Council archive · source document
132003.221172.6 Change to Existing Approval Notice
Officer: Jack Lewis Direct Telephone: 5329 6236 Our Reference: JLEWIS:132003.221172.6 Your Reference: N/A 18 February 2015 Ziganairre Pty Ltd PO Box 1719 NOOSA HEADS QLD 4567 Attn: Debbie MacNaught [email protected] Dear Sir/Madam Change to an Existing Approval Sustainable Planning Act 2009 I refer to your request to make a permissible change to an existing approval. On 16 February 2015 Council decided your requested changes. Details of the decision are as follows: APPLICATION DETAILS Application No: 132003.221172.6 (23657 DA) Street Address: 61 Elanda St SUNSHINE BEACH QLD 4567 Real Property Description: Lot 408 RP 48112 Planning Scheme: The Noosa Plan ((23657 DA)) DECISION DETAILS The following type of approval has been issued: Development Permit for Material Change of Use of Premises (Duplex dwelling) Council on 14 October 2004 decided to issue the following type of approval: Preliminary Approval for Material Change of Use - Duplex Dwelling In relation to representations, Council on 16 December 2004 decided to: A. Grant a development permit subject to the conditions contained in the preliminary approval issued on 14 October 2004 B. Agree to delete Conditions 1, 12 & 13 C. Agree to amend Condition 2. In relation to a request to extend the relevant period of the existing approval, Council on 9 December 2008 decided to: A. Approve a change to Condition 17 extending the relevant period until 16 December 2010. In relation to a request to extend the relevant period of the existing approval Council on 9 August 2010 decided to: A. Approve a change to Condition 17 extending the relevant period until 16 December 2012. In relation to a request to extend the relevant period of the existing approval Council on 25 July 2012 decided to: A. Approve a change to Condition 17 extending the relevant period to 16 December 2014. In relation to the request to extend the relevant period of the existing approval Council on 17 October 2014 decided to: A. Approve a change to Item 3 and Condition 17 extending the relevant period for 4 years to 16 December 2018. In relation to the request to make a change to the existing approval, Council on 16 February 2015 decided to: A. Approve a change to Conditions 2, 6, 11, 21 & 22. B. Delete Conditions 14 & 23. RELEVANT PERIOD OF APPROVAL The relevant period for this development approval finishes on 16 December 2018. CONSOLIDATED ASSESSMENT MANAGER CONDITIONS Land Use Deleted. Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Issue Plan / Document Name Date SD.101 P7 Views drawn by Ian Gorton Design Feb 15 SD.201 P7 Floor Plans drawn by Ian Gorton Design Feb 15 SD.501 P7 Elevations & Section drawn by Ian Gorton Design Feb 15 The development must be undertaken and operated in a manner that causes no detrimental effect upon the amenity of the neighbourhood by reason of the creation of excessive noise, lighting nuisance or other emissions. The development must not exceed 40% maximum site cover, as defined by the Schedule to the Planning Scheme. The development is to provide a minimum 264m2 of landscaped open space, as defined by the Schedule to the Planning Scheme. The development site must be landscaped. The works must be undertaken in accordance with an Operational Works approval and The Noosa Plan for the coastal area and must include in particular: 6.1 A minimum 1m wide landscaping strip along the side boundaries, excluding the areas adjacent to the pool and bin enclosures. 6.2 Provision of 2 x 100 Litre street trees within the road reserve. 6.3 All landscape works must be established and maintained in accordance with the approved design for the life of the development, and in a manner that ensures healthy, sustained and vigorous plant growth. All plant material must be allowed to grow to full form and be refurbished when its life expectancy is reached. 6.4 All landscape works must be maintained generally in accordance with the approved design for the life of the development. Existing trees on the site and within road reserves are to be retained, except where required to be removed due to building operations or the conduct of the approved use. The landscaped plans referred to above are to denote areas of existing vegetation or existing trees proposed to be retained. All fencing shall be setback at least 1 metre from the front property boundary, with at least half of the fencing to be setback 2 metres. The area of land between the fence and the front property boundary shall be densely landscaped to screen any fencing. Any deck areas are not to be enclosed with shutters, glass panelling or the like, thus remaining as open structures. Balustrading is to be of open and transparent materials. The maximum height of the development must not exceed 12m above the finished ground level and the natural ground level. Certification must be submitted to Council from a Licensed Surveyor which certifies that the building does not exceed the maximum height requirement of this Decision Notice. Deleted. Deleted. Deleted. Security in the form of a cash bond or trading bank guarantee to the sum of $20,000 must be submitted, to secure performance of all conditions of this approval, prior to the issue of a Development Permit for operational works. The cash bond or trading bank guarantee will be returned on performance of the conditions of approval less any costs incurred by Council in respect of enforcing performance of this permit. The requirements of this development approval are to be effected, prior to the use of the premises. Council reserves the right to call upon the bond or guaranteed sum referred to in this approval to effect compliance with conditions. This Development Permit for a Material Change of Use lapses if:- 17.1 the use has not commenced by 16 December 