Original source · versioned page text
Updated SWMP
3.3. Treatment Measures .......................................................................... 32
3.3.1. Bioretention System ......................................................................... 32
3.3.2. Sediment Forebays .......................................................................... 33
3.4. Results .................................................................................................. 33
4. CONSTRUCTION PHASE MANAGEMENT ...................................... 35
4.1. Erosion and Sediment Control .......................................................... 35
5. ESTABLISHMENT AND OPERATIONAL PHASE
MANAGEMENT ............................................................................... 36
5.1. Establishment ...................................................................................... 36
5.2. Operational .......................................................................................... 36
6. CONCLUSION .................................................................................. 37
7. REFERENCES.................................................................................... 38
List of Tables
Table 1-1: Reformatted MUSIC results ........................................................ 14
Table 2-7: Pavilion St Road capacity calculation using Manning’s’
equation .......................................................................................................... 17
Table 2-1: Summary of Existing Catchment Parameters .......................... 19
Table 2-2: Existing Catchment Peak Flows .................................................. 19
Table 2-3: Comparison of WBNM and Rational Method Peak Flows –
SUB3 ................................................................................................................ 21
Table 2-4: External catchment overland flow (entering site) and pipe
flow (diverted around site via Pavilion St)................................................... 22
Table 2-5: Summary of Developed Catchment Parameters ..................... 22
Table 2-6: Comparison of Peak Flows At Site Outlet (Existing Vs.
Developed)...................................................................................................... 22
Table 2-7: Summary of Basin Structure Details ......................................... 23
Table 2-8: Comparison of Peak Flows (Existing Vs. Mitigated) ................. 24
Table 2-9: Comparison of 1% AEP event across all durations (Existing
Vs. Mitigated) .................................................................................................. 24
Table 2-10: Existing and Proposed Peak discharge at the Site
Boundary. ....................................................................................................... 26
Table 2-11: 1% AEP Flood Storage Comparison. ........................................ 26
Table 2-12: Lot Levels Compared to Adjacent 1% AEP Peak Flood
Levels............................................................................................................... 27
Table 3-1: Site Stormwater Quality Objectives (Operational Phase) ....... 29
Table 3-2: Urban land use (Split Source Nodes) - Pollutant Export
Parameters ..................................................................................................... 30
Table 3-3: MUSIC Runoff Generation Parameters ..................................... 30
23-0167SMP01-V3 | Stormwater Management Plan | 33 Pavilion Street, Pomona
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.