Figure 2-4: 1% (2100) AEP Peak Water Surface Elevation Reporting Locations



It is noted that flood levels at 25 Pavilion St for the 1% (2100) AEP are unaffected by the proposal at 33
Pavilion St, with exception of the small area of afflux adjacent Lot 10. In this area, water surface elevation
has increased from 83.71m AHD to 83.8m AHD. However, this has no impact on Lot 10, 25 Pavilion St, as
the 1% AEP Peak Level adjacent the site is consistent with peak level of 85.11m AHD as per previous
modelling for 25 Pavilion St (report 21-0166SMP01-V1). The afflux is reasoned to be a small area of
instability within the model and is not predicted to be observable in practice.




23-0167SMP01-V3 | Stormwater Management Plan | 33 Pavilion Street, Pomona                               Page 28
Log in to download the original file

Updated SWMP.pdf · 8.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.