2018, unless application is made and approved by Council for an extension; or 17.2 the use of any premises pursuant to the Development Permit ceases. The developer must obtain all of the other Development Permits referred to in the Decision Notice, prior to obtaining a Development Permit for building works. Land Development Vehicle Access A 4.5 metre wide vehicular access driveway to serve the development shall be constructed from the Elanda Street frontage of the site. The driveway shall be designed and constructed to Council’s design standards and to grades that prevent vehicles from scraping and/or bottoming. Should any driveways be constructed to grades that do not comply with AS2890.1-1993 and AS2890.2-1989, Council will require that the driveway be removed and reconstructed to levels that do comply. All vehicles shall enter and leave the site in a forward direction. Carparking Carparking shall be provided within the site as shown on the approved plans, except as modified herein. A minimum of 3 covered carpark spaces shall be provided on site and the carparking area shall be designed to comply with the provisions of AS 2890.1-1993 with a minimum head clearance (headroom) at any point of 2.2m. Deleted. Vegetation Protection Existing trees to be retained shall be protected during the construction phase by providing temporary fencing around the trees. Plans submitted for Operational Works approval shall clearly show this. Roadworks Contributions A roadworks contribution of $1,061 towards the Coastal Major Road Network shall be paid to the Council prior to obtaining a Development Permit for Operational Works. This amount will be subject to variations in the Price Index, All Groups Brisbane from June 2004 until the date of payment. Roadworks Widening The Elanda Street frontage of the development shall be provided with kerb & channelling and bitumen road widening. The new kerb & channel shall be aligned so that it is located 8 metres off the existing kerb & channel on the western side of the road measured from the nominal face of the kerb. All associated and ancillary work including pavement correction to the existing pavement, drainage works, modification of the footpath, and adjustments to any existing infrastructure shall be undertaken to complete the roadworks widening. Plans detailing this work shall be prepared and submitted to Council for approval prior to obtaining a Development Permit for Operational Works. Frontage Works Footpath improvements such as topsoiling, grassing, and tree planting are required to the Elanda Street frontage of the site in accordance with Planning Scheme Policy PSP1 Landscaping Guidelines. Grass shall be couch, free of weeds. A new 1.2 metre wide concrete path shall be constructed along the frontage of the site in accordance with Council’s design standards and to an alignment that protects any significant vegetation or any underground services. The path shall be designed and constructed to ensure pedestrian safety using non-slip materials and to produce an evenly graded surface finish. Pathway Contributions A pathway contribution of $246 towards external major pathways, in accordance with Planning Scheme Policy PSP41 Coastal Major Pathway Contributions, shall be paid to the Council prior to obtaining a Development Permit for Operational Works. This amount will be subject to variations in the Price Index, All Groups Brisbane from June 2004 until the date of payment. Stormwater Drainage All stormwater drainage shall be collected on site and discharged so there is no net increase in stormwater runoff from the site. Plans of the drainage design shall be prepared by a Registered Professional Civil Engineer and submitted to Council prior to obtaining a Development Permit for Operational Works. Any stormwater discharged to Council’s street drainage system shall have a maximum discharge at any one location of 25 litres/second. All site stormwater drainage shall be by means of a gravity system. Sewer Mains The site shall be connected to Council’s existing sewerage reticulation systems and be constructed in accordance with Council’s standards and requirements at no cost to Council. Town Water Supply The site shall be connected to Council’s existing town water supply and be constructed in accordance with Council’s standards and requirements at no cost to Council. Each water connection to the water reticulation system shall extend to the property boundary and be metered. Where multiple units are served by a single service, multiple water meters to each individual unit shall be installed. All fees for the supply of water meters shall be paid to the Council. Service Easements A registered easement shall be created over the existing sewer main that crosses the rear of the site. The easements shall generally be parallel to and centred over the sewer main and be equivalent in width to twice the depth to invert level of the sewer at the deepest point within the allotment (measured from the finished surface) and be no less than 3.0 metres wide. In this regard, plans submitted for Operational Works approval shall accurately show the location of the easement. In addition to this the Applicant’s Solicitor shall give Council’s Solicitor an appropriate undertaking in writing that the Title Deed and the easement documents will be lodged at the Land Titles Office and any additional Titles Office forms or requisitions requiring the consent of Council will be attended to promptly. A duly executed copy of the easement shall be submitted to Council for perusal prior to the use commencing. Any changes required by Council’s Solicitor must be corrected immediately. No building or other structure shall be constructed or encroach over an easement. Any building or structure within proximity of an easement or any other public utility’s underground must have its