Appendix E
Slope Stability Report
Application for a Development Permit for
Operational Works (Earthworks, Road Work,
Drainage Work, Landscaping and Driveway)

38 Avocet Parade, Peregian Beach 4573 QLD
Lot 270 on P93113


HARBOURAGE PTY LTD
Full text of the other 59 pages

Page 2

                                                                                                            37 636 783 527

                                                                                                               PO BOX 851
                                                                                                   Moffat Beach, QLD, 4551
                                                                                           [email protected]
                                                                                             www.geotechengineering.com.au




 RG Strategic                                                                                      29 Apr 2020
 By Email                                                                                 Letter 01 Revision 00
                                                                                            Project: GE200132

 [email protected]
Dear Maree,

Report on Geotechnical Investigation
Proposed Residnetial Dwelling
38 Avocet Parade, Peregian Beach

At the request of RG Strategic, Geotech Engineering Pty Ltd (GE) undertook a geotechnical
investigation for the above project. The summary of the investigation is detailed in Table 1.


Table 1: Summary of Investigation Results

Relative Susceptibility in accordance with AGS Guidelines                         Susceptibility Rating

                                0.33                                                         Low
Notes:   The above is a summary of the detailed investigation results discussed within this report. The entire report
must be read, understood, and kept in entirety.




 Senior Geotechnical Engineer




 Billy Blake B.Eng(Civ)(Hons), CPEng, RPEQ, NER, MIEAust
Attachments: Test Location Plan, Bores, Labs, Home Owner’s Guide to Footing Maintenance



29 Apr 2020                                                                      Proposed Residnetial Dwelling

Page 3

                                                                                               37 636 783 527

                                                                                                  PO BOX 851
                                                                                      Moffat Beach, QLD, 4551
                                                                              [email protected]
                                                                                www.geotechengineering.com.au




1.0 Introduction
Geotech Engineering Pty Ltd (GE) was commissioned to undertake a geotechnical investigation
for the Proposed Residnetial Dwelling located at 38 Avocet Parade, Peregian Beach.


This report outlines the results of the investigation, laboratory testing, analysis and interpretive
reporting on the following items:
• All factual information resulting from the investigation (investigation methodologies,
   detailed desktop review, test location plans, bore logs);
• Summary of subsurface conditions and adopted subsurface conditions including
   groundwater;
• Stability assessment in accordance with AGS guidelines;
• Earthworks and site preparation comments;
• Site movements;
• Foundation recommendations and allowable bearing pressures;
• Hillside construction comments

This report must be kept in entirety.


2.0 Site Details

2.1 Detailed Description
The site can be described as typical for a residential allotment that has triggered slope stability
requirements. The site has varying grades falling away to the east at relatively moderate grades
broadly speaking initially and then becoming gently graded to the limit of the allotment at the
eastern boundary. The photograph shown on the title page of this report gives a good
indication of site conditions at the time of the walkover assessment .

2.2 Geology
Referencing available geology datasets available from QLD Globe, the site is in an area
underlain by Quartenarly aged alluvial deposits which typically comprises sands, clays, gravel,
and silt. The encountered subsurface conditions broadly agree with the expected geology.

2.3 Groundwater
During the walkover assessment, no groundwater was observed across the entire site. It must
be noted that groundwater is transient and seasonal in nature. Given this, the time at which
the walkover assessment was undertaken may not indicate worst case conditions.

2.4 Vegetation
During the walkover assessment, a variety of vegetation ranging from small shrubs to mature
trees were observed. The mature trees were all observed to be typically vertical with no
misshapen or curved trunks. Misshapen or curved trunks are usually good indicators for
previous slope instability.




29 Apr 2020                                                          Proposed Residnetial Dwelling

Page 4

                                                                                               37 636 783 527

                                                                                                  PO BOX 851
                                                                                      Moffat Beach, QLD, 4551
                                                                              [email protected]
                                                                                www.geotechengineering.com.au




2.5 Structures
At the time of the inspection, several structures were onsite that could be observed externally
without intrusive investigation. The existing structures and retaining walls typically appeared
to be performing in accordance with a structure under normal conditions suggesting no
shallow soil creep occurring. A timber fence along the northern boundary of the property has
tilted; however, it appears to be due to insufficient lateral resistance to for wind loading.

2.6 Fieldwork & Results
The fieldwork was undertaken on 23 Apr 2020 and included 3 bores drilled to to a maximum
depth of 3.5 m using a 4WD mounted auger drill rig. Any exposed faces were also inspected
to inform the results of the investigation. The subsurface conditions were logged through
tactile and visual assessment of returned spoil by an experienced geo-technician from Global
Testing.


The encountered subsurface conditions are described in detail on the attached bore logs;
however, in summary comprise minor fill over sand of loose density grading medium dense
typically below 1.0 m depth as described in the Global Testing investigation report 200309..


Groundwater measurements or the lack of groundwater are made within the bore logs
attached; however, it must be noted that groundwater is transient and will fluctuate with
seasons and time.

3.0 Land Stability

3.1 Explanatory Notes
Local authorities prepare mapping tools to aid in assessing potential slope stability
requirements. It is important to note that where a site specific investigation and slope stability
assessment are undertaken, they take precedence.


Landslides are caused where a soil or rock mass has a decrease in strength, usually attributed
to groundwater, resulting in the material not being able to maintain its own self-weight
resulting in a slope failure.


The Australian Geomechanics Society (AGS) developed a set of tools and procedures for
assessing the stability of a slope. The tools and procedures presented with the AGS
documentation form the basis of the assessment undertaken herein and their documentation
is attached for reference.


The guidelines also identify that the regulator typically sets the standard for levels of tolerable
risk. AGS defines tolerable risk as “risks within a range that society can live with so as to secure




29 Apr 2020                                                          Proposed Residnetial Dwelling

Page 5

                                                                                               37 636 783 527

                                                                                                  PO BOX 851
                                                                                      Moffat Beach, QLD, 4551
                                                                              [email protected]
                                                                                www.geotechengineering.com.au




certain benefits. It is a range of risk regarded as non-negligible and needing to be kept under
review and reduced further if practicable”.

The guides suggest that areas of moderate or greater risk should not be developed unless a
rigorous remediation plan be implemented to reduce the area to a level of Acceptable Risk.
AGS defines acceptable risk as “risk which everyone affected is prepared to accept. Action to further
reduce such risk is usually not required unless reasonably practicable measures are available at low
cost in terms of money, time and effort.”.

AGS and regulators generally accept risk levels of “low” or lower as a level of acceptable risk.

Typically where risk levels equate to a level of “low” or lower, this would be comparable to a
global stability factor of safety in excess of 1.5. Where the results of the investigation have
indicated a risk level of “low” or better, it is considered that the factor of safety against global
instability for the area of assessment is greater than 1.5.



3.2 Quantitative Landslide Stability Analysis
AGS prepared a quantitative assessment tool for determining the level of risk for a site. The
tool separates the potential hazards for a site, from a stability context, and rates them with a
level of risk frequency. The multiplication of these individual risk frequency summates as the
risk frequency rating which is then measured against the levels of risk nominated by AGS.


The results of this analysis are shown in Table 2.




29 Apr 2020                                                           Proposed Residnetial Dwelling

Page 6

                                                                                                     37 636 783 527

                                                                                                        PO BOX 851
                                                                                            Moffat Beach, QLD, 4551
                                                                                    [email protected]
                                                                                      www.geotechengineering.com.au




Table 2: Results of AGS Quantitative Risk Assessment
             Item                              Description                   Risk Level             Factor
     Natural Surface Slope              Between 5 and 15 degrees             Moderate                  0.5
   Slope Shape/Appearance                      Concave                        High                     1.5
         Site Geology                       Sedimentary rock                 Moderate                  1.0
          Soil Profile                   Residual soil >3m deep                  High                  1.5
   Regional Position on Hill                  Lower Slope                        High                  1.5
    Groundwater Evidence                    None apparent                        Low                   0.7
   Slope Instability Evidence             No sign of instability                 Low                   0.8
     Proposed Cut Depths                Cuts 1 m to 3 m in height            Moderate                  1.5
     Proposed Cut Angles                          45 to 60                    High                     1.5
          Fill Depths                       Fill <1 m in depth               Moderate                  1.1
       Fill Depth Angles                         45 to 60                        High                  1.5
       Battered Support                   Engineered - Other                 Very High                 1.5
          Type of Fill                   Track-rolled fill (sand)            Very High                 1.5
           Services                          Fully sewered                   Moderate                  0.8
     Stormwater Disposal                   To council system                 Moderate                  0.7
          Connectors                           Not used                      Very High                 2.0
        Footing Types                    AS2870 fit for purpose                High                    1.2
        Founding Strata                    Transported Soils                   High                    1.2
        Inground Tanks                          Unknown                      Very High                 4.0
    Landscaping/Drainage                        Unknown                      Very High                 4.0
  Upslope Failure (if needed)                   No action                    Very High                 4.0
                    Site Frequency ( 𝟎. 𝟎𝟎𝟎𝟒 × ∑ 𝑰𝒕𝒆𝒎 𝑹𝒊𝒔𝒌 𝑭𝒂𝒄𝒕𝒐𝒓𝒔 )                                  0.33
                      Site Relative Susceptibility Risk to Instability                                Low


Table 3: Results of AGS Qualitative Risk Assessment
                Hazard                        Likelihood            Consequence              Risk Level
              Global Failure                 Barely Credible         Catastrophic                  Low
    Shallow slumping of surface soils           Unlikely                 Minor                     Low



4.0 Geotechnical Comments
Geotechnical comments are based on the factual findings of the investigation, best practice,
local experience, published correlations; however, are fundamentally founded in opinion and
this should be considered.

5.1 Earthworks Comments
The following comments are provided in relation to site preparation for earthworks.




29 Apr 2020                                                                Proposed Residnetial Dwelling

Page 7

                                                                                               37 636 783 527

                                                                                                  PO BOX 851
                                                                                      Moffat Beach, QLD, 4551
                                                                              [email protected]
                                                                                www.geotechengineering.com.au




•   The area should be stripped of uncontrolled fill, soft, overly wet, foreign, or otherwise
    deemed unsuitable material (material that is potentially compressible) down to a relatively
    stiff dry base ensuring no organics material is present.
•   Stripped areas must be inspected by the geotechnical testing authority (GTA) to ensure no
    soft spots or loose zones are present. This should be done with the use of a loaded body
    truck or 12 tonne roller as a minimum. Areas showing signs of movement under the action
    of the testing equipment should be either over excavated and replaced with select fill or
    conditioned onsite through tyning, blending or other suitable methods.
•   Although no standard exists for the moisture content of soils, it is recommended that the
    site soils be placed at or near optimum moisture content (OMC) for general earthworks
    operations. This increases efficiency during earthworks operations. A range of +/- 2% of
    OMC is recommend for general earthworks.
•   Where site soils are proposed for use as fill in other areas, won material will need to have
    a maximum particle size of 75 mm or be observed to break down under the energy of
    compactive equipment.
•   Fill materials should be placed in relatively horizontal layers with a maximum placement
    thickness of 200 mm. The materials should be compacted to a minimum dry density ratio
    of 95% relative to Standard compactive effort.
•   Highly plastic clays at this site will be very sensitive to the presence or lack of moisture and
    therefore care should be used to place the material within the range nominated and to a
    maximum dry density of 102% relative to Standard compactive effort. Where this does not
    happen, the material could readily swell, soften, or be subject to significant trafficability
    issues.
•   Fill material will be subject to potential settlement post placement. Well compacted fill
    placed in accordance with AS3798 and otherwise, good earthworks procedure should
    typically be subject to settlement in the order of 0.5% to 1.0% of the fill thickness over a
    log cycle of time.


5.2 Site Movement
The results of the investigation, previous experience, and published correlations were used to
estimate the maximum characteristic ground surface movement (ys) value in accordance with
AS 2870.


The results of the calculations indicate that at the time of the investigation, a ys value
approximately equal to less than <20 mm is considered suitable; however, the site must be
classified as Class P given the requirement for slope stability assessment.


It is important to understand that numerous things can affect and consequently increase or
decrease the ys value for a site.



29 Apr 2020                                                          Proposed Residnetial Dwelling

Page 8

                                                                                             37 636 783 527

                                                                                                PO BOX 851
                                                                                    Moffat Beach, QLD, 4551
                                                                            [email protected]
                                                                              www.geotechengineering.com.au




The following are items that may affect the site and as a result change the site classification to
a “Class P”.
•   Excessive moisture as a result of poor drainage, maintenance to drainage structures,
    excessive watering of gardens;
•   Placement or removal of vegetation that draws moisture from the soil surrounding the
    structure; and
•   Additional earthworks outside the limitations set out in AS2870.


Long term maintenance is typically required for sites for maintenance. Useful information is
attached which should be read and understood by both the builder and property owner.


5.3 Foundations
It is recommended that all high level footings have perimeter, column and load bearing
footings found a minimum 0.3 m into medium dense sands. Where footings found into at this
depth and into this material they can be sized and dimensioned for 150 kPa. All foundation
excavations should be inspected by a suitably experienced and qualified geotechnical engineer
prior to the placement of concrete to confirm ground conditions. Further to this, all footings
should found in similar strata to limit differential settlement.


5.4 Hillside Construction
The following precautionary works should be implemented in additional to other items
highlighted within this document. These points are considered to be typical good hillside
construction practice as explained in attached documentation:

•   Foundations for lightly loaded or non-liveable structures should be founded on or in
    medium dense sands; Heavy structures should be supported on either piles founded into
    medium dense sands or high level footings founding into the same material.
•   Where slopes are not supported by an engineer designed support system, natural slopes
    within or near building envelope or movement sensitive areas should be no steeper than
    3.5H:1V.
•   Building platform fill should be limited to a maximum height of 1 m. The filling should be
    step keyed into the natural slope and battered no steeper than 3H:1V unless an engineer
    designed retention system is in place.
•   Unsupported cuts steeper than 2.5H:1V will require engineer designed retention systems.
•   All stormwater and surface water is to be discharged by an approved stormwater drainage
    system. The use of subsurface drainage systems are not suitable unless greater than 50
    m downslope from the envelope at this site.




29 Apr 2020                                                         Proposed Residnetial Dwelling

Page 9

                                                                                            37 636 783 527

                                                                                               PO BOX 851
                                                                                   Moffat Beach, QLD, 4551
                                                                           [email protected]
                                                                             www.geotechengineering.com.au




•   Ongoing maintenance of the effluent wastewater area is also considered mandatory. The
    location of the application area should be located below the proposed building. Plumbing
    and services must also not be allowed to leak and regular maintenance and inspections
    should be undertaken.
•   Erosion protection of cut and fill batters will be required. Batters should incorporate crest
    and toe drainage. Batters should be vegetated appropriately to minimise erosion.
•   Careful construction practices should be undertaken to ensure undermining of adjoining
    property structures does not occur.




