Original source · versioned page text
Updated SWMP
Figure 1-3: The development site (current and original developments) source loads from the MUSIC model
Table 1-1: Reformatted MUSIC results
(1) (2)
Development Required (3)
site pollutant load Target Total load Reduction
Pollutant Compliance
unmitigated removal for Reduction removal by Achieved (%)
source load development device (kg/yr)
(kg/yr) (kg/yr)
TSS 4,650 3,720 80% 3750 81%
TP 9.29 5.6 60% 6.9 74%
TN 51.6 23.2 45% 27 53%
GP 485 437 90% 638 100%
Information Request
Provide a copy of the MUSIC model and/or updated reporting addressing the above.
MUSIC results are as per model supplied with SMP-V2.
23-0167SMP01-V3 | Stormwater Management Plan | 33 Pavilion Street, Pomona Page 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.