Project Ref: 260104




03 June 2026


Noosa Council
PO Box 141
Tewantin QLD 4565


Attention: Daniel Epps


Dear Daniel,


Response to Council Information Request – Operational Works

Address: 85 Gympie Street, Tewantin (Lot 51 on SP260161)

Council Reference: OPW26/0055


Reference is made to the Information Request issued by Noosa Shire Council on 19/05/2026.


In accordance with Section 13 of the Development Assessment Rules, this correspondence
responds to Council’s Information Request in full and includes the following supporting
documentation:
    -    Attachment 1 – Amended Civil Engineering Plans, prepared by Lyndsay Consulting
    -    Attachment 2 – Engineering Response to Information Request, prepared by Lyndsay
         Consulting


Information Request Item 1 - Connection of Downpipes
   Lindsay’s Operational Works Stormwater Plan (22-0416-F22, Rev. E) dated 10 April 2026
   details that the existing downpipes will be connected to the new drainage pipe.


   It is unclear to Council if these downpipes will connect directly to the new sealed pit or to
   the captive relief line.


   Council suggests that the head losses from connecting to the captive relief line wouldn’t
   allow flows from the downpipes to discharge to Gympie Street and would discharge via the
   level spreader to the downstream property.
Log in to download the original file

OPW26-0055 - Response to Information Request.pdf · 84 KB (small file)

Full text of the other 2 pages

Page 2

   1. Provide additional clarifying if the existing downpipes will connect directly to the new
   sealed pit. The additional detail must be prepared by a suitably qualified person (RPEQ).


Response
Lyndsay Consulting have prepared amended Civil Engineering Plans (Attachment 1), which
addresses Information Request Item 1. Further, the provided Engineering Response to
Information Request (Attachment 2) includes the following statement ‘…all existing downpipes
are required to be diverted and connected to new captive pipework which is to discharge to the
kerb and channel’.


Information Request Item 2 – Hydraulic Calculations
   No hydraulic calculations have been provided as referenced in Lindsay’s Operational Works
   Stormwater Plan (22-0416-F22, Rev. E) dated 10 April 2026.


   2. Provide hydraulic calculations demonstrating the charged line is functional for the
   entire roof area.


Response
Hydraulic calculations have been provided on the amended Civil Engineering Plans (Sheet F26)
(Attachment 1).


Information Request Item 3 – Level Spreader
   Provide comment from a suitably qualified person (RPEQ) ` the level spreader complies
   with Section 3.9 of QUDM whereby there is no ultimate nuisance caused to the downstream
   neighbour.


Response
As detailed in the Engineering Response to Information Request (Attachment 2), the Civil
Engineering Plans (Attachment 1) have been amended to alter the slow release of the captive
pipe to empty into a rubble pit. Rubble pit calculations added onto Page F22.




This document addresses all matters raised by Council within the Information Request dated
19/05/2026 and we look forward to the application progressing through the assessment process
as detailed within the Development Assessment Rules .


Should you have any questions about the information provided within this Information Response
please contact me direct.

Page 3

Kind Regards,

Michael Lyell
Director
URBN Town Planning

Mobile: 0475 399 720 Email: [email protected]

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.