29 Apr 2020                                                        Proposed Residnetial Dwelling

Page 10

                                                                                                   37 636 783 527

                                                                                                      PO BOX 851
                                                                                          Moffat Beach, QLD, 4551
                                                                                  [email protected]
                                                                                    www.geotechengineering.com.au




6.0 Limitations
Geotech Engineering Pty Ltd (GE) has prepared this document for 38 Avocet Parade, Peregian Beach
for RG Strategic. The document is specific to this particular project and for the purposes as described
within the document. The document cannot be used for any other project on the same site or other
sites or relied upon by a third party. Any party relying upon this document beyond its exclusive use
and purpose as stated above, and without the express written consent of GE, does so entirely at its
own risk and without recourse to GE for any loss or damage. GE has necessarily relied upon
information provided by the client and/or their agents.

It is important to understand that ground conditions can be spatially variable over short distances as
a result of geological processes or human interference. These changes can occur after the time of
which field work was undertaken. Given this, the assumed subsurface conditions within this document
are only indicative of the conditions at the testing locations to the depths investigated at the time of
the fieldwork.

The advice given in this document is based upon the assumed subsurface conditions. The relevance
and accuracy of advice given is directly affected by variations in ground conditions across the site
between testing locations that has not been captured and time elapsed since investigation works.

This document must be kept in entirety, read in full and understood. Interpretations or conclusions
made by others unless supported by an expressed written statement, interpretation, outcome or
stated within this document cannot be the responsibility of GE.

This document or parts of it should not be used as part of a specification or design for a project without
prior review and agreement by GE.

__________________________________________________________________________________


We trust this information is satisfactory for your current needs. Should you have any questions, please
feel free to contact the signed authors.




29 Apr 2020                                                               Proposed Residnetial Dwelling

Page 11

                                      37 636 783 527

                                         PO BOX 851
                             Moffat Beach, QLD, 4551
                     [email protected]
                       www.geotechengineering.com.au




29 Apr 2020   Proposed Residnetial Dwelling

Page 12

                                      37 636 783 527

                                         PO BOX 851
                             Moffat Beach, QLD, 4551
                     [email protected]
                       www.geotechengineering.com.au




29 Apr 2020   Proposed Residnetial Dwelling

Page 13

                                      37 636 783 527

                                         PO BOX 851
                             Moffat Beach, QLD, 4551
                     [email protected]
                       www.geotechengineering.com.au




29 Apr 2020   Proposed Residnetial Dwelling

Page 14

                                      37 636 783 527

                                         PO BOX 851
                             Moffat Beach, QLD, 4551
                     [email protected]
                       www.geotechengineering.com.au




29 Apr 2020   Proposed Residnetial Dwelling

Page 15

                                      37 636 783 527

                                         PO BOX 851
                             Moffat Beach, QLD, 4551
                     [email protected]
                       www.geotechengineering.com.au




29 Apr 2020   Proposed Residnetial Dwelling

Page 16

                                      37 636 783 527

                                         PO BOX 851
                             Moffat Beach, QLD, 4551
                     [email protected]
                       www.geotechengineering.com.au




29 Apr 2020   Proposed Residnetial Dwelling

Page 17

                                      37 636 783 527

                                         PO BOX 851
                             Moffat Beach, QLD, 4551
                     [email protected]
                       www.geotechengineering.com.au




29 Apr 2020   Proposed Residnetial Dwelling

Page 18

                                      37 636 783 527

                                         PO BOX 851
                             Moffat Beach, QLD, 4551
                     [email protected]
                       www.geotechengineering.com.au




29 Apr 2020   Proposed Residnetial Dwelling

Page 19

                                      37 636 783 527

                                         PO BOX 851
                             Moffat Beach, QLD, 4551
                     [email protected]
                       www.geotechengineering.com.au




29 Apr 2020   Proposed Residnetial Dwelling

Page 20

                                      37 636 783 527

                                         PO BOX 851
                             Moffat Beach, QLD, 4551
                     [email protected]
                       www.geotechengineering.com.au




29 Apr 2020   Proposed Residnetial Dwelling

Page 21

                                      37 636 783 527

                                         PO BOX 851
                             Moffat Beach, QLD, 4551
                     [email protected]
                       www.geotechengineering.com.au




29 Apr 2020   Proposed Residnetial Dwelling

Page 22

                                      37 636 783 527

                                         PO BOX 851
                             Moffat Beach, QLD, 4551
                     [email protected]
                       www.geotechengineering.com.au




29 Apr 2020   Proposed Residnetial Dwelling

Page 23

                                      37 636 783 527

                                         PO BOX 851
                             Moffat Beach, QLD, 4551
                     [email protected]
                       www.geotechengineering.com.au




29 Apr 2020   Proposed Residnetial Dwelling

Page 24

                                      37 636 783 527

                                         PO BOX 851
                             Moffat Beach, QLD, 4551
                     [email protected]
                       www.geotechengineering.com.au




29 Apr 2020   Proposed Residnetial Dwelling

Page 25

                                      37 636 783 527

                                         PO BOX 851
                             Moffat Beach, QLD, 4551
                     [email protected]
                       www.geotechengineering.com.au




29 Apr 2020   Proposed Residnetial Dwelling

Page 26

                                                                                                        37 636 783 527

                                                                                                           PO BOX 851
                                                                                               Moffat Beach, QLD, 4551
                                                                                       [email protected]
                                                                                         www.geotechengineering.com.au




GEOTECH REPORT
                                                            Geotech Engineering Pty Ltd undertakes quality
These notes have been provided to clarify and               assurance checks in accordance with its’ quality
enhance the reader’s understanding of the terminology       system requirements; however, restrictions on the
used throughout the report, and also to identify where      project outside of Geotech Engineering Pty Ltd’s
limitations exist. All investigations are undertaken        control can result in unanticipated variations, changes
based on budgetary constraints which impart a level of      in policy or interpretation of said policies by the relevant
uncertainty as a result of limiting the amount of           authority, or the actions of contractors subject to
investigation undertaken.                                   commercial pressure.

Copyright                                                   Site Variations

This report remains the property of Geotech                 If site variations become evident at the time of
Engineering Pty Ltd at all times unless ownership is        construction or after the release of a report, Geotech
transferred in writing. It cannot be included in any        Engineering Pty Ltd requests immediately notification.
documentation without the express written permission        This notification is proposed in order to assist in
of Geotech Engineering Australia Pty                        remediation prior to any permanent structures or
                                                            design procedures are undertaken.
Subsurface Report Sheets (Bores etc)
                                                            Collaboration
The provided subsurface sheets are inherently an
interpretation undertaken by a suitably qualified and       Geotech Engineering Pty Ltd strongly recommends
experienced person; however, the reliability of the         open and collaborative communication about the use
provided information will rely on the method of             and inherent interpretation of Geotech Engineering Pty
investigation. It is prudent to state that these sheets     Ltd’s report. Please contact the author of the report to
only represent a very small percentage of the               arrange for an obligation free discussion regarding the
subsurface conditions across a particular project.          potential benefits of having geotechnical consultants.

It reasons that given the relatively small representation
of the subsurface conditions for a project, spacial
variability between testing locations must be taken into
consideration including the orientation of strata
intersections.

The presence or lack of groundwater is usually stated
on the subsurface sheets; however, it must be noted
that the measurements undertaken onsite are typically
very inaccurate and if the presence or lack of
groundwater will have any degree of affect on the
project, additional groundwater monitoring techniques
should be employed such as groundwater monitoring
wells.

Reporting

The report has been prepared and reviewed by suitably
qualified and experienced persons. The persons draw
on previous experience, local knowledge, published
literature, and otherwise standard engineering
approaches and principals. The context of which the
report has been prepared for must be considered and
if the context changes, due consideration should be
given to the possibility that the report is no longer
considered relevant and review by Geotech
Engineering Pty Ltd must be undertaken.

Page 27

                                                                                                                        37 636 783 527

                                                                                                                           PO BOX 851
                                                                                                               Moffat Beach, QLD, 4551
                                                                                                       [email protected]
                                                                                                         www.geotechengineering.com.au




Interpretation of the
Subsurface Sheets
                                                                It is important to note that the point load strength index
The terminology included on Geotech Engineering Pty
                                                                does not take into consideration the degree of fracturing of
Ltd’s has been evolved from AS1726:2016. Typically a
                                                                a rock mass which can both lower and increase the overall
soil’s strength, colour, plasticity, grain size, other
                                                                rock strength. The strength of rock is broken down as
inclusions, and moisture will be described. A rock’s
                                                                follows:
strength, weathering, colour, grain, and other inclusions
are typically described.
                                                                 Very Low Strength (VLS)              < 2 MPa (UCS)
                                                                 Low Strength (LS)                    2 to 6 MPa (UCS)
Soil                                                             Medium Strength (MS)                 6 to 20 MPa (UCS)
                                                                 High Strength (HS)                   20 to 60 MPa (UCS)
Soil is typically described by the components that make it       Very High Strength (VHS)             60 to 200 MPa (UCS)
up by percentage or whichever has a governing behaviour.         Extremely High Strength (EHS)        > 200 MPa (UCS)
The types and sizes reproduced from AS1726 are:
 Boulder                  >200 mm
 Cobble                   63 to 200 mm                           Very Low Strength (VLS)              < 0.1 Is(50)
 Gravel                   2.36 to 63 mm                          Low Strength (LS)                    0.1 to 0.3 Is(50)
 Sand                     0.075 to 2.36 mm                       Medium Strength (MS)                 0.30 to 1.0 Is(50)
 Silty                    0.002 to 0.075 mm                      High Strength (HS)                   1.0 to 3.0 Is(50)
 Clay                     < 0.002 mm                             Very High Strength (VHS)             3.0 to 10.0 Is(50)
                                                                 Extremely High Strength (EHS)        > 10.0 Is(50)
The strength of soil is usually assessed by suitably
experienced persons through the use of laboratory test          The Is(50) values are based on a correlation between the
results, published literature, field assessments or a           unconfined compressive strength (UCS) of 20. This value
combination of the above. The strength of soil is               varies significantly and site specific testing must take
characterised into either cohesive (clays and silts) or         precedence.
cohesionless (sands and gravels) as shown below:
                                                                Rock weathering is broken down as follows:
 Cohessive Soil          Strength Term
 Very Soft               < 12.5 kPa                              Extremely weathered       Behaves as soil but rock
 Soft                    12.5 to 25 kPa                          (EW)                      structure evident
 Firm                    25 to 50 kPa                            Highly weathered          Colour and strength of original
 Stiff                   50 to 100 kPa                           (HW)                      fresh rock is not recognisable.
 Very Stiff              100 to 200 kPa                                                    Decomposition of rock evident
 Hard                    > 200 kPa                               Moderately                Defects are heavily stained with
                                                                 weathered (MW)            rock mass showing signs of
 Cohesionless Soils      Strength Term (uncorrected Qc)                                    discolouration
 Very Loose              <2 MPa                                  Slightly weathered        Some staining but minimal to no
 Loose                   2 to 5 MPa                              (SW)                      change in strength
 Medium Dense            5 to 15 MPa                             Fresh stained             Minor staining evident
 Dense                   15 to 25 MPa                            (FS)
 Very Dense              > 25 MPa                                Fresh rock                No change
                                                                 (FR)
Rock
                                                                Rock fracturing is broken down as follows and can only be
Rock is typically described by the components that make         accurately described where undamaged continuous
it up by percentage or whichever has a governing                sampling has been undertaken:
behaviour. The strength of rock is typically the most
important component. Typically, the strength of rock is          Fragmented (Fg)             Defect spacings < 20 mm
based on laboratory testing, tactile assessment and other        Highly Fractured (HF)       Defect spacings 20 to 50 mm
observations as relevant. The industry standard method           Fractured (Fr)              Defect spacings 50 to 200 mm
for assessing the strength of rock in the field is to use the    Slightly Fractured (SF)     Defect spacings 200 to 1000 mm
point load strength index (AS4133.4.1).                          Unbroken (Ub)               Defect spacings > 1000 mm

Page 28

Foundation Maintenance
and Footing Performance:
A Homeowner’s Guide

cairo

SIF 18
replaces
Information
Sheet 10/91

Bulidings can and often do move. This movement can be up, down, lateral or rotational. The fundamental cause
of movement in Dulicings can usually be related to one or more problems in the foundation sow. & is important for
the homeowner to identify the soil type in order to ascertain the measures that should be put in place in order to

ensure that problems In the foundation soil can be prevented, thus protecting against Duliding movement.
This Building Technology File is Gesigned to Identify causes of soil-related buliding movement, and to suggest

methods of prevention of resultant cracking in buildings.

‘The rypes of sotls usually presepr under the topsall in land saned for
residential batidings can be split Into Two approximare groups —
granidar and clay, Quite often, foundation sof Is a milsvure of borh
types. The general problems assoclaned with sells having grarailar
contenr are usually caused by erosion Clay souks are qubject to
saturation and swedll/shrink problenes:

Classifications for a given area can generally be obralmed by
sppiicarion to the local authortry, bur these are sornetines unreliable
and if there ls dowhrt, a georechnlcal report should he commissioned.
As mos bulldings suffering movement problems are founded on chy
sol, there & 2n emphasis on classification of snlls according to the
aenount of swell and shrinkage they experience whh warlations of
wares content. The table below ts Table 2.1 from AS 2870, the
Residermiat Stab and Footing Code.

Settlement due to construction

Thore are two types of sertiement that occur as a resulr of

construction:

* Imediare settiement occurs when a bulding & first placed on tts
foundation soll, 25 a result of compaction af the soll under the
weight of the structure, The cohestve qualiry of clay sou mitigates
agatast this, bur granular (particularly sandy) sall ts suxscepribie.

© Consotidation setriement Is a fearure of clay satl and may rake
pilace becaise of the expulsion of motsture froen the soll or because
of the poll's lack of restetance to local compressive or shear stresses.
This will usually take plane during the firs few months after
construction, bat has been known to take macy years tn
exceptional cases.

These problems are the province of the bullder and should be raken

Erosion

AI sols are prone ta erosion, bur sandy sot) ts particularly suscepethie
to belng washed away. Even clay with a sand component of sty 10%
of more can suffers from erosion,

Saturation

‘This ts particularly a problem tn clay safls. Senurarion creates a bog
Dike suspension of the soll that causes ir to ioae virmually af] of ts
hearing capacity. To a lesser degren, sand 1s affected by saruration
Decente saturated sand may undergo a reduction in volume
particularly Imported sand fil for bedding and blinding layers.
However, this usually occurs as Immediate setriement and should
formally be the prowlnce of the tullder.

‘Seasonal swelling and shrinkage of soli

All clays react to the presence of water by sowty absorbing ir, making
the soil Increase In volune (see table below). The degree of Increase
varles considerably hetwnen different clays, 25 dees the degree af
decrease during the swhsequent drying out caused by fair weather
periods. Because of the low absorprion and expulsion rate, rhis
phenomenon will not wsually he norkceable unless there are
Prolonged rainy or dry periods, usually of weeks or months,
depending on the land and sol) charactertsrics.

