Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

Updated SWMP

of 55

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Table 2-3. A time of concentration of 20.6 minutes was determined for SUB3 rational method. It can be
seen there is values are generally within ten percent difference across events assessed, indicating that the
WBNM model flows are suitable for use. Refer to Appendix B for a summary of rational method parameters
used.




23-0167SMP01-V3 | Stormwater Management Plan | 33 Pavilion Street, Pomona                           Page 20
Log in to download the original file

Updated SWMP.pdf · 8.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.