RFI - 20220156 Kauri St SWMP Rev B

of 70

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

                                            Figure 3.2 – DRAINS Pre-development catchment




                                           Figure 3.3 – DRAINS Post-development catchment


The results of the modelling against the range of design storms for the development under the existing and
proposed development conditions are shown in Table 3.1 Existing and proposed unmitigated site peak discharge
rates.
                              Table 3.1 Existing and proposed unmitigated site peak discharge rates

                                                                           Kauri Street
                                                                                                         Qchange
                                           A.E.P               Qexisting      Qproposed     Qchange       (%)
                                                               (m³/s)         (m³/s)        (m³/s)
                                            1EY                 0.021          0.043         0.022       105%
                                            50%                 0.026          0.052        0.026        100%
                                           0.2 EY               0.044            0.08       0.036         82%
                                            10%                 0.060          0.089        0.029         48%
                                             5%                 0.075          0.112        0.037         49%
                                             2%                 0.094          0.134         0.04         43%
                                             1%                 0.106          0.147        0.041         39%




Project number 20220156                                                                                              Page 9 of 27
File RECOR Stormwater Management Report - 20220156.docx, 2022-10-28 Revision 1

P +61 7 5211 1003                         A 37 Mary St, Noosaville Qld 4566             E [email protected]    recorconsulting.com
Log in to download the original file

RFI - 20220156 Kauri St SWMP Rev B.pdf · 8.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.