‘The swelling of so8 creates an upward force on the foatings of the
building, and shrinkage creares subeidence that takes away the
support needed by the fooring to retain equilibrium.
Shear fathare
Tht phenomenon occurs when the foundation soll does not have
suffictenr strengrh to support the weight of the fooring, There are
Two major past-comstruction causes

* Significart load increase.
* Reduction of lateral support of rhe soll under the fporing due to

 

 

 

 

 

 

 

 

 

fon, BuBting Tecbactagy Fae I J 10) cosie vech =e . Guan eee Racin be caused by saturation of the soll
problems. adjacene to or under the toortng.
GENERAL DEFINITIONS OF SITE CLASSES
Chass Foundation
A Most sand and rock sites with little or na ground movement fram moisture changes
s Stightly reactive clay sites with only sight ground movement from moisture changes
M Moxtoratety reactive clay or stk sites, which can experience moderame ground movement from maisture changes
H Highly reactive clay sites, which can experience high ground movement from motsture changes
E Extremely reactive sites, which can experience extreme ground movement from matsture changes
AwP Filed sites
+ || Sete cee teeta eee eee eee owe

 

 

 

 

Page 29

Tree root growth
Trees and shrubs that are allowed te grow in the vicinity of footings
can cause foundation soil movement in two ways:

© Roots that prow under footings may increase in cross-sectional
size, exerting upward pressure on footings.

* Roots in the vicinity of footings will absorb mach of the moisture
in the foundation soil, causing shrinkage or subsidence.

Unevenness of Movement
The types of ground movernent described above usually occur
unevenly throughout the building's foundation soil. Settlement due
to construction tends to be uneven because of-
© Differing compaction of foundation soil prior to comstruction_
© Differing moisture content of foundation soil prior to
construction.
Movement due to non-constraction causes is usually more uneven
still Erosion can undermine a footing that traverses the flow or can
create the conditions for shear Gilure by eroding soil adjacent to 2
footing that rans in the same direction as the flow.
Saturation of clay foundation soil may occur where subfloor walls create
adam thar makes water pond. ft can also ocour wherever there isa
source af water near footings in clay soil. This leads to a severe
reduction in the strength of the soil which may create local shear failure.
Seasonal swelling and shrinkage of clay soil affects the perimeter af
the building first, then gradually spreads eo the interior. The swelling
process will usually begin at the uphill extreme of the building, or on
the weather side where the land is flat. Swelling gradually reaches the
interior soil as absorption continues. Shrinkage usually begins where
the sun's heat is greatest_

Effects of Uneven Soll Movement on Structures

Erosion and saturation
Erosion removes the support from under footings, tending to create
subsidence of the part of the structure under which it occurs.
Brickwork walls will resist the stress created by this removal of
support by bridging the pap or cantilevering until the bricks or the
mortar bedding fail. Older masonry has little resistance. Evidence of
failure varies according tw circumstances and symptoms may include
© Step cracking im the mortar beds in the body of the wall ar above!
below openings such as doors or windows.
© Vertical cracking in the bricks (usually but not necessarily in line
with the vertical beds or perpends).
Lsolated piers affected by erosion or saturation of foundations will
eventually lose contact with the bearers they support and may tilt or
fall ower. The floors that have los this support will become bouncy,
sometimes rattling omaments etc

Seasonal swelling/shrinkage in day

Swelling foundation soil due te rainy periods first lifts the most exposed
extremities of the footing system, then the remainder of the perimeter
footings while gradually permeating inside the building footprin w lift
internal footings. This swelling first tends to create a dish effect,
because the external footings are pushed higher than the internal ones.
The first noticeable symptom may be that the floor appears slightly
dished. This is often accompanied by some doors binding on the
floor or the door head, together with some cracking of cornice
mitres. In buildings with timber flooring supported by bearers and
joists, the floor can be bouncy. Externally there may be visible
dishing of the hip or ridge lines.

As the moisture absorption process completes its journey to the
innermost areas of the building, the internal footings will rise. If the
spread of moisture is roughly even, it may be that the symptoxns will
temporarily disappear, but it is more likely that swelling will be
uneven, creating a difference rather than a disappearance in
symptoms. In buildings with timber flooring supported by bearers
and joists, the isolated piers will rise more easily than the strip
footings or piers under walls, creating noticeable doming of Mooring.
As the weather pattern changes and the soil begins to dry out, the
external footings will be first affected, beginning with the locations
where the sun's effect is strongest. This has the effect af lowering the

 

external footings. The doming is accentuated and cracking reduces
or disappears where it ocaurred because of dishing, but other cracks
open up. The roof lines may become convex.

Daring and dishing az also affected by weather in other ways. In
areas where warm, wet summers and cooler dry winters prevail, water
migration tends to be toward the interior and doming will be
accentuated, whereas where summers are dry and winters are cold
and wet, migration tends to be toward the exterior and the
underlying propensity i toward dishing.

Movement caused by tree roots

In general, growing roots will exert an upward pressure on footings,
whereas soil subject to drying because of tree or sirub roots will rend
to remove support from under footings by inducing shrinkage.

Complications caused by the structure itself

Most forces that the soil causes to be exerted on structures are
vertical — i.e. either up or down. However, because these forces are
seldom spread evenly around the footings, and because the building
resists uneven movement because of its rigidity, forces are exerted
from one part of the building to another. The net result of all these
forces is usually rotational. This resultant force often complicates the
diagnosis because the visible sympeoms do not simply reflect the
original cause. A common symptom is binding of doors on the
vertical member of the frame.

Effects on full masonry structures

Brickwork will resist cracking where it can. Ir will atrempt mm span
areas that lose support because of subsided foundations or raised
points. It is therefore usual to see cracking at weak points, such as
openings for windows or doors.

In the event of construction settlement, cracking will usually remain
unchanged after the process of settlement has ceased.

With local shear or erosion, cracking will usually continue to develop
until che original cause has been remedied, or until the subsidence
has completely neutralised the affected portion of footing and the
structure has stabilised on ceher footings that remain effective.

In the case of swell/shrink effects, the brickwork will in some cases
return to its original position after completion of a cycle, however it
is more likely that the rotational effect will mvt be exactly reversed,
and it is also usual that brickwork will settle in its new position and
will resist the forces trying to return it w its original position. This
means that in a case where swelling takes place after construction
and cracking occurs, the cracking is likely to at least partly remain
after the shrink segment of the cycle is complete. Thus, each time the
cycle is repeated, the likelihood is chat the cracking will become
wider until the sections of brickwork became virtually independent.
With repeated cydes, once the cracking is eszablished, if there is no
other complication, it is normal for the incidence of cracking
stabilise, as the building has the articulation it needs to cope with the
problem. This is by no means always the case, however, and monigoring
of cracks in walls and floors should always be treated seriously.
Upheaval caused by growth of tree roots under foceings is not a
simple vertical shear stress. There is a tendency for the mot to also
exert lateral forces that attempt to separate sections of brickwork
after initial cracking has occurred.

Page 30

The normal structural arrangement is that the inner leaf of
brickwork in the external walls and at least some of the internal walls
(depending on the roof type) comprise the load-bearing structure on
which any upper floors, ceilings and the roof are supported. In these
cases, it is internally visible cracking thar should be the main focus of
attention, however there are a few examples of dwellings whose
external leaf of masonry plays some supporting role, so this should be
checked if there is any doubt. In amy case, externally visible cracking
is important as a puide to stresses on the structure penerally, and ie
should also be remembered that the external walls must be capable of
supporting themselves.

Effects on framed structures

Timber or steel framed buildings are less likely to exhibit cracking due
to swellishrink than masonry buildings because of their flexibility.
Also, the doming/dishing effects tend to be lower because of the
lighter weight of walls. The main risks to framed buildings are
encountered because of the isolated pier footings used under walls.
Where erosion or saturation causes a footing to fall away, this can
double the span which 2 wall must bridge. This additional stress can
create cracking in wall linings, particularly where there is 2 weak
point in the structure caused by a door or window opening. It is,
however, unlikely that framed structures will be so stressed as to suffer
serious damage without first exhibiting some ar all of the above
symptoms for a considerable period. The same warning period should
zpply in the case of upheaval. [t should be noted, however, that where
Framed buildings are supported by strip footings there is only ome leaf
of brickwork and therefore the externally visible walls are the
supporting structure for the building. In this case, the subfloor
masonry walls. can be expected to behave as full brickwork walls.

Effects on brick veneer structures

Because the load-bearing structure of a brick veneer building is the
frame that makes up the interior leaf of the external walls plus
perhaps the internal walls, depending on the type af roof, the
building can be expected to behave as a framed structure, except that
the external masonry will behave in a similar way ew the external leaf
of a full masonry structure.

Water Service and Drainage

Where a water service pipe, a sewer or stormwater drainage pipe is in
the vicinity of a building, a water leak can cause erosion, swelling or
saturation of susceptible soil. Even a minuscule leak can be enough to
saturate 2 clay foundation. A leaking tap near a building can have the
same effect. In addition, trenches containing pipes can become
watercourses even though backfilled, particularly where broken
rubble is used as Fill Water that runs along these trenches can be
responsible for serious erosion, interstrata seepage into subfloor areas
and saturation.

Pipe leakage and trench water flows also encourage tree and shrub
roots to the source of water, complicating and exacerbating the
problem. Poor roof plumbing can result in Large volumes of rainwater
being concentrated in a small area of soil:

© Incorrect falls in roof guttering may result in overflows, as may
gutters blocked with leaves ete

* Corroded guttering or downpipes can spill water to ground.

* Downpipes not positively connected to a proper stormwater
collection system will direct a concentration of water to soil thar is
directly adjacent to footings, sometimes causing large-scale
problems such as erosion, saturation and migration of water under
the building.

Seriousness of Cracking

In general, most cracking found in masonry walls & a cosmetic
nuisance only and can be kept in repair of even ignored. The table
below is 2 reproduction of Table C1 of AS 2870-2011.

AS 2870-2011 also publishes figures relating to cracking in concrete
floors, however because wall cracking will usually reach the critical
point significantly earlier than cracking in slabs, this table is not
reproduced here_

Prevention /Cure

Plumbing

Where building movernent is caused by water service, roof
plumbing, sewer or stormwater failure, the remedy is to repair the
problem. It is prudent, however, to consider also rerouting pipes
away from the building where possible, and relocating taps to
positions where any leakage will not direct water to the building
vicinity. Even where pully traps are present, there is sometimes
sufficient spill to create erosion or saturation, particularly in modern
installations using smaller diameter PVC fixtures. Indeed, some
gully traps are not situated directly under the taps that are installed
to charge them, with the resulr that water from the tap may enter
the backfilled trench that houses the sewer piping. If the trench has
been poorly backfilled, the water will either pond or flow along the
bottom of the trench. As these trenches usually ran alongside the
footings and can be at a similar depth, it is not hard to see how any
water that is thus directed into a crench can easily affect the
foundation's ability to support footings or even gain entry to the
subfloor area.

Ground drainage

In all soils there is the capacity for water to travel on the surface and
below it. Surface water flows can be established by inspection during
and after heavy or prolonged rain. If necessary, a grated drain system
connected to the stormwater callection system is usually an easy
solution.

{ce is, however, sometimes necessary when attempting to prevent water
migration that testing be carried out to establish watertable height
and subsoil water flows. This subject is referred to in BTF 19 and
may properly be regarded as an area for an expert consultant.

Protection of the building perimeter

[eis essential so remember that the soil that affects footings extends
well beyond the actual building line. Watering of garden plants,
shrubs and trees causes some of the mast serious water problems.
For this reason, particularly where problems exist or are likely to
occur, it is recommended that an apron of paving be installed around
as much of the building perimeter as necessary. This paving tiould

 

CLASSIFICATION OF DAMAGE WITH REFERENCE TO WALLS

 

 

 

 

 

 

 

Approximate crack width Damage

Description of typical damage and required repair limit (see Note 3) category
Hairline cracks <0.1 mm o
Fine cracks which do not need repair <l mm 1
(Cracks noticeable but easily filled. Doors and windows stick slightly. Simm 2
(Cracks can be repaired and possibly a small amount of wall will need to be 5-15 mm (or a number of cracks 3
replaced. Doors and windows stick. Service pipes can fracture. Weathertightness 3 mm or more in one group)
often impaired.
Extensive repair work involving breaking-out and replacing sections af walls, 15—25 mm bur also depends on 4
especially over doors and windows. Window and door frames distort. Walls lean number af cracks
or bulge noticeably, some loss of bearing in beams. Service pipes disrupted.

 

 

 

 

Page 31

 

exend ourwards a minimum of 900 mum (more in highly reactive
soil) and should have a minimum fall away from the building of
1:60. The finished poving should be no les than 100 mm below
brick vent bases.

Tis prudent ro relocate dminage pipes away from this paving, If
possible, to avold complications from future leakage If this is nor
practical, earthenware pipes should be rephiced by PVC and
backfilling should be of the same soil rype as the surrounding soil
and compacted to the ame density.

Except in areas where freezing of water is an Issue, it is wise to”
remove taps in the baikting area and relocate chem well away from
the building — preferably moe uphill from ir (see BTF 19).

Tc may he desirable to install a grated drain at the curside edge of the

paving on the uphill side of the building. Ifsubsall drainage is
needed rhis can be installed under the surface drain,

Condensation

In buildings with a subfloor void such as where bearers and joists
support flooring, insufficient ventilation creates ideal conditions for
condensation, particularly where there Is little clearance between the
floor and the ground. Condensation adds to the moisture already
present in the subfloorand significantly slows the process of drying

Warning: Although this Building Technology Pile deals with
cracking in buildings, it should be eid thar aubfloor moisture can

result in the development of other problems, notably:

© Wacerthar is tearumiteed into masonry, metal or timber building
elements causes damage and/or decay two those elements.

* High subfloor humidity and moisture content create an ideal,

* Where high moisture levels are transmitted co the flooring and
walls, an increase in the dust mite count can ensue within the
living areas. Dust mites, as well as dampness in general, can be a
health hazard two inhabitants, particularly those who are
abnormally aasceptible to respimrory ailments:

The garden

The ideal vegetation layour is to have lawn or plants thar require only
light watering immedianely adjacere to the drainage or paving edge,
then moce demanding planes, shrubs and trees spread our in thar order.

Overwarering due to misuse of avomaric watering symems iso
common canse of sarusarion and water migration under footings. If ic
is necematy to use these systems, it is important w mmove garden
beds to a completely safe distance from buildings.

Existing trees

Where a tree is canting a pooblem of soil drying or there is the
existence or threat of upbeaval of footings, if the offending mow are
subsidiary and their removal will not significantly damage the tree,
they should be severed and a conceete or metal harrier placed
vertically in the soil w prevent fucure coor growth in the direction of
the building, If it is not possible to remove the relevant mors without
damage tw the tree, an application ro remove the ree should be made
to the local authority, A prudent plan is wo transplan likely offenders
before they become a problem.

regarding root pacterns, volume of water needed and safe distance
from buildings of most species. Boranic gardens ace also sources of
information. For informarion on plant mow and drains, see Building
Technology Pile 17.

Excavation

Exravation around footings must be properly engineered. Soil
supporting foorings can only be safely excavared aran angle thar
allows the soil under the footing to remain stable. This angle is called
Deano ween fe Biren sat eclos between soil
ype and conditions Removal of sail within che angle of repose will
cause subsidence.

Where erosion has occurred that has washed away soil adjacent ro
footings, soll of the same classification should be ionroduced and
compacted to the same density, Where footings have been
undermined, augmentation or other specialist work may be required.
Remediation of footings and foundations is generally the realm of a
specialie consulrant.

