RFI - 20220156 Kauri St SWMP Rev B
Figure 3.2 – DRAINS Pre-development catchment
Figure 3.3 – DRAINS Post-development catchment
The results of the modelling against the range of design storms for the development under the existing and
proposed development conditions are shown in Table 3.1 Existing and proposed unmitigated site peak discharge
rates.
Table 3.1 Existing and proposed unmitigated site peak discharge rates
Kauri Street
Qchange
A.E.P Qexisting Qproposed Qchange (%)
(m³/s) (m³/s) (m³/s)
1EY 0.021 0.043 0.022 105%
50% 0.026 0.052 0.026 100%
0.2 EY 0.044 0.08 0.036 82%
10% 0.060 0.089 0.029 48%
5% 0.075 0.112 0.037 49%
2% 0.094 0.134 0.04 43%
1% 0.106 0.147 0.041 39%
Project number 20220156 Page 9 of 27
File RECOR Stormwater Management Report - 20220156.docx, 2022-10-28 Revision 1
P +61 7 5211 1003 A 37 Mary St, Noosaville Qld 4566 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.