foundations designed so that no surcharge loads are imposed upon such underground infrastructure. Foundations must be taken down a minimum of 1 metre below a line of influence measured 1 metre in the direction of the foundation from the centreline of the closest underground service and along the natural angle of repose of the foundation soil type(s). Plans, and supportive documents, detailing these proposed foundations shall be designed by a registered practicing Geotechnical Engineer and submitted with the application for a Development Permit for Operational Works. Headworks Contributions shall be paid to Council in accordance with Planning Scheme Policies PSP28 and PSP30 on Water Supply Headworks Contributions and Sewerage Headworks Contributions respectively and at the rates applicable at the time of payment. An estimate only of the contribution rates as of June 2004 under the current policies is as follows: Water Supply $ 4,255 Sewerage $ 2,905 TOTAL $ 7,160 All headworks contributions must be paid prior to the issue of a Development Permit for Operational Works. Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the headworks contributions not be paid at the due time, Council shall call upon the trading bank guarantee in full. In the event that the Development Permit for Material Change of Use of Premises lapses or is cancelled, the contribution or trading bank guarantee will be returned. Earthworks Earthworks required on site shall be carried out in accordance with Section 3.8 of Council’s Engineering Design Standards Manual and so as not to cause the ponding of water on any adjoining lands or the blockage of, or interference with any natural watercourses. Earthworks carried out on site shall not affect the structural integrity of any of the existing fences that border the development site unless it is intended to replace such fences. In this regard any fences to be replaced shall be clearly shown on the plans submitted for Operational Works approval. Erosion and Sediment Control Any person acting on this permit shall prevent erosion and sediment export from leaving the site. Site control measures such as silt fencing, controlled gravel access to the site and controlled disposal of waste, will be necessary. Plans detailing the methods of controlling erosion and sediment are required to be submitted to the Council for approval prior to obtaining a Development Permit for Operational Works. General Any damage caused to any public utility during the course of construction shall be repaired to Council’s standards and at no cost to Council. Any alteration of any public utility or other facilities necessitated by the development of the land or associated construction works external to the site shall be at no cost to Council. The transportation of all materials to and from the site shall be undertaken in a manner such that no particle matter escapes onto a public road. All vehicles carrying materials either to or from the site shall be covered to prevent materials including dust being windblown from the vehicle. A Registered Professional Engineer of Queensland shall certify engineering drawings and specifications for all engineering works, which shall be submitted in conjunction with an application for a Development Permit for Operational Works. Building Services A verification survey of the building is to be carried out by a Licensed Surveyor and a certificate lodged with Council at completion of the work confirming compliance with the maximum building height above natural surface, required by the provisions of the Planning Scheme. Environmental Health The developer must provide a suitably screened imperviously paved area large enough for all refuse and recycling containers. A wash down area is required with a cold-water tap, hose and drain outlet connected to sewer. The drain outlet is to be designed to prevent stormwater entry to the sewerage system. Swimming pool or spa pumps are to be contained in an acoustically treated enclosure or located in a manner which prevents a noise nuisance beyond the subject land in accordance with the nuisance provisions of the Environmental Protection Regulation 1998. On the spot fines apply for such offences. All lift plant including motors, shall be situated within the building or suitably provided with noise reduction measures and located as to prevent a noise nuisance beyond the subject land in accordance with the nuisance provisions of the Environmental Protection Regulation 1998. On the spot fines apply for such offences. Noise emission from air conditioning equipment shall comply with the following requirements: 49.1 The equipment shall be installed and located in a manner which prevents noise nuisance beyond the subject land in accordance with the nuisance provisions of the Environmental Protection Regulation 1998 and Council’s Local Law No. 12 - Control of Nuisances. Infringement Notices (on-the-spot fines) may apply for offences. 49.2 Submission of written certification from a suitably qualified person confirming that the noise levels comply when measured at the nearest residential boundary. This is required immediately after installation of the equipment and prior to any occupation of the building, and in a format approved by Council. 