Where isolated footings rise and fall because of swell/shrink effect,
the homeowner may be remperd to alleviate floor bounce by filling
the gap thar has appeared between the bearer and the pier with
blocking. The danger hese is thar when the next swell segment of the
cycle occurs, the ertra blocking will pash the floor up inno an
accentuated dome and may also cause local shear failure in the soil. If
I is necessary to use blodeing, Ic should be by a pairof fine wedges
and monitoring should be carried our fortnightly,

This BYF was prepared by John Lewer FAIB, MIAMA, Partner,
Construction Diagnosis.

‘The infermation in this and other Issues in the series was derived from various scuross and was beteved to be correct when pubished.

 

The Information ts advisory. it is provided In good falth and not clained io be an exhaustive treatment of the relevant subject.

 

 

Further proteasional odvice needs to be obtained before tahing any action based on the information provided.
‘Disiibuted by ‘
CSIRO PUBLISHING PO Bex 1139, Collingwood 3066, Australia

Tal (03) 9562 7666

Fax (03) 96627555

werw.publish.csiro.au

Email: [email protected]
© CSIRO 2098. Unauthorised copying of this Bullding Technology File ts prohibited

Page 32

AUSTRALIAN GEOGUIDE LR8 (CONSTRUCTION PRACTICE)

Sensible development practices are required when building on hillsides, particularly the hillside has more than a low
risk of instability (GeoGuide LR7). Only building techniques intended to maintain, or reduce. the overall level of landslide
risk should be considered. Examples of good hillside construction practice are illustrated below.

EXAMPLES OF GOOD HILLSIDE CONSTRUCTION PRACTICE

=a
Vegetation reamed =
Surface water interception drainage d a

 

   
 
  
  
  
 
   
   
 
   

Waleright adequately sted anc founded root water storage
tanks (with due regard for impact of polentcal leakage)

Fimoble structure
Root water piped of site or stored —

On-site delention tanks, waterlignt and adequately
foundes. Potential leakage managed by subsoil
drains - —

~ Piar footings into rock

Subsoll drainage may be

required in slope

Cutting and fling minimised in develooment

~ Sewage ¢ffuent pumped out or connected io sewer
Tanks adequataly foundad and watertght. Potential
leakage managed by sub-soll drains

~____ Engineered retaineig walls with both surface and
‘subsurface drainage (constructad before dwelling)

(p) Aa (pei)
See 280 AGS [TON Opperie 1

WHY ARE THESE PRACTICES GOOD?

Roadways and parking areas - are paved and incorporate kerbs which prevent water discharging straight into the
hillside (GeoGuide LR5).

Cuttings - are supported by retaining walls (GeoGuide LR6).

Retaining walls - are engimeer designed to withstand the lateral earth pressures and surcharges expected, and include
drains to prevent water pressures developing in the backfill. Where the ground slopes steeply down towards the high
side of 2 retaining wall, the disturbing force (see GeoGuide LRG) can be two or more times that in level ground.
Retaining walls must be designed taking these forces into account.

Sewage - whether treated or not is either taken away in pipes or contained in properly founded tanks so it cannot soak
into the ground.

Surface water - from roofs and other hard surfaces is piped away to a suitable discharge point rather than being allowed
to infiltrate into the ground. Preferably, the discharge point will be in a natural creek where ground water exits, rather
than enters, the ground. Shallow, lined, drains on the surface can fulfil the same purpose (GeoGuide LR5).

Surface loads - are minimised. No fill embankments have been built. The house is a lightweight structure Foundation
loads have been taken down below the level at which a landslide is likely to occur and, preferably, to rock. This sort of
construction is probably not applicable to sol slopes (GeoGuide LR3). If you are uncertain whether your site has rock
near the surface, or is essentially a sol slope, you should engage a geotechnical practitioner to find out.

Flexible structures - have been used because they can tolerate a certain amount of movement with minimal signs of
distress and maintain their functionality.

Vegetation clearance - on soil slopes has been kept to a reasonable minimum. Trees, and to a lesser extent smaller
vegetation, take large quantities of water out of the ground every day. This lowers the ground water table, which in tum
helps to maintain the stability of the slope. Large scale clearing can result in a rise in water table with a consequent
increase in the likelihood of a landslide (GeoGuide LR5). An exception may have to be made to this rule on steep rock
slopes where trees have little effect on the water table. but their roots pose a landslide hazard by dislodging boulders.
Possible effects of ignoring good construction practices are illustrated on page 2. Unfortunately, these poor construction
practices are not as unusual as you might think and are often chosen because, on the face of it, they will save the
developer, or owner, money. You should not lose sight of the fact that the cost and anguish associated with any one of
the disasters Hlustrated, is likely to more than wipe out any apparent savings at the outset.

ADOPT GOOD PRACTICE ON HILLSIDE SITES

74 Australian Geomechanics Vol 42 No 1 March 2007

Page 33

AUSTRALIAN GEOGUIDE LR8 (CONSTRUCTION PRACTICE)
EXAMPLES OF POOR HILLSIDE CONSTRUCTION PRACTICE

Unstabllised rock topples and Iravets downsiope
Vegelation removed
Steep unsupported out fils

Discharges of rootwater soak away ralher than
conducted offsite of to secure storage for re-use

Structure unable te tolerate ae
ecitement and cracks oo ™~
Poory compacted 4 setties «’ * A
unevenly and cracks pool tf

inadequate walling unable i
fo support fH Ir

inadequately

 
 
  
  
 
   
 
  
  
 
   

Lose. sabaatad fill slides avd

possitty News downslope
Ponded water enters stope and actvates landskde 1 vie yay
= ~Prestte travel ccrensiope which impacts other development dawnt! San wea ASE OPO Ascordm |

WHY ARE THESE PRACTICES POOR?

Roadways and parking areas - are unsurfaced and lack proper table drains (gutters) causing surface water to pond and
soak into the ground.

Cut and fill - has been used to balance earthworks quantites and level the site leaving unstable cut faces and added
large surface loads to the ground. Fadure to compact the fill properly has led to settlement, which will probably continue
for several years after completion. The house and poo! have been built on the fill and have settled with it and cracked.
Leakage from the cracked pool and the applied surface loads from the fill have combined to cause landslides.

Retaining walls - have been avoided, to minimise cost, and hand placed rock walls used instead. Without applying
engineering design principles, the walls have failed to provide the required support to the ground and have fated.
creating a very Situation.

A heavy, rigid. house - has been built on shallow, conventional, footings. Not only has the brickwork cracked because
of the resulting ground movements, but it has also become involved in a man-made landslide.

Soak-away drainage - has been used for sewage and surface water run-off from roofs and pavements. This water
soaks inte the ground and raises the water table (GeoGuide LR'5}. Subsoil drains that run along the contours should be
avoided for the same reason. If felt necessary. subsoil drains should run steeply downhill in a chevron, or herring bone.
pattem. This may conflict with the requirements for effuent and surface water disposal (GeoGuide LRQ) and if so, you
will need to seek professional advice.

Rock debris - from landslides higher up on the slope seems likely to pass through the site. Such locations are often
referred to by geotechnical practitioners as “debris flow paths”. Rock is normally even denser than ordinary fill, so even
quite modest boulders are likely to weigh many tonnes and do 3 lot of damage once they start to roll. Boulders have
been known to travel hundreds of metres downhill leaving behind a trail of destruction.
Vegetation - has been completely cleared. leading to a possible rise in the water table and increased landslide risk
(GeoGuide LR5).

DON'T CUT CORNERS ON HILLSIDE SITES - OBTAIN ADVICE FROM A GEOTECHNICAL PRACTITIONER

More information relevant to your particular situation may be found In other Australian GeoGuldes:

« GeoGuide LR1 - introduction « GeoGuide LR6 - Retaining Wals

* GecoGuide LR2 -Landsides « GeoGuide LR7 - Landslide Risk

« GeoGuide LR3 -Landsides In Soll « GeoGuile LRS -EfMivent & Surface Water Disposal
* GeoGuide LR4 -Landsides In Rock GeoGuite LR10 - Coastal Landslides

«  _GeoGuide LAS -Water & Drainage « GeoGuide LR11 - Record Keeping

 

The Australian GeoGuides (LR series) ae a set of publications Intended for property owners; local councils; planning autnodtes;
Gevelopers; insurers: (awyers and, in fact, anyone who lives with, or has an interest in, a natural of engineered stope, 3 cutting or an
excavaton. They ae intended to help you understand why slopes and retaining structures can be 3 Nazard and what can be done wtn
appropriate advice and local counc! approval (if required) to remove, reduce, of minimise ine risk they represent The
GeoGukles have been prepared oy the Ausirailan Geomechanics Society, a specialist technica society wifin Engineers Australia, the
ational peak body for ail engineering disciplines in Australia, wnose members are professiona geotechnica’ engineers and engineering
geologists with 3 particular interest n ground engineering. Tne GeoGuites nave Deen funded under tne Australian governments’
Nationa Disaster Misgation Program.

Australian Geomechanics Vol 42 No 1 March 2007 75

Page 34

AUSTRALIAN GEOGUIDE LR7 (LANDSLIDE RISK)

 

LANDSLIDE RISK

 

 

 

Concept of Risk

Risk is a familiar term, but what does it really mean? It
can be defined as “a measure of the probability and
severty of an adverse effect to health, property, or the
environment.” This definition may seem a _ bit
complicated. In relation to landslides, geotechnical
Practitioners (GeoGuide LR1) are required to assess
risk in terms of the likelihood that a particular landslide
will occur and the possible consequences. This is called
landslide msk assessment. The consequences of a
landslide are many and varied, but our concems
normally focus on loss of, or damage to. property and
loss of life.

Landslide Risk Assessment

Some local councils in Australia are aware of the
potential for landslides within their jurisdiction and have
responded by designating specific ‘landslide hazard
zones”. Development in these areas is often covered
by special regulations. If you are contemplating
building, or buying an existing house, particularly in a
hilly area, or near cliffs, go first for information to your
local council.

Landslide risk assessment must be undertaken by

a _geotechnical practitioner. It may involve visual
inspection, geological mapping, geotechnical

investigation and monitoring to identify:
* potential landslides (there may be more than
one that could impact on your site)
the likelihood that they will occur
the damage that could result
the cost of disruption and repairs and
the extent to which lives could be lost.

Risk assessment is a predictive exercise, but since the
ground and the processes involved are complex,
prediction tends to lack precision. If you commission a

landslide risk assessment for a particular site you
should expect to receive a report prepared in
accordance with current professional guidelines and in
a form that is acceptable to your local council, or
planning authority.

Risk to Property

Table 1 indicates the terms used to describe risk to
property. Each risk level depends on an assessment of
how likely a landslide is to occur and its consequences
in dollar terms. “Likelihood” is the chance of it
happening in any one year, as indicated in Table 2.
“Consequences” are related to the cost of repairs and
temporary loss of use if a landslide occurs. These two
factors are combined by the geotechnical practitioner to
determine the Qualitative Risk.

TABLE 2: LIKELIHOOD

   

Rare 1-100,000

The terms “unacceptable”. “may be tolerated”, etc. in
Table 1 indicate how most people react to an assessed
risk level. However, some people will always be more
prepared. or better able. to tolerate a higher risk level
than others.

Some local councils and planning authorities stipulate a
maximum tolerable level of risk to property for
developments within their jurisdictions. in these
Situations the risk must be assessed by a geotechnical
practitioner. |f stabilisation works are needed to meet
the stipulated requirements these will normally have to
be carried out as part of the development, or consent
will be withheld.

TABLE 1: RISK TO PROPERTY

 

Qualitative Risk | Significance - Geotechnical engineering requirements

 

Very high | VH | Unacceptable without treatment. Extensive detailed investigation and research, planning and
implementation of treatment options essential to reduce risk to Low. May be too expensive and not
practical. Work likely to cost more than the value of the property.

 

High H | Unacceptable without treatment. Detailed investigation, planning and implementation of treatment
options required to reduce risk to acceptable level. Work would cost a substantial sum in relation to

the value of the property.

 

May be tolerated in certain circumstances (subject to regulator's approval) but requires
investigation, planning and implementation of treatment options to reduce the nsk to Low.
Treatment options to reduce to Low risk should be implemented as soon as possible.

Moderate M

 

Usually acceptable to regulators. Where treatment has been needed to reduce the risk to this

Low | | Jevel, ongoing maintenance is required.

 

 

 

 

Very Low | VL | Acceptable. Manage by normal slope maintenance procedures.

 

172 Australian Geomechanics Vol 42 No 1 March 2007

 

Page 35

AUSTRALIAN GEOGUIDE LR7 (LANDSLIDE RISK)

Risk to Life

Most of us have some difficulty grappling with the
concept of risk and deciding whether, or not, we are
prepared to accept it. However, without doing any sort
of analysis, or commissioning a report from an “expert”,
we all take risks every day. One of them is the risk of
being killed in an accident. This is worth thinking about,
because it tells us a lot about ourselves and can help to
put an assessed risk into a meaningful context. By
identifying activities that we either are, or are not,
prepared to engage in we can get some indication of
the maximum level of risk that we are prepared to take.
This knowledge can help us to decide whether we really
are able to accept a particular nsk, or to tolerate a
particular likelihood of loss, or damage. to our property
(Table 2).

In Table 3, data from NSW for the years 1928 to 2002,
and other sources, is presented. A risk of 1 in 100.000
means that, in any one year, 1 person is killed for every
100,000 people undertaking that particular activity. The
NSW data assumes that the whole population
undertakes the activity. That is, we are all at risk of
being killed in a fire, or of choking on our food, but it is
reasonable to assume that only people who go deep
sea fishing run a nsk of being killed while doing it

It can be seen that the risks of dying as a result of
falling, using a motor vehicle. or engaging in water-
related activities (including bathing) are all greater than
1:100,000 and yet few people actively avoid situations
where these risks are present. Some people are averse
to flying and yet it represents a lower risk than choking
to death on food. Importantly, the data also indicate
that, even when the risk of dying as a consequence of a
particular event is very small, it could still happen to any
one of us any day. If this were not so, no one would
ever be struck by lightning.

Most local councils and planning authorities that
stipulate a tolerable msk to property also stipulate a
tolerable risk to life. The AGS Practice Note Guideline
recommends that 1:100,000 is tolerable in newly

developed areas, where works can be carned out as
part of the development to limit nsk. The tolerable level
is raised to 1:10,000 in established areas, where
specific landslide hazards may have existed for many
years. The distinction is deliberate and intended to
prevent the concept of landslide risk management, for
its own sake, becoming an unreasonable financial
burden on existing communities. Acceptable risk is
usually taken to be one tenth of the tolerable risk
(1:1,000,000 for new developments and 1:100,000 for
established areas) and efforts should be made to attain
these where it is practicable and financially realistic to
do so.

