Original source · versioned page text
Updated SWMP
Table 3-8: MUSIC Results – Portion of total pollutant loads for External Catchment and Site
Total Model Residual External Catchment Site – Mitigated load (less
Pollutant
load (kg/yr) Source Load (kg/yr) external catchment) (kg/yr)
TSS 2190 1290 900
TP 5.3 3.0 2.4
TN 43.5 19.0 24.5
GP 0 153 0
23-0167SMP01-V3 | Stormwater Management Plan | 33 Pavilion Street, Pomona Page 34
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.