49.3 A person must not use equipment on any day if it makes or causes noise to be made – 49.3.1 Before 7am or after 10pm: More than the lower of either – 40 d(B)A 3 d(B)A above the background noise level 49.3.2 From 7am to 7pm: More than the lower of either – 50 d(B)A 5 d(B)A above the background noise level 49.3.3 From 7pm to 10pm: More than 3 d(B)A above the background noise level. REFERRAL AGENCY CONDITIONS Not Applicable APPROVED PLANS/DOCUMENTS The approved plans and / or documents for this development approval are listed in the following tables: Approved Plans Plan No. Issue Plan / Document Name Date SD.101 P7 Views drawn by Ian Gorton Design Feb 15 SD.201 P7 Floor Plans drawn by Ian Gorton Design Feb 15 SD.501 P7 Elevations & Section drawn by Ian Gorton Design Feb 15 PLANS/DOCUMENTS REQUIRING AMENDMENT Not Applicable ADVISORY NOTES The following Advisory Notes are for information purposes only and do not form conditions of approval: Building is to comply with the Building Code of Australia Section C Fire Resistance in regard to distances or protection required. Payment via credit card transaction will not be an acceptable method of payment for development contributions conditioned in this permit. The Environmental Protection Regulation 1998 and Local Law No.12 prohibit a builder from making noise from:- Monday to Saturday, before 7:00am or after 6:30pm Sunday or public holiday, at any time. A maximum penalty of $1,500 applies to an offence under these provisions. In accordance with the Environmental Protection (Water) Policy 1997, all sand, silt, mud, paint, cement, concrete, builders waste or rubbish shall not be permitted to enter or be placed where it could reasonably be expected to move into a roadside gutter, stormwater drain or a water course. On the spot fines apply for such offences. Pursuant to the Building and Construction Industry (Portable Long Service Leave) 1991 Act if the cost of operational works exceeds $80,000, then a portable long service levy is required to be paid. In accordance with Section 77.(1) of the Act, Council is required to sight the approved form issued by the Building and Construction Industry (Portable Long Service Leave) Authority that confirms that the requirements of the Act have been satisfied. A statutory declaration outlining the cost of the operational works must be submitted to Council with the lodgement of any application for operational works over the site. We advise ‘interested parties’ i.e. ‘developer’, ‘owner’, ‘tenant’ to consider their responsibilities under the Disabled Discrimination Act (DDA) in regard to the installation of disabled access and the provision of disabled facilities, and that access to this building and the provision of sanitary facilities may need to comply with the requirements of Section D Part D3 and Section F Clause F2.4 of the Building Code of Australia. Aboriginal Cultural Heritage Act 2003 There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act). The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries out an activity must take all reasonable and practicable measures to ensure the activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value of Aboriginal cultural heritage. You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any obligations under the ACH Act. PROPERTY NOTES Not Applicable PRELIMINARY APPROVAL OVERRIDING PLANNING SCHEME Not Applicable FURTHER DEVELOPMENT PERMITS REQUIRED Development Permit for Building Works - Duplex Dwelling Development Permit for Operational Works - Landscaping, Carparking and Access, Frontage Works, Stormwater Disposal, Sediment and Erosion Controls and Filling of the Site SELF ASSESSABLE CODES Not Applicable SUBMISSIONS There were no properly made submissions about the application. REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME Not Applicable RIGHTS OF APPEAL You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Sustainable Planning Act 2009 is attached. OTHER DETAILS If you wish to obtain more information about Council’s decision, electronic copies of which are available on line at www.noosa.qld.gov.au, or at Council offices. DECISION NOTICE HISTORY 132003.221172 (23657 DA) - Original Decision Notice - 14 October 2004 132003.221172 (23657 DA) - Negotiated Decision Notice - 16 December 2004 132003.221172.2 Change to an Existing Approval - 9 December 2008 132003.221172.3 Change to Existing Approval - 9 August 2010 132003.221172.4 Change to Existing Approval - 14 August 2012 132003.221172.5 Compiled Decision Notice – 17 October 2014 132003.221172.6 Change to Existing Approval – 16 February 2015 Yours faithfully JACK LEWIS DEVELOPMENT PLANNER Encl. Approved Plans/Documents Appeal Rights cc Unitywater Appeal Rights SUSTAINABLE PLANNING ACT 2009 & SUSTAINABLE PLANNING REGULATION 2009 The following is an extract from the Sustainable Planning Act 2009 (Chapter 7) 466 Appeals about decisions relating to permissible changes (1) For a development approval given for a development application, the following persons may appeal to the court against a decision on a request to make a permissible change to the approval— (a) if the responsible entity for making the change is the assessment manager for the application— (i) the person who made the request; or (ii) an entity that gave a notice under section 373 or a pre-request response notice about the request; (b) if the responsible entity for making the change is a concurrence agency for the application—the person who made the request. (2) The appeal must be started within 20 business days after the day the person is given notice of the decision on the request under section 376. (3) Also, a person who has made a request under section 369 may appeal to the court against a deemed refusal of the request. (4) An appeal under subsection (3) may be started at any time after the last day the decision on the matter should have been made. [word/footer1.xml] Page 10 of 11 [word/footer2.xml] Page 1 of 11 [word/header3.xml] 132003.221172.6 [Attachment: image1.jpeg (image text)] NOOSACOUNCIL Pest 2iopss2esm ——atgroxagngoas aoe TowotNaoeses — Florssvessi — atoomagagara [Attachment: image4.png (image text)] a mm NOOSA COUNCIL
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
132003.221172.6 Change to Existing Approval NoticeRelated documentApplication case desk ↗
About this file
- File size
- 113 KB (small file)
- File type
- DOCX
No other editions are linked here.