TABLE 3: RISK TO LIFE

 

 

 

 

 

 

 

 

 

 

 

Risk (deaths per Activity/Event Leading to
participant per Death
year) (NSW data unless noted)
1:1,000 Deep sea fishing (UK)
110.000 | Motor_cycing. horse riding
. ultra-light fiying (Canada)
1-23,000 Motor vehicle use
1-30,000 Fall
1:70,000 Drowning
1:180,000 Fire/burn
1:660,000 Choking on food
1:1,000,000 Scheduled airlines (Canada)
1-2,300,000 Train travel
1:32,000,000 Lightning strike

 

 

 

 

More information relevant to your particular situation may be found In other AUSTRALIAN GEOGUIDES:

GeoGuide LR1 - Introduction
GeoGuide LR2 -Landsides
GeoGuide LR3 - Landsiides In Soll
GeoGuide LR4 = - Landsiides In Rock
GeoGuide LRS - Water & Drainage

GeoGuide LR5 - Retaining Walls

GeoGuide LR8  - Hillside Construction

GeoGuide LR9 - Effluent & Surface Water Disposal
GeoGulde LR10 - Coastal Landslides

GeoGuide LR11 - Record Keeping

 

The Australian GeoGuides (LR series) are a set of publications Intended for property owners; local councils; planning authorities;
developers; Insurers; lawyers and, in fact, anyone who lives with, or has an Interest in, a natural or engineered slope, a cutting. or an
excavation. They are intended to help you understand why slopes and retaining structures can be a hazard and what can be done with
appropriate professional advice and local council approval (If required) to remove. reduce, or minimise the risk they represent. The
GeoGuides Nave been prepared by the Australian Geomechanics Society, a specialist technical society within Engineers Austraila, the
national peak body for all engineering disciplines in Australla, whose members are professional geotechnical engineers and engineering

with a particular interest In ground engineering. The GeoGuides have Deen funded under the Ausirallan governments”

geologists
National Disaster Mitigation Program.

Australian Geomechanics Vol 42 No 1 March 2007 173

Page 36

AUSTRALIAN GEOGUIDE LRG (RETAINING WALLS)

 

 

RETAINING WALLS

 

Retaining walls are used to support cuts and fills. Some are built in the open and back®ll is placed behind them (gravity
walls). Others are inserted into the ground (cast in situ or driven piles) and the ground is subsequently excavated on one
side. Retaining walls, like all man-made structures, have a finite life. Properly engineered walls should last 50 years, or
more, without needing significant repairs. However, not all walls fit this category. Some. particularly those built by
inexperienced tradesmen without engineering input, can deflect and even fad because they are unable to withstand the
eee ae eee eae eee ae Be eee ee ees cet een oe

time. Design of retaining walls more than 900mm high should be undertaken by a geotechnical practitioner or
structural ineer and normal ire local council ‘oval.

Retaining walls have to withstand the weight of the ground on the high side. any water pressure forces that develop, any
additional load (surcharge) on the ground surface and sometimes swelling pressures from expansive clays. These
forces are resisted by the wall itself and the ground on the low side. Engineers calculate the forces that the retained
ground, the water, and the surcharge impose on a wall (the disturbing force) as well a5 the maximum force that the wall
and ground on the low side can provide to resist them (the restoring force). The ratio of the restoring force to the
disturbing force is called the “factor of safety” (GeoGuide LR1). Permanent retaining walls designed in accordance with
accepted engineering standards will normaly have a factor of safety in the range 1.5 to 2.

Never ado surcharge to the high side of a wall (e.g. place fil, erect a structure, stockpile bulk materials, or park vehicles)
unless you know the wall has been designed with that purpose in mind.

Never more than lightly water plants on the high side of a retaining wall. es ee

Never excavate at the toe of a retaining wall.

Any of these actions will reduce the factor of safety of the wall and could
lead to failure. fin doubt about any aspect of an existing retaining wall, or
changes you would like to make near one, seek advice from a
geotechnical practitioner, or a structural engineer. This GeoGuide sets out
basic inspection requirements for retaining walls and identifies some
common signs that might mdicate all is not well. GeoGuide LR11
provides information about records that should be kept

GRAVITY WALLS

Gravity walls are so called because they rely on ther own weight (the
force of gravity) to hold the ground behind in place.

Formed concrete and reinforced blockwork wails (Figure 1) - should
be built so the backfill can drain. They should be inspected at least once
@ year. Look for signs of tilting, bulging. cracking, or a drop in ground
level on the high side. as any of these may indicate that the wall has j— tnekeod draivage layer
Started to fal. Look for rust staining, which may indicate that the steel tented a
reinforcement is deteriorating and the wall is losing structural strength
(concrete cancer”). Ensure that weep holes are clear and that water is St, $$ Fras dvadeing rater

 

 

able to drain at all times, as high water pressures behind the wall can lead Seana on Peaea

to sudden and catastrophic failure. a]

Concrete “crib” walls (Figure 2) - should be filled with clean gravel, or S aa
“plue metal with a nominated grading. Sometimes soil is used to reduce Ie
cost, but this is undesirable, from an engineering perspective. unless a

intemal drainage is incorporated in the wall's construction. Without “= erateedina nee
backfill drainage, a soil filled crib wall is likely to have a lower factor of Al
safety than is required. Crib walls should be inspected as for formed Figure 2 -Typical crib
concrete walls. In addition, you should check that material is not being lost

through the structure of the wall, which has large gaps through it [— Orinerage tiryier
|

Timber “crib” walls - should be checked as for concrete crib walls. in {
addition, check the condition of the timber. Once individual e@ements
show signs of rotting it is necessary to have the wall replaced. If you are
uncertain seek advice from a geotechnical practitioner, or a structural
engineer.

Masonry walls: natural stone, brick, or interlocking blocks (Figure 3) -
more than about 1m high, should be wider at the bottom than at the top
and include specific measures to permit drainage of the backfill. They
should be checked as for formed concrete walls. Natural stone walls
should be inspected for signs of deterioration of the individual blocks:
strength loss, comers becoming rounded, cracks appearing, or debris
from the blocks collecting at the foot of the wail.

   

{Cary saat are Baca
Li a6 for concrete wal

Figure 3 -Typical masonry wall

170 Australian Geomechanics Vol 42 No 1 March 2007

 

Page 37

AUSTRALIAN GEOGUIDE LR6 (RETAINING WALLS)

Old Masonry walls (Figure 4) - Many old masonry retaming walls have
not been built in accordance with modern design standards and often
have a low “factor of safety” (GeoGuide LR1). They may therefore be =~=—__ thickrees

close to failure and a minor change in thew condition, or loading, could =>,

initiate collapse. You need to take particular care with such structures \

and seek professional advice sooner rather than later. Although masonry

walls sometimes deflect significantly over long periods of time collapse. ie
when it occurs, is usually sudden and can be catastrophic. Familiarity
with a particular situation can instil a false sense of confidence.

Reinforced soil walls (Figure 5) - are made of compacted select fill in Sere

which layers of reinforcement are buried to form a “reinforced soil zone”. _
The reinforcement is all important, because it holds the soil “wail” "7 7
together. Reinforcement may be steel strip, or mesh, or a variety of SS 22

geosynthetic (‘plastic’) products. The facing panels are there to protect
the soil “wall” from erosion and give it a finished appearance.

Most reinforced soil walls are proprietary products. Construction should
be carried out strictly in accordance with the manufacturer's instructions.
inspection and maintenance should be the same as for formed concrete
and concrete block walls. If unusual materials such as timber, or used
tyres, are used as a facing it should be checked to see that @ is not rotting,
or penshing.

OTHER WALLS

Cantilevered and anchored walls (Figure 6) - rely on earth pressure on
the low side, rather than self-weight, to provided the restoring force and
an adequate factor of safety. These walls may comprise:

« a line of touching bored piers (contiguous bored pile wall) or

* sprayed concrete panels between bored piers (shotcrete wall) or

*  honzontal timber or concrete planks spanning between upright timber Figure 5 - Typical reinforced soil wall
or steel soldier piles or

« steel sheet piles.

Depending on the form of construction and ground conditions, walls in

excess of 3 m height normally require at least one row of permanent

 

= Ground anchor
—— (nee requared ter

ground anchors. J caminvered wal)
INSPECTION me

- . 4
Al walls should be inspected at least once a year, looking for tiltmg and >_< Retwinirg wall

other signs of deterioration. Concrete walls should be inspected for Ca

cracking and rust stains as for formed concrete gravity walls. Contiguous

bored pie walls can have gaps between the piles - look for loss of soil

from behind which can become a major difficulty if it is not corrected. :
Timber walls should be inspected for rot. as for timber crib walls. Steel

sheet piles should be inspected for signs of rusting. In addition, you = =
should make sure that ground anchors are maintained as described in = 7 .
GeoGuide LR4 under the heading "Rock bolts and rock anchors”. Pee. eres

One of the most important issues for walls is that their internal draimage systems are operational. Frequenty verity that
intemal drainage pipes and surface interception drains around the wall are not blocked nor have become inoperative.

More information relevant to your particutar situation may be found In other Australian GeoGuldes:

GeoGuide LR7 - Landslide Risk

GeoGuide LRA = - Hillside Construction
GeoGuide LR3 - Effluent & Surface Water Disposal
GeoGuide LR4 -Landsides In Rock GeoGuide LR10 - Coastal Landsiides

GeoGuide LRS - Water & Drainage GeoGuide LR11 - Record Keeping

The Austafan GeoGuides (LR series) are a set of publications Intended for property owners; local councis; planning authontes:
Gevelopers; Insurers; lawyers and, In fact, anyone who lives with, or has an interest in, a natural or engineered slope, a cutting, or an
excavaton. They are intended to help you understand why slopes and retaining stuctures can be a nazard and what can be done with
appropiate professiona! advice and local council approval (if required) to remove, reduce, or minimise the risk they represent. The
GeoGuides Nave been prepared by tne Austaian Geomechanics Society a specialist technical society within Engineers Austrata, the
natonal peak body for al engineering disciplines in Australia, whose members are professiona@ geotechnical engineers and engineering
geologists with 2 particular Interest in ground engineering. The GeoGuldes have been funded under the Australian govemments' National
Olsaster MMigation Program

GeoGuide LR1 - Introduction
GeoGuide LR2 -Landsides
GeoGuide LR3 - Landsides In Soll

 

Australian Geomechanics Vol 42 No 1 March 2007 73

Page 38

AUSTRALIAN GEOGUIDE LR5 (WATER & DRAINAGE)

One way or another, water usually plays a critical part in initiating a landslide (GeoGuide LR2). For this reason, tis a
key factor to be controlled on sites with more than a low landslide risk (GeoGuide LR7).

Groundwater and Groundwater Flow

The ground is permeable and water flows through it as illustrated in Figure 1. When rain falls on the ground, some of it
runs along the surface ("surface water run-off) and some soaks in, becoming groundwater. Groundwater seeps
downwards along any path it can find until t meets the water table: the local level below which the ground is saturated. If
itreaches the water table. groundwater either comes to 2 halt in what is effectively underground storage, or it continues
to flow downwards. often towards a spring where it can seep out and become surface water again. Above the water
table the ground is said to be “partially saturated”, because it contains both water and air. Suctions can develop in the
partially saturated zone which have the effect of holding the ground together and reducing the risk of a landslide.
Vegetation and trees in particular draw large quantities of water out of the ground on a daily basis from the partially
saturated zone. This lowers the water table and increases suctions, both of which reduce the likelihood of a landslide
occurring.
AO
nn % Waste water and effluent disposal
o “augment natural inflows

     

Vegetation extracts water
and lowers water tate

Figure 1 - Groundwater flow

Groundwater Flow and Landslides

The landslide risk in a hillside can be affected by increase in soak-away drainage or the construction of retaining walls
which inhibit groundwater fiow. The groundwater is fikely to rise after heavy rain, but it can also nse when human
interference upsets the delicate natural balance. Activities such as felling trees and earthworks can lead to:

a reduction in the beneficial suctions in the partially saturated zone above the water table.

increased static water pressures below the water table.

increased hydraulic pressures due to groundwater flow.

loss of strength, or softening. of clay rich strata,

loss of natural cementing in some strata,

transportation of soil particles.

Any of these effects. or a combination of them, can lead to landslides like those illustrated in GeoGuides LR2, LR3 and
LR¢.

Limiting the Effect of Water

Site clearance and construction must be carefully considered ¢ changes in groundwater conditions are to be limited.
GeoGuide LR8 considers good and poor development practices. Not surprisingly much of the advice relates to sensible
treatment of water and is not repeated here. Adoption of appropriate techniques should make it possible to either
maintain the current ground water table, or even cause jt to drop, by limiting inflow to the ground.

if drainage measures and surface protection are relied on to keep the risk of a landslide to a tolerable level, it is important
that they are inspected routinely and maintained (GeoGuide LR11).

The following techniques may be considered to limit the destabilising effects of rising groundwater due to development
and are flustrated in Figure 2.

168 Australian Geomechanics Vol 42 No 1 March 2007

Page 39

AUSTRALIAN GEOGUIDE LR5 (WATER & DRAINAGE)

 

Figure 2 - Techniques used to control groundwater flow

Surface water drains (dish drains, or table drains) - are often used to prevent scour and limit inflow to a slope. Other
than in rock, they are relatively ineffective unless they have an impermeable lining. You should clear them regularly, and
@s required, anc not less than once a year. ff you live in an area with seasonal rainfall, it is best to do this near the end
of the dry season. If you notice that soil or rock debris is falling from the slope above, determime the source and take
a@ppropnate action. This may mean you have to seek advice from a geotechnical practitioner.

Surface protection - is sometimes used in addition to surface water drainage to prevent scour and minimise water
inflow to a slope. You should inspect concrete, shotcrete or stone pitching for cracking and other signs of deterioration at
least once a year. Make sure that weepholes are free of obstructions and able to drain. If the protection is deteriorating.
you should seek advice from a geotechnical practitioner.

Sub-soil drains - are often constructed behind retaining walls and on hillsides to intercept groundwater. Their function is
to remove water from the ground through an appropriate outlet. {t is important that subsoil drains are designed to
complement other measures being used. They should be laid in a sand, or gravel, bed and protected with a graded
stone or geotextile filter to reduce the chance of clogging. Sub-sol drains should always be laid to a fall of at least 1
vertical on 100 horizontal. Ideally the high end should be brought to the surface, so it can be flushed with water from
time to time as part of routine maintenance procedures.

Deep, underground drains - are usually only used in extreme circumstances, where the landslide nsk is assessed as
not being tolerable and other stabilisation measures are considered to be impractical. They work by permanently
lowering the water table in a slope. They are not often used in domestic scale developments, but if you have any on your
site be aware that professional maintenance is essential. {f they are not maintained and stop working, the water table will
rise and a landslide may even occur during normal weather conditions. Both an increase or a reduction in the normal
flow from deep drains could indicate a problem if it appears to be unrelated to recent rainfall. If changes of this sort are
observed, you should have the draims and your site checked by a geotechnical practitioner.

Documentation - design drawings and specifications for geotechnical measures intended to minimise landslide nsk can
be of great assistance to a geotechnical specialist, or structural engineer, called in to inspect and report on them. Copies
of available documentation should be retained and passed to the new owner when the property is sold (GeoGuide
LR11). You should also request details of an appropnate maintenance program for drainage works from the designer
and keep that information with other relevant documentation and maintenance records.

More information relevant to your particular situation may De found In other Austrailan GeoGuides:

© GeoGuide LRi - Introduction GeoGuide LR7 - Landslide Risk

GeoGuide LR2 -Landsides GeoGuide LR& = - Hillside Construction

GeoGuide LR3 - Landsides in Soll GeoGuide LRS -EMuent 4 Surface Water Disposal
GeoGuide LR4 -Landsides In Rock GeoGuide LR10 - Coastal Landsiides

GeoGuide LR6 - Retaining Was * GeoGuide LR1I1 - Record Keeping

The Australian GeoGuides (LA serles) ae a set of publications intended for propeny owners, local councils, planning authorities,
Gevelopers: Insurers: lawyers and. im fact, anyone who live with, of has an interest in, a natural or engineered slope. a cutting. or an
excavaton. They are intended to help you understanc why slopes and retaining structures can be a hazard and what can be done with
appropriate professional advice and local council aporoval (f required) to remove. reduce, or minimise the ns& they represent. Tne
GeoGuides Nave deen prepared by the Australian Geomechanics Society a specialist technica society within Engineers Australia, tne
national peak body for all engineering aiscpiines in Australia, whos members are professiona’ geotechnical engineers and engneering
a wth 3 particular interest in ground engineering. The GeoGuides nave been funded under the Austraian govemments’
Nationa’ Disaster Miagation Program.

 

Australian Geomechanics Vol 42 No 1 March 2007 168

Page 40

AUSTRALIAN GEOGUIDE LR4 (LANDSLIDES IN ROCK)

Rocks have been formed by many different geological processes and may have been subjected to intense pressure,
large scale distortion, extreme temperature and chemical change. As a result there are many oifferent rock types and
their condition vanes enormously. Rock strength varies and is often significantly reduced by the presence of
discontinuities (GeoGuide LR1). You may think that rock lasts forever, but in reality it weathers under the combined
effects of water, wind, chemical change, temperature variation, plant growth and animal activity and erodes with time.
Rock is often the parent maternal that ends up forming soil slopes (GeoGuide LR3). Inevitably different rocks have
different physical and chemical characteristics and they weather and erode to form different types of soil.

Weathering can lead to landslides (GeoGuide LR2) on rock slopes. The type of landslide depends on the nature of rock,
the way @ has weathered and the presence or absence of discontinuities. It is hard to generalise. though normally a
specific combination of discontinuities and material types will be the determining factor and these are often underground
and out of sight. Typical examples are provided in the figures 1 to 4. A geotechnical practitioner can assess the
landslide nsk and propose appropriate maintenance measures. This often entails making geological observations over
an area significantly larger than the site and a review of available background information, including records of known
landslides and aerial photographs. Depending on the amount of information available, geotechnical investigation may or
may not be needed. Every site is different and every site has to be assessed individually.

It is impossible to icte when a landslide will occur on a rock s but failure is normally sudden and
the coi wences can be catastrophic.

 

 

ar !

      

Figure 3 - Block slide on wok layer SS Wolte failure along discontinuities

if the landslide risk is assessed as being anything other that Low, or Very Low, (GeoGuide LR7) @ may be possible to
carry out work aimed at reducing the level of risk.

The most common options are:

1) Trimming the slope to remove hazardous blocks of rock.

2) Bolting. or anchoring. to fix hazardous blocks in position and prevent movement.
3) Installation of catch fences and other rockfall protection measures to limit the impact of rockfalis.
4) Deep drainage designed to limit changes in the ground water table (GeoGuide LR5).

Although such measures can be effective, they need inspection and on-going maintenance (GeoGuide LR11) if they are
to be fective for periods equivalent to the life of a house. Design should be undertaken by a geotechnical
ctitioner and will normal! wire local council approval. !t should be appreciated that it may not be viable to
Carry out remedial works in all circumstances: for example where the landslide is on someone else's property. where the
cost is out of proportion to the value of the property, or where the risk inherent in carying out the work is actually greater
than the risk of leaving things as they are. In situations such as these, development may be considered inappropmate.

166 Australian Geomechanics Vol 42 No 1 March 2007

Page 41

AUSTRALIAN GEOGUIDE LR4 (LANDSLIDES IN ROCK)

ROCK SLOPE HAZARD REDUCTION MEASURES

Removal of loose blocks - may be effective but, depending on rock type, ongoing erosion can result in more blocks
becoming unstable within a matter of years. Routine inspection. every 5 or so years, may be required to detect this.

Rock bolts and rock anchors (Figure 5) - can be installed in the
ground to improve its strength and prevent individual blocks from
falling. Rock bolts are usually tightened using a torque wrench, whilst
rock anchors carry higher loads and require jacking. Both can be
designed to be “permanent” using stainless steel, or sheathing. to
inhibit corrosion, but the cost can be up to 10 times that of the
“temporary” alternative. You should inspect rock bolts and rock
anchors for signs of water seepage, rusting and deterioration around
the heads at least once every 5 years. If you notice any of these
warning signs, have them checked by a geotechnical practitioner. It
is recommended that you keep copies of design drawings and
maintenance records (GeoGuide LR11) for the anchors on your site
and pass them on to the new owner should you sell.

Rock fall netting, catch fences and catch pits (Figure 6) - are
designed to catch or control falling rocks and prevent them from
damaging nearby property. You should inspect them at least once
every 5 years, and after major falls, and arrange for fallen and
trapped rocks to be removed if they appear to be filling up. Check for
signs of corrosion and replace steel elements and fixings before they
lose significant strength.

 

Cut-off drains (Figure 7) - can be used to intercept surface water
run-off and reduce flows down the cliff face. Suitable drains are often
excavated into the rock, or constructed from mounds of concrete, or
stabilised soil, depending on conditions. Drains must be laid to a fall
of at least 1% so they drain adequately. Frequent inspection is
needed to ensure they are not blocked and continue to function as
intended.

Clear trees and large bushes (Figure 7) - from slopes since roots
can prize boulders from the face increasing the landslide hazard.

 

Figure 7

Natural cliffs and bluffs - often present the greatest hazard and yet are easily overlooked, because they have “been there forever".
They can exist dove 3 bulding, road. or Déach, presenting the risk of a rock falling onto whatever Is Delow. They aiso sometimes
Support bulidings with a fine view to the Moron. Cil's should be observed frequently to ensure that they are not deteriorating. You may
fing f convenient to use binoculars to jook for signs of exposed “fresh” rock on the face, where a recent fail has occurred, or to go to the
foot of the cit? from time to time to see If debris is collecting. A thorough inspection of 2 cliff face Is often a major task requiring the use
Of rope access methods and should only De undertaken by an appropriately q mera meagan if tension cracks are observed In the
ground ane top 3. tate melas acto, ence Mey cous aa miner fare If you have any concems at ail about the

 

More information relevant to your particular stuation may pe found in other Australian GeoGuiies:

GeoGuide LR1  - introduction GeoGuide LR? - Landslide Risk

GeoGuide LR2 -Landsides GeoGuide LRS - Hillside Construction

GeoGulde LR3 - Landslides In Soll GeoGuide LRS - EMuent 4 Surface Water Disposal

GeoGuide LRS  - Water & Drainage GeoGuide LR10 - Coastal Landsiides

« GeoGuide LR6 -Retamingwais GeoGuide LR11 - Record Keeping

The Austratan GeoGuides (LR series) are a set of pubéications intenoed for property owners; local councils; planning authorties;

developers; Insurers; lawyers and, In fact, anyone who Eves with, or has an Interest in, a natural or engmesred slope. a cufing, or an

excavation. They are intended to help you understand why slopes and retaining structures can be 2 nazard and what can be done with

appropriate professional advice and local council approval (If required) to remove, reduce, or minimise the ns& they represent. The

GeoGuides Nave Deen prepared by the Australian Geomechanics Society, 2 specialist technica society within Engineers Austrata, the

nabonal peak body for af engineering disciplines in Australia, whose members are professional gectechnical engineers and engineering
ts wih a particutar interest in ground engineering. The GeoGuides have deen tunded under the Australian govemments’

Nationa’ Disaster Miigation Program.

Australian Geomechanics Vol 42 No 1 March 2007 167

Page 42

AUSTRALIAN GEOGUIDE LR3 (LANDSLIDES IN SOIL)

Landslides occur on soil slopes and the consequences can include damage to property and loss of life. Soll slopes exist
in all parts of Australia and can even occur in places where rock outcrops can be seen on the surface. If you live on, or
below, a soil slope # is portant to understand why a landslide might occur and what you can do to reduce the risk it
presents.

it is always worth asking the question “why is this slope here?”, because the answer often leads to an understanding of
what might happen in the future. Slopes are usually formed by weathering (breakdown) and erosion (physical
movement) of the natural ground - the "parent material". Many factors are involved including rain, wind, chemical
change, temperature vanation, plant growth, animal activity and our own human enthusiasm for development The
general process ss outlined in Figure 1

The upper levels of the parent material progressively weather over thousands, or millions, of years, losing strength. This
can result in a surface layer which looks similar to the parent material (although its colour has probably changed) but has
the strength of a soil - this is called “residual soil”. At some stage the weathered surface layer is exposed to the
elements and fragments are transported down the slope. In this context 3 fragment could be a single sand grain, a
boulder, or a landslide. The time scale could be anything from a few seconds to many thousands of years. The
transported fragments often collect on the lower slopes and form a mew soil layer that blankets the original slope -
“cofuvum”. If material reaches a nver or the sea it is deposited as “alluvium” or as a “marine deposit”. With appropriate
changes iin nver and sea level this material can again find itself on the surface to commence another cycle of weathering
and erosion. In places often, but not only, near the coast. this can include sand sized fragments which form beaches and
are sometimes blown back onto the land to form dunes.

a wy
? = =

Weathered parent material
(residual sail)

 
 
 
 

Fragments of parent material

  
   

 

Landslides can occur almost anywhere on a sol slope. Slides can be rotational, translational, or debris flows (see
GeoGuide LR2) and may have a number of causes.

- ay
or
Landslide from parent material

or residual soil further uphill

 

 
 
 

be due to tree Gearance, installing .
soakaway drains, or & period of heavy rain

Figure 2

164 Australian Geomechanics Vol 42 No f March 2007

Page 43

AUSTRALIAN GEOGUIDE LR3 (LANDSLIDES IN SOIL)

Landslide due to poorly supported excavation,
excassive fill depth, steep excavated

 

Figure 3
Some of the more common causes of landslides in soil are:
1) Falls of the parent material or residual sol from above, due to natural weathering processes (Figure 2).

2) Increased moisture content and consequent softening of the soil, or a rise in the water table. These can be due
to excessive tree clearance, ill-considered soak-away drainage or septic systems, or heavy rainfall (Figure 2).

3) Excavation without adequate support, increased surface load from fill placement, or inadequately designed
shallow foundations (Figure 3).

4) Natural erosion at the toe of the slope due to scour by a river or the sea (Figure 3).

5) Reactivation of an ancient landslide (Figure 3).

Most soil slopes appear stable, but they af achieved their present shape through 3 process of weathering and erosion

and are often sensitive to minor changes in the factors that affect their stability. As a general rule, human activities only

improve the situation if they have been designed to do so. Once this idea is understood, @ is probably easy to see why

the following basic mules are so important anc should not be ignored without seeking site specific advice from a

geotechnical practiboner:

. Do not clear trees unnecessarily.

. Do not cut into a slope without supporting the excavated face with an engineer designed structure.

. Do not ade weight to a slope by placing earth fil or constructing buildings with madequately designed shallow
foundations (Note: in certain circumstances weight is added to the toe of 3 slope to inhibit landslide movement.
but this must be carried out in accordance with a proper engineering design).

- Deo not allow water from storm water drains, or Tom septic waste or effluent disposal systems to soak into the
ground where it could trigger a landside.

More information in relation to good and poor hillside constructon practice is given in GeoGuiee LR8. With appropriate

engineering input it is often possible to reduce the likelihood. or consequences, of a landslide and so reduce the risk to

Property and to life. Such measures can include the construction of properly designed storm water and sub-sol drains,

surface protection (GeoGuide LR5) and retaining walls (GeoGuide LR6). Design should be undertaken by a
nical itioner and will normal ire local council wal

More information relevant to your particular situation may be found In other Austrailan GeoGuides:

GeoGuide LR1 - Introduction
GeoGuide LR2 - Landsides
GeoGuide LR4 - Landslides In Rock
GeoGuide LRS - Water & Drainage
GeoGuide LR - Retaining Walls

GeoGuile LR7 - Landslide Risk

GeoGuie LRS = - Hillside Construction

GeoGuide LRS - Effiuent & Surface Water Disposal
GeoGuide LR10 - Coastal Landsiides.

GeoGuide LR11 - Record Keeping

 

The Ausvallan GeoGuides (LR series) we a set of publications intended for propeny owners; loca? councils, planning authorities;
Developers; insurers; lawyers and. in fact, anyone whe llvee with, or has an interest in, a natural or engmeeres slope, a cutting of an
excavation. They are intended to ne!p you understand why slopes and retaining structures can be a hazard and what can be cone with
aporoprate professional advice and Iocal counc? aporoval (fF required) fo remove, reduce, or minimise the ne& they represent. Tne
GeoGuiles have deen prepared by ine Australian Geomechanics Society. a speciatsi tecnnkca’ society within Engineers Ausiralla, the
natonal peak body for all engineering @scpiines in Australia, whose members are professiona’ gectecnnica engmeers and engineering
geologisis with 3 particular interest in ground engineering. The GeoGuides have been funded under the Australian governments’
Natona Disaster Mitigation Program.

Australian Geomechanics Vol 42 No 1 March 2007 165

Page 44

AUSTRALIAN GEOGUIDE LR2 (LANDSLIDES)

What is a Landslide?

Any movement of a mass of rock, debris, or earth, down a slope, constitutes a “landslide”. Landslides take many forms.
some of which are @ustrated. More information can be obtained from Geoscience Australia, or by visiting its Australian
Landslide Database at www 93 gov au/urban/factsheets/landslide jsp Aspects of the impact of landslides on buildings
are dealt with in the book “Guideline Document Landslide Hazards” published by the Australian Building Codes Board
and referenced in the Building Code of Australia. This document can be purchased over the internet at the Australian
Building Codes Board's website www_abcb.gov.au -

Landslides vary in size. They can be small and localised or very large. sometimes extending for kilometres and involving
millions of tonnes of soil or rock. It is important to realise that even a 1 cubic metre boulder of soll, or rock, weighs at
least 2 tonnes. If it falls, or slides, it is large enough to kill a person, crush a car, or cause serious structural damage to a
house. The maternal in a landslide may travel downhill well beyond the point where the failure first occurred, leaving
destruction in its wake. It may also leave an unstable slope in the ground behind @. which has the potential to fall again,
causing the landslide to extend (regress) uphill, or expand sideways. For all these reasons, both “potential” and “actual”
landslides must be taken very seriously. They present a real threat to life and property and require proper management.

identification of landslide risk is a complex task and must be undertaken by a geotechnical practitioner (GeoGuide LR 1)
with specialist experience in slope stability assessment and slope stabilisation.

What Causes a Landslide?

Landslides occur as a result of local geological and groundwater conditions, but can be exacerbated by inappropriate
development (GeoGuide LR8), exceptional weather, earthquakes and other factors. Some slopes and cliffs never seem
to change, but are actually on the verge of failing. Others, often moderate slopes (Table 1), move continuously, but so
slowly that it is not apparent to a casual observer. In both cases, small changes in conditions can trigger a landslide with
serious consequences. Wetting up of the ground (which may involve a rise in ground water table) is the single most
important cause of landslides (GeoGuide LR5). This is why they often occur during. or soon after, heavy rain.
inappropriate development often results in small scale landslides which are very expensive in human terms because of
the proximity of housing and people.

Does a Landslide Affect You?

Any slope, ciiff, cutting, or fill embankment may be a hazard which has the potential to impact on people, property. roads
and services. Some tell-tale signs that might indicate that a landslide is occurring are listed below:

trees leaning down slope, or with exposed roots
debris/fallen rocks at the foot of a cliff

open cracks, or steps, along contours
ground water seepage, or springs
bulging in the lower part of the slope tilted power poles, or fences
hummocky ground cracked or distorted structures

These indications of instability may be seen on almost any slope and are not necessarily confined to the steeper ones
(Table 1). Advice should be sought from a geotechnical practitioner if any of them are observed. Landslides do not
respect property boundaries. As mentioned above they can “run-out” from above, “regress” from below, or expand
sideways, so 3 landslide hazard affecting your property may actually exist on someone else's land.

Local councils are usually aware of slope instability problems within their jurisdiction and often have specific development

eee
eee

and maintenance requirements. Your local council is the first place to make enquiries if you are responsible for
any sort of it or own or oc: on or near sloping land or a cliff.

TABLE 1 - Slope Descriptions

 

 

 

 

 

 

 

 

Appearance a ‘enum Slope Characteristics
Gentle O° - 10° 1on6 Easy walking.
Moderate 10°- 18° 1on3 Walkable. Can drive and manoeuvre a car on driveway
Walkable with effort. Possible to dnve straight up or down
Steep 18°- 27° 1on2 roughened concrete driveway, but cannot practically manoeuvre a
car.
Very Steep 27°- 45° toni Can only climb slope by clutching at vegetation, rocks etc.
Extreme 45°- 64° 10n 0.5 Need rope access to climb slope
Cliff 64°- 84° 10n 0.1 Appears vertical. Can absed down.
Vertical or Overhang | 84° - 902° infinite Appears to overhang. Abseller likely to lose contact with the face.

 

 

 

 

 

 

Some typical landslides which could affect residential housing are Hlustrated below:

162 Australian Geomechanics Vol 42 No 1 March 2007

Page 45

AUSTRALIAN GEOGUIDE LR2 (LANDSLIDES)

Rotational or circular slip failures (Figure 1) - can occur on Small scale
moderate to very steep soil and weathered rock slopes (Table fandsiide:
1). The sliding surface of the mowing mass tends to be deep
seated. Tension cracks may open at the top of the slope and
bulging may occur at the toe. The ground may move in
discrete "steps" separated by long periods without movement.
More rapid movement may occur after heavy rain.

Translational slip failures (Figure 2) - tenc to occur on
moderate to very steep slopes (Table 1) where sod, or weak
rock, overlies stronger strata. The sliding mass is often
relatively shallow. It can move, or deform slowly (creep) over
long periods of time. Extensive linear cracks and hummocks
sometimes form along the contours. The siding mass may
accelerate after heavy rain.

Wedge failures (Figure 3) - normally only occur on extreme
slopes. or cliffs (Table 1). where discontinuities in the rock are
inclined steeply downwards out of the face.

Rock falls (Figure 3) - tend to occur from cliffs and
overhangs (Table 1).

Clifis may remain apparently unchanged for hundreds of
years. Collections of boulders at the foot of a cliff may
indicate that rock falls are ongoing. Wedge fadures and rock
falls do not “creep”. Familiarity with a particular local situation
can instil a false sense of security since failure, when @
occurs, is usually sudden and catastrophic.

 

Debris flows and mud slides (Figure 4} - may occur in the
foothills of ranges. where erosion has formed valleys which
slope down to the plains below. The valley bottoms are often
lined with loose eroded material (debris) which can “flow” if it
becomes saturated during and after heavy rain. Debris fows
are likely to occur with little warning: they travel a long way
and often involve large volumes of soll. The consequences
can be devastating.

 

Figure 4
More information relevant to your particular sttuation may be found In other Austrailan GeoGuldes:

GeoGuide LR1 - Introduction
GeoGuide LR3  - Soll Slopes
GeoGuide LR4 - Rock Slopes

GeoGuie LR? - Landslide Risk

GeoGuile LRS - Hillside Construction

GeoGuiie LAS - EfMfivent & Surface Water Disposal
GeoGuide LRS - Water & Drainage GeoGuie LR10 - Coastal Landslides

GeoGuide LR6 - Retahing Walls GeoGuile LR11 - Record Keeping

The Australian GeoGuides (LR series) we a set of pubications Intended for propery owners; loca’ councils: planréng authorities;
Gevelopers; Insuress; lawyers and. in fact, anyone who fives with, or has an interest in, a Natura! or engineered slope. a cutting. or an
excavation. They are intended to help you understand why slopes and retaining structures can be a hazaré and what can be done with
appropriate professional advice and local counc!) approval (9 required) to remove, reduce, or minimise the ns& they represemt. The
GeoGuides Nave Deen prepared by the Australian Geomechanics Society, a speciaiist technica society within Engineers Austrata, the
national peak body for ali engineering Gecpiines in Australla, whose members are professiona geotectiinica’ engineers and engineering
gedlogisis with a particular interest in ground engineering. The GeoGuides have been funded under the Australian govemments’
Nationa! Disaster Mitgation Program.

 

Australian Geomechanics Vol 42 No 1 March 2007 163

Page 46

Prctogupnacatmey of Geg Kote aid Tow Pilie

AUSTRALIAN GEOGUIDE LR1 (INTRODUCTION)

 

lINTRODUCTION TO LANDSLIDE RISK

 

 

 

AUSTRALIAN GEOGUIDES

The Australian GeoGuides (LR series) are a set of information sheets on the subject of landslide nsk management and
maintenance, published by the Australian Geomechanics Society (AGS). They provide background information intended to
help people without specialist technical knowledge understand the basic issues involved. Topics covered include:

LR1 - Introduction LR2 - Landslides LR3 - Landslides in Soil

LR4 - Landslides in Rock LR5 - Water & Drainage LR6 - Retaining Walls

LR7 - Landslide Risk LR& - Hillside Construction LR® - Effiuent & Surface Water Disposal
LR10 - Coastal Landslides LR11 - Record Keeping

The GeoGuides explain why slopes and retaining structures can be a hazard and what can be done with appropnate
professional advice and local authority approval (if required) to remove. or reduce, the nsk they represent.

Preparation of the GeoGuides has been funded by Australian governments through the National Disaster Mitigation Program
(NDMP). This is a national program aimed at identifying and addressing natural disaster risk priorities across Australia.
Technical input has been provided by experienced geotechnical engineers, engineering geologists and local government and
goverment agency representatives from around Australia.

BACKGROUND

A number of landslides and cliff collapses occurred in Ausiralia in the 1980's and 1990's in which fives were lost. Of these the
Thredbo landslide probably received the most publicity, but there were several others. During this period the AGS issued a
number of advisory notes to practitioners in relation te the assessment of landstide risk and its reduction. Building on these
Notes, and responding to changes in technology. a technical paper known as AGS2000 was prepared. It was followed in 2002
by an intensive nation-wide educational campaign attended by a lange number of interested professionals from government
departments and prvate industry. This resulted in an increased awareness of the risks associated with unstable slopes and 3
changed approach im many government departments responsible for regional planning, domestic development, roads, ralways
and the maintenance of natural features such as cliffs.

STATUS OF THE GEOQGUIDES

The GeoGuides reflect the essence of good practice as perceived by a large number of geotechnical engineers, engineering
ee ee other practitioners such as local government a The sacGites are generic and do not, and a eanecs.
b st be it

 

hand — of the site. {ft is expected that some local councils will Sinan ete ee
publications in planning and building legislation. Check with your local council to see how it regards these documents.
Companion publications to the GeoGuides are:

»* AGS (2007a) Guideline for Landslide Susceptibility, Hazard and Risk Zoning for Land Use Management Australian
Geomechanics Society, Australian Geomechanics, Vol 42, Not and its associated commentary (AGS 2007b).

* AGS (2007c). Practice Note Guidelines for Landslide Risk Management. Australian Geomechanics Society
Australian Geomechanics, Vol 42, No1 2007. and its associated "Commentary" (AGS 2007¢).

Copies of the above documents are available on the AGS website wew.australiangeomechanics org

160 Australian Geomechanics Vol 42 No 1 March 2007

Page 47

PReb gen conway of Pl Pete

TERMINOLOGY

AUSTRALIAN GEOGUIDE LR1 (INTRODUCTION)

Terminology tends to change with time and place and with the context in which it is used. The terms listed below have
the following meanings in the GeoGuides:

 

 

 

Consequence the outcome, or potential outcome. arising from the occurrence of a landslide expressed quantitatively, or
qualitatively, In terms of loss, disadvantage, damage. injury, of 105s of life.

Discontinuny in relation to the ground is a crack, 2 bedding plane {a DoUndary Delween siraa) of taunt (a plane along
which the ground has smeared) which forms a plane of weakness and reduces the overall strength of the
ground.

Equiiprium the condition when the forces on a mass of soll or rock in the ground, or on a retaining structure, are equat

and opposite.

 

Factor of safety (FOS)

theoreticaly Me forces avalable to prevent a part of Me ground, of a reaming structure, trom moving
divided by those trying to move It A FOS of one or less Indicates that failure Is likely to occur, but not how
likely It i. To allow for unknowns and to limit movements engineers always am to achieve a FOS
significantly larger than one.

 

Failure

 

when part of the ground experiences movement a5 2 result of the out of balance forces on It Fafure of a
retaining structure means It is no longer adie to full fs intended function.

 

Genechnical practivoner

when referred to In the Australian GeoGuides (LR series), Is a professional geciecnnka engineer, or
engineering geotogist, with chartered status in a ed national professional Institution and relevant
training, experience and core competencies im landslide risk assessment and management In some
government departments, technical officers are specticaily trained to undertake some of the functions of a
geotechnical practitioner.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Hazard 3 condition wih the potentiat for causing an undesirable consequence. in relation to landslices ths
includes the location, size, speed, distance of travel and the Mkellhood of fs occurrence within a given
period of time.

Landside the movement or the potential movement, of a mass of rock, debris. or earth down a siope.

Likeinood a guaitiative Description of prooapill ty. or trequenc’ ry, Of Occurrence.

Partial saturation the condRion In the ground above the water table where ooth alr and water are present as well as soll, or
Tock.

Perched water tare 3 wale table above ihe irue waler table suppomed by 3 low permeability stratum.

Permeabulty a measure of the abliky of ihe ground to alow water to flow through It

Risk a measure of the probability and severity of an adverse effect to life. health, propery or ihe environment

Sip faliure landslide.

Staole the condition when fafure wil not occur. Over geotogical time no pan of the ground can be considered
stable. Over short periods (eq the Ife of a structure} stabilty Imples a very low fitellhoos of tabure.

Retaning siucture anything bulit by humans which is Mtended fo suppor the ground and inhibit tabure

Structure in relation to rock, of Sol, means the spacing, extent, orlentaton and type o discontinuites found In ihe
ground 3t 3 particutar location.

Tension crack ‘a distinct open crack that normally Gevelops in the ground around a landside and indicaies actual, or
imminert , failure.

Water table the level in he Ground below which Ais saturated and ine volds are filed with water.

 

 

 

 

Australian Geomechanics Vol 42 No 1 March 2007

161

Page 48

PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007
APPENDIX C: LANDSLIDE RISK ASSESSMENT
QUALITATIVE TERMINOLOGY FOR USE IN ASSESSING RISK TO PROPERTY

QUALITATIVE MEASURES OF LIKELIHOOD

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Approximate Annual Probability Implied Indicative Landslide ae em jad
Indicative Notional Recurrence Interval hina ais ae S
Value Boundary
107 5x102 10 years The event is expected to occur over the design life. ALMOST CERTAIN A
107 100 years 20 years The event will probably occur under adverse conditions over the LIKELY B
3 - 4 design life.
107 azig 4 1000 years aa er: The event could occur under adverse conditions over the design life. | POSSIBLE Cc
107 3x10 10,000 years i The event might occur under very adverse circumstances over the UNLIKELY D
Noe design life.
5
10° Sxl 100,000 years 2G years The event is conceivable but only under exceptional circumstances RARE =
6 : over the design life.
10° ae 1,000,000 years | 200,000 ears [Tie event is inconceivable or fanciful over the design Life. BARELY CREDIBLE F

 

 

 

 

 

Note: (1) The table should be used from left to right; use Approximate Annual Probability or Description to assign Descriptor. not vice versa.

QUALITATIVE MEASURES OF CONSEQUENCES TO PROPERTY

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Approximate Cost of Damage
Indicative Notional Description Descriptor Level
Value Boundary
- Structure(s) completely destroyed and/or large scale damage requiring major engineering works for
200° & iS iS
20% 100% stabilisation. Could cause at least one adjacent property major consequence damage. CAUSES !
60% 3 Extensive damage to most of structure, and/or extending beyond site boundaries requiring significant MAJOR >
40° stabilisation works. Could cause at least one adjacent property medium consequence damage. ~
20% 7 Moderate damage to some of structure, and/or significant part of site requiring large stabilisation works. MEDIUM 3
ease 10% Could cause at least one adjacent property minor consequence damage. = = =
5% 1% Limited damage to part of structure. and/or part of site requiring some reinstatement stabilisation works. MINOR 4
‘ Little damage. (Note for high probability event (Almost Certain). this category may be subdivided at a
0; = 4 AN T
ca notional boundary of 0.1%. See Risk Matrix.) INSEE ‘

 

 

Notes: (2) The Approximate Cost of Damage is expressed as a percentage of market value, being the cost of the improved value of the unaffected property which includes the land plus the
unaffected structures.

GB) The Approximate Cost is to be an estimate of the direct cost of the damage, such as the cost of restatement of the damaged portion of the property (land plus structures), stabilisation
works required to render the site to tolerable risk level for the landslide which has occurred and professional design fees, and consequential costs such as legal fees. temporary
accommodation. It does not include additional stabilisation works to address other landslides which may affect the property.

(4) The table should be used from left to right; use Approximate Cost of Damage or Description to assign Descriptor. not vice versa

Australian Geomechanics Vol 42 No 1 March 2007
Form No. 68039 RL2 August 2010

 

Page 49

PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007
APPENDIX C: —- QUALITATIVE TERMINOLOGY FOR USE IN ASSESSING RISK TO PROPERTY (CONTINUED)

QUALITATIVE RISK ANALYSIS MATRIX - LEVEL OF RISK TO PROPERTY

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LIKELIHOOD CON: SEQUENCE ES TO PROPERTY (With Indicative Approximate Cost of Demsge)_
Indicative Value of 1: CATASTROPHIC : MAJOR 3: MEDIUM 4: MINOR
Approximate Annual 200% 60% 20% 5% IN! SIGNIFIC ANT
Probability 0.5%
A - ALMOST CERTAIN 107 H MorL (5)
B - LIKELY 107 M L
C - POSSIBLE 107 M VL
D - UNLIKELY 107 L VL
E - RARE 107 M L L VL VL
F - BARELY CREDIBLE 10% L VL VL VL VL

 

 

 

 

 

 

 

Notes: (5) For Cell AS, may be subdivided such that a consequence of less than 0.1% is Low Risk.
(6) When considenng 2 nsk assessment it must be clearly stated whether it 1s for existing conditions or with nsk control measures which may not be implemented at the current

time.

 

 

 

 

 

 

 

RISK LEVEL IMPLICATIONS
Risk Level Example Implications (7)
Unacceptable without treatment. Extensive detailed investigation and research, planning and implementation of treatment
options essential to reduce risk to Low; may be too expensive and not practical. Work likely to cost more than value of the
property.
H HIGH RISK Unacceptable without treatment. Detailed investigation, planning and implementation of treatment options required to reduce
nisk to Low. Work would cost a substantial sum m relation to the value of the property.
May be tolerated m certain circumstances (subject to regulator's approval) but requires investigation, planning and
M MODERATE RISK umplementation of treatment options to reduce the nsk to Low. Treatment options to reduce to Low nsk should be
implemented as soon as practicable.
- Usually acceptable to regulators. Where treatment has been required to reduce the nsk to this level, ongomg maintenance is
L LOW RISK required
VL VERY LOW RISK Acceptable. Manage by normal slope maintenance procedures.

 

 

 

Note: (7) The implications for a particular situation are to be determined by all parties to the risk assessment and may depend on the nature of the property at risk: these are only
given as a general euide.

Form No. 68039 RL2 August 2010

Australian Geomechanics Vol 42 No 1 March 2007

 

 

Page 50

PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007

APPENDIX G - SOME GUIDELINES FOR HILLSIDE CONSTRUCTION

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

GOOD ENGINEERING PRACTICE POOR ENGINEERING PRACTICE
ADVICE
GEOTECHNICAL Obtain advice from 2 quabfied experianced geotechnical practioner at early | Prepare detailed plan and start vite works before
ASSESSMENT stage of planing and before ws works. geotechnical adrice
PLANNING
SITE PLANNING Having obnmed advice, plan the development with ths nak | Plan development without rosard for the Risk
ising from the identified harards and consequences in mind
DESIGN AND CONSTRUCTION
Use flexible stuctmes which incorporam property desimed brickwork, timber | Fleer plans which require extents coming and
HOUSE DESIGN or steel frames, umber or pamel cladding i
Consider use of split levels. Movement intolerant suctares.
Use decks for recreational areas where sppropciste.
SITE CLEARING ee Tndtecrminately clear the site.
ACCESS = ‘beuow for cut, Ds, recaumng walls anc dramage. Excavate and £0 for site access beiore
DRIVEWAYS Goal apecihcateas Sc pais anty ened we toneaiied gectechnical advice
Drivewsys and wom cary Deed to be fully supported on pears.
EARTHWORKS Rewin netral coutour wherever possible. Tadescriminatory balk saxthworks.
Septh. ‘Large scale cuts and benching.
Cots a ee eee Unseppored cats
‘Mimumise baight Loose or poorly compacted £0 wiach ifit Subs,
Strip vegemtion and topsoil and key into natural slopes price to filling may flow a considerable Gctamcs incindas
‘Uve clean SIL carecials and compact to expoeenng smadards. onto below.
Fis Barat to spprogeias wope or support with engmmedred retaining wall Bloch samral drainage lines
Tecinds stumps, trees, vegetation, topsod,
boulders, brelding rubble otc im SE
Racy, Ouicrcrs Remove ox stabilise boulder: which may ave macceptable nuk Disturb ct undeccot detached blocks or
& Bou sexs Support rock Sces where necessary boulders.
desis to resist applied sod and water forces. Constract a structerally inadequate wall wach as
RETADNING Found cn rock where practicable. sandstone «flagsing brick oo =mremiorced
WALLS Provide subsurface draimags within wall backSill and surface draimags om shops | blockwork.
- shove Lack of subsurdace drains and weepbolss
Constract wall a5 s00n 35 possible after cut/Sl! operation.
Found withm rock where “Found om topscal, Toow SIL demched Sonidars
FOOTINGS ‘Use roms of piers or strip footings arented =p and down slope. or undercet cif.
Design for lacaral cosp pressures if necossary.
Back footing excavations to exclude ingress of surface water.
Support on piers to rock where practicable.
Design for high sod] pressures ae develop on aphall cide wicket thare
aaphs aseae Eeatenena enon
DRAINAGE
Provide at tops of cut and fill slopes. Discharge at top of Sik and cuts.
Descharge to stect drainage of nataral water courses. Allow weter to pond on bench areas.
Sumacn Provide general falls to prevent bicckage by siltation and incorporate silt traps.
‘Lins to mininess mGltraton and maks flauble wher posible
—__ Special souctures to dissipate anergy 21 changes of slope andor direction.
Provide filter around sebsurface drain. Discharge roof runof inte abscrpnom mmmches.
RNIN Provide drain bebind retaining vals,
‘Use flexible papslines with access for maintenance.
Prevent inflow of surface water.
Sure ‘Oseally requires pump-out or mums semer systeas, absorpoce menches may | Discharge Groctly caro and aso slopes.
ee be possible m scans areas if mak is acceptable. Use absorpeion tranche: wi consderica
a Storage tanks thomld be water-tight and adeqeamly founded of tandilide risk.
EROSION Control erosion as this my lead to mstabiliry. Faire to cbhsare cathwork: and dame
CONTROL & Ene cleared area Teccommandanon: when
ms eects sesepoa
DRAWINGS AND SITE VISITS DURING CONSTRUCTION
DRAWINGS Application dawmas should bs viewed by aectechmical comsnizant
SITE VISITS Sits Visits by consultant may be appropnate during constuction
INSPECTION AND MAINTENANCE BY OWNER
OWNER'S Clean cratmage sytem: reper broken join = dram and leaks in supply
RESPONSIBILITY | pipes.
Where stmcteral distress is ovidant sos advice.
E seepage observed determine cme: or soak advice on consequences

 

 

 

 

Australian Geomechanics Vol 42 No 1 March 2007

 

Page 51

                   THE ONLY NAME IN SOILS
                                                                      QBCC Licence No. 1018403
                                                                      PH: 07 54 740 900
                                                                      3/53 Gateway Drive, Noosaville 4566
                                                                      Email: [email protected]

 JOB NUMBER          20/0309    SITE CLASSIFICATION REPORT
 CLIENT              RG STRATEGIC AUSTRALIA.
 SITE                PROPOSED ALTERATIONS & ADDITIONS TO EXISTING UNITS.
 LOCATION            38 AVOCET PARADE, PEREGIAN BEACH.
 REPORT DATE         24/04/2020

   1. INTRODUCTION
      The purpose of this report is to classify the subject allotment in accordance with Australian
      Standard 2870 - 2011 'Residential Slabs and Footings'. From this classification, a footing
      system can be recommended for the structure so as to allow adequate performance of the
      footings under the soil conditions determined at the site.
      Trees: There are several medium sized trees on & adjacent to the proposed site. Global
      Testing recommends an experienced arborist be commissioned to quantify the existing
      size, location, predicted maximum height and type of these trees to aid in the design
      process. It is the responsibility of the designing engineer to apply the principals of
      AS2870-2011 Appendix H "Guide to Design of Footings for Trees". The classification
      herein excludes the effect of trees on the site.

   2. SITE DESCRIPTION
       Type of Allotment                                                 Residential
       Vegetation (Building Envelope)                     Sparsely grassed/ Scattered medium sized
                                                                        mature trees
        Vegetation (Allotment)                            Sparsely grassed/ Scattered medium sized
                                                                        mature trees
        Road Status                                                        Sealed
        Slope                                                          13% to the East
        Surface Water will Drain Towards                                  The East
        Will Surface Water from adjoining                                    Yes
        allotments traverse this site?
        Does the site have any watercourses                                    No
        Surrounding Allotments
                                                 Left                 Existing Residence
                                                Right                 Existing Residence
                                                Rear                  Existing Residence
        Depth to Weathered Rock                                               N/a
        Depth to Water Table                                                  N/a

   3. SITE CLASSIFICATION AND TARGET STRATA
      Based on the findings of the site investigation, the classification of the site is considered to
      conform to:
                CLASS “ P ” ( Due to poor bearing capacity & the presence of
                              trees-See Target Stratum).
            PLEASE NOTE: If not for the poor bearing capacity encountered & presence of trees,
                       this site would have the characteristics of an “S” Site.


Page | 1 Borelogging in accordance with AS1726-2017 Geotechnical Site Investigations Code
                                            20/0309

Page 52

       in accordance with Australian Standard 2870 - 2011, 'Residential Slabs and Footings,
       Construction'.

       The Target Stratum for the foundation of the structure at locations BH1 & BH2 is the
       SAND at a depth of 1900mm (min.150kPa) below existing ground level.
       The Target Stratum for the foundation of the structure at location BH3 is the SAND at a
       depth of 1800mm (min.150kPa) below existing ground level.

       It is the designing engineer’s responsibility to address the potential influence of any trees
       present on or around the proposed building site.

       If any further fill is placed over the existing ground, the structure shall be piered through
       the fill into the existing material. Further note that the placement of reactive material as
       fill or cutting of the site may change the site’s classification.

       PLEASE NOTE: This report does not address slope stability. If a slope stability analysis
       is required, the services of a suitably qualified geotechnical engineer should be sought.

   4. SOIL PROFILE
      Refer to Soil Profile Report for borelog information

       Whilst every effort has been made to ensure that the borelogs carried out at the subject allotment
       are indicative of the soil profile over the site any discrepancy between the profile detailed in
       the borelogs and that observed during construction shall be referred to Global Testing for
       immediate attention.

   5. MATERIALS LABORATORY TEST RESULTS
      Soil Laboratory testing was not carried out on samples of the soil taken from the site because
      the clay content of the material was too low for Shrink-Swell movements to be critical in the
      classification of the soil profile. Determination of the classification for the site in this situation
      is based upon results from Dynamic Cone Penetrometer testing performed over the site.

                  BOREHOLE                                                   N/a
                  DEPTH RANGE OF SAMPLE                                      N/a
                  LIQUID LIMIT (%)                                           N/a
                  PLASTIC LIMIT (%)                                          N/a
                  PLASTIC INDEX (%)                                          N/a
                  LINEAR SHRINKAGE (%)                                       N/a
                  INSTABILITY INDEX (%)                                      N/a
                  SHRINK SWELL INDEX, Iss (%)                                N/a
                  PREDICTED SURFACE MOVEMENT                                 N/a
       Please note that the Plasticity Index (PI) determined by the Atterberg Test may be correlated to
       an Instability Index (Ips)with reference to the results of extensive testing carried out by others,
       notably, Dr P Mitchell, ‘Footings for Small Scale Domestic Structures,’ March 1990.
       Yours Sincerely,




MICHAEL PINKNEY. (Laboratory Manager)
Page | 2 Borelogging in accordance with AS1726-2017 Geotechnical Site Investigations Code
                                            20/0309

Page 53

                                             LIMITATIONS

       Recommendations given in this report are based on the information supplied by the client
       regarding the proposed building construction in conjunction with the findings of the
       investigation. Any change in construction type, building location or omission in the client
       supplied information, may require additional testing and/or make the recommendations
       invalid.

       The recommendations herein identify a target soil stratum into which the footings are to be
       founded. The target stratum has been located by the depth in mm of the target stratum's upper
       horizon boundary below the existing ground surface level at the time of the site investigation.
       Any cutting or filling works and any surface erosion or deposits subsequent to the site
       investigation, will alter the measured location of the stratum relative to the surface. Where
       required, the author should be notified in such cases to confirm the location of the target
       stratum.

       The description of the soil given in the Soil Profile section of this report is intended as a brief
       overview of the soil's primary constituents. For a detailed classification of the soil, the reader
       should refer to the Soil Profile Reports and/or Borehole Reports attached to this report.

       Every reasonable effort has been made to locate the test sites so that the borehole profiles are
       representative of the soil conditions within the area investigated. The client should be made
       aware however, that exploration is limited by time available and economic restraints. In some
       cases, soil conditions can change dramatically over short distances, therefore, even careful
       exploration programs may not locate all the variations.

       If soil conditions different from those shown in this report are encountered or are inferred
       from other sources, then the author must be notified immediately.

       This report may not be reproduced except in full. The information and drawings provided
       with this report shall only be used and will only be applicable for the development shown on
       the client supplied information provided for this site.

       Any dimensions, contours, slope directions and magnitudes shown on the Test Locality Plan
       shall not be used for any building construction or costing calculations. The purpose of the
       plan is to show approximate location of field tests only.

       Any changes made to these recommendations by persons unauthorised by the author will
       legally be interpreted as that person assuming the responsibility for the long-term
       performance of the footing system.

       The recommendations contained in this report have not taken into consideration the long-term
       effects of any previous, current or potential subsurface work by mining companies or
       potential slope instability problems. At the time of writing this report neither our client (nor
       his agent) nor the local authority had made the author aware that these problems may be
       affecting this allotment. If a mining subsidence or slope stability assessment is required for
       this allotment, the recommendations of a suitably qualified geotechnical engineer should be
       sought.



Page | 3 Borelogging in accordance with AS1726-2017 Geotechnical Site Investigations Code
                                            20/0309

Page 54

                 THE ONLY NAME IN SOILS


 SOIL PROFILE REPORT
 CLIENT:        RG Strategic Australia.               AUTHORISED               RG Strategic Australia.
                                                      BY:
 PROJECT:       38 Avocet Parade,                     DATE TESTED:             23/04/2020
                Peregian Beach.                       JOB NO:                  20/0309


                  Drilling Method: Jacro 105 100mm.                                          Borehole
                                                                                               No.1
    Depth       Description                                                  PENET.         Est. Bearing
                                                                       (blows per 100mm)
    (mm)                                                                                     Capacity
                                                                                                (kPa)
                                                                         1      2 3 4
       0        BITUMEN.

      50        (FILL) SANDY CLAYEY GRAVEL (GC)- Fine                    -                       -
                to coarse grained, pale brown, low plasticity fines,
                fine to coarse sand, moist, medium-dense.
      100                                                                -
      200                                                                -
      300       SAND (SP)- Fine to coarse grained, pale grey/            2                      50
                brown, moist, loose.
     400                                                                 2
     500                                                                 2
     600                                                                 2                      50
     700                                                                 2
     800                                                                 2
     900                                                                 2                      50
     1000                                                                2
     1100                                                                2
     1200       SAND (SP)- Fine to coarse grained, pale grey/            3                      100
                brown, moist, medium-dense.
     1300                                                                3
     1400                                                                3
     1500                                                                3                      100
     1600                                                                3
     1700                                                                4
     1800                                                                4
     1900                                                                5                      150
     2000                                                                5
     2100                                                                6
     2200                                                                6                      200
     2300                                                                6
     2400                                                                6
     2500                                                                6                      200
     2600                                                                6
     2700                                                                6
     2800                                                                7                      225
     2900                                                                7
     3000                                                                7
       -
     3500       Hole Terminated.

Page | 4 Borelogging in accordance with AS1726-2017 Geotechnical Site Investigations Code
                                            20/0309

Page 55

            THE ONLY NAME IN SOILS


 SOIL PROFILE REPORT
 CLIENT:        RG Strategic