterway barrier works under the
Fisheries Act 1994?
~No
DYes . It is recommended that you complete part 11 of this checklist.
1.15 Is any of the proposed operational work to be carried out completely or partly within a declared fish
habitat area under the Fisheries Act 1994?
~No
DYes . It is recommended that you complete part 12 of this checklist.
1.16 Is any of the proposed operational work removing, destroying or damaging marine plants under the
Fisheries Act 1994?
~No
DYes . It is recommended that you complete part 13 of this checklist.
1.17 Is any of the operational work proposed to be carried out in a wild river area declared under the Wild
Rivers Act 2005?
~No
DYes . It is recommended that you complete part 14 of this checklist.
1.18 Is any part of the premises located in part of a future state-controlled road or within 100 metres of a
state-controlled road?
~ No
DYes . It is recommended that you complete part 15 of this checklist.
Ipart 2 State-controlled roads
-
2.1 Is the proposed operational work for filling or excavating listed in the Sustainable Planning
Regulation 2009 schedule 11 and does it exceed the threshold or combined threshold?
~ No . End of part 2 of this checklist.
. This application requires assessment by the Department of Transport and Main Roads as a
DYes
concurrence agency.
. End of part 2 of this checklist.
Section reference:
Sustainable Planning Regulation 2009, schedule 7, table 3, items 1 (b)and 2
Ipart 4 Easements and Substations
-
Operational works -IDAS checklist 4
Version 1.0 December 2009
Page 16
.,
DDD
4.5 Is any part of the premises subject to an easement in favour of the holder of Pipeline Licence Number
1 issued under the Petroleum Act 1923 for the construction or operation of the Moonie to Brisbane
strategic pipeline?
IZI No . End of part 4 of this checklist.
DYes . This application requries assessment by the pipeline licen~e holder as an advice agency.
Section reference:
. Sustainable Planning Regulation 2009, schedule 7, table 3, items 9(a), 9(b) and 17
IPart 8 Taking or interfering with water
-
8.8 Is any of the proposed operational work for any thing constructed or installed that allows, under the
Water Act 2000, for taking or interfering with artesian water (other than using a water truck to pump
water)?
IZI No
. You must complete Taking artesian or sub-artesian water -
IDAS form 12.
DYes . This application requires assessment by the Department of Environment and Resource
Management as a concurrence agency.
,
8.9, Is any of the proposed operational work for any thing constructed or installed that allows, under the
Water Act 2000, for taking overland flow water (other than using a water truck to pump wat r)?
I~NO 10
Go to question 8.12.
DYes
tI’; r,
8.12 Is any of the proposed operational work for any thing constructed or installed that allows, under’the
Water Act 2000, for taking or interfering with subartesian water (other than using a water truck to
pump water)?
Go to question 8.14
I~NO 10
DYes
8.14 Does any of the proposed operational work for any thing constructed or installed that allows, under
the Water Act 2000, for interfering with overland flow water (otherthan using a water truck to pump
water)?
Go to question 8.19
I~NO 10
DYes
8.19 Is the proposed operational work for the following?
for the construction of a referable dam as defined under the Water Supply (Safety
DYes [8J No
and Reliability) Act 2008
to increase the storage capacity of a referable dam by more than 10 per cent DYes [8J No
. If yes to any of the above you must complete Referable dam -IDAS form 16.
. This application requires assessment by the Department of Environment and Resource Management
(DERM).If DERM..is not the assessment manager for the application, the role of the agency will be as a
concurrence agency and you must give DERM a copy of the application
Operational works -IDAS checklist 4
Version 1.0 December 2009
Page 17
DDD
Section reference:
. Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, items 3 and 4
. Sustainable Planning Regulation 2009, schedule 5, part 1, table 4, items 3 and 4
. Sustainable Planning Regulation 2009, schedule 7, table 2, items 9, 10 and 11
. Water Act 2000, section 966A and 9668 (note: no current wild river declaration identifies taking or interfering
with subartesian water as assessable)
. Wild Rivers Act 2005, section 43A
. Wild Rivers Code (note:this code does not currently contain applicable provision for taking or interfering with
artesian water)
. Relevant wild river declarations
Notes for completing this form:
.
Applicant details IDAS form 1 and Development application assessment IDAS checklist 1 must be
- -
completed for all development applications to be considered.
. The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning.
Privacy -
please refer to the assessment manager for further details on the use of information recorded in
this form.
Disclaimer:
While the Department of Infrastructure and Planning (DIP)believes that the information contained on this form and
provided as part of this process will be of assistance to you, it is provided on the basis that you will not rely on the
information without first making your own enquiries regarding the interpretation and application of the applicable
legislation to your cIrcumstances.
To the full extent permitted by law DIP expressly disclaims all liability (including but not limited to liability for
negligence) for errors or omissions of any kind or for any loss (including direct and indirect losses), damage or other
consequence which may arise from your reliance on this process and the information contained on this form.
Operational works -
IDAS checklist 4
Version 1.0 December 2009