Original source · versioned page text
Engineering Operational Works Plans
Attached to the e-mail Application for operational works - 108 Black Mountain Range Road Black Mountain.
Original PDF page 8, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn CONTROL LINE
190.988
6.336
192.700
3.786
192.287
192.283
192.178
3.626
3.500
0.000
187.771
4.343
189.570
189.480
3.500
187.349
0.500
187.259
3.500
0.500
3.0% 3.0% 1:2
-1:2
3.0% 1:2
-1:2 3.0%
-1:2
Datum: RL 189.00 Datum: RL 187.00 Datum: RL 185.00
CH 50.000 CH 100.000 CH 148.000
3m
LOT 2
191.916
7.164
ACCESS
ROCK GABION RETAINING
WALL TO MANUFACTURERS
192.418
192.313
3.500
0.000
190.084
SPECIFICATIONS
189.994
3.500
0.500
1:2
188.140
1:2
4.219
3.0%
-1:2
187.781
187.691
3.500
3.0%
0.500
BATTER TO BE STABILISED AS DIRECTED
-1:2
BY GEOTECHNICAL ENGINEER 1:2
3.0%
-1:2
0.7m
Datum: RL 189.00 Datum: RL 187.00 Datum: RL 186.00
CH 40.000 CH 90.000 CH 140.000
191.364
191.259
3.500
0.000
192.984
192.879
3.500
188.830
0.000
3.814
188.674
188.584
3.500
0.500
19.1%
3.0%
3.0% 1:2
1m
-1:2 -1:2 3.0% 1:2
-1:2
Datum: RL 190.00 Datum: RL 188.00 Datum: RL 186.00
CH 30.000 CH 80.000 CH 130.000
189.635
4.811
192.331
4.832
192.103
192.106
192.077
4.456
191.972
188.979
4.377
3.500
188.889
3.500
0.000
0.500
193.690
193.585
3.500
0.000
3.0% 1:2
3.0%
3.0% 1:2
1:2 3.0%
3.0% -1:2
-1:2 -1:2
0.6m
Datum: RL 191.00 Datum: RL 189.00 Datum: RL 186.00
CH 20.000 CH 70.000 CH 120.000
6m
DRIVEWAY ACCESS
3m
193.485
PASSING BAY
6.460
190.207
5.366
LOT 2
6m ACCESS
189.274
192.255
189.184
192.180
3.500
6.000
192.075
3.500
0.500
DRIVEWAY ACCESS
0.000
1.3m
PASSING BAY 1:2
194.185
6.000
194.005
0.000
3.0% 3.0% 3.0%
-1:2 -1:2
BATTER TO BE STABILISED AS DIRECTED
-1:2
3.0% 1:2 BY GEOTECHNICAL ENGINEER
Datum: RL 192.00 Datum: RL 189.00 Datum: RL 186.00
CH 10.000 CH 60.000 CH 110.000
CROSS SECTIONS
SCALE 1:100 (A1), 1:200 (A3)
0 2 4 6 8 10 Meters
SCALE 1:100 (A1), 1:200 (A3)
NOTE: ONLY DRAWINGS MARKED "FOR CONSTRUCTION" AND BEARING AN ORIGINAL SIGNATURE SHALL BE USED FOR CONSTRUCTION Design:
PURPOSES.
SWT PROJECT: DRAWING TITLE:
ALTA PROJECTS
Drawn: SWT
A.B.N. 611355330 ROADWORK CROSS SECTIONS
FOR APPROVAL Date: July 2020 26 Memorial Avenue, Cotton Tree PROPOSED SUBDIVISION ESTATE
NOT FOR CONSTRUCTION PO Box 559, Cotton Tree, QLD, 4558 Revision Sheet
Checked:. . . . . . . . . . .
Tel (07) 5475 4125 Fax (07) 5479 1607
Email: [email protected]
at 108 BLACK MOUNTAIN RANGE ROAD, BLACK MOUNTAIN
DRAWING No:
A6578/20/R03 B 3 of 4
STEPHEN ROBERTS
B
A
31/08/2021
16/08/2021
ISSUE FOR APPROVAL
ISSUE FOR APPROVAL
S.T.
S.T.
S.R.
S.R.
.......................
DIRECTOR APPROVAL Datum AHD
Web: http://www.alta.net.au for TOTAL CONCEPT HOMES
REV DATE DESCRIPTION BY CHKD RPEQ - 7665 A1 SHEET SIZE FILENAME : A6539 - R03 ROADWORK CROSS SECTIONS.dwg - DATE : 1/9/21 - 11:04am - XREF's: X-Base; X-Survey; H-Approved-SR; H-Checked-SR Council Ref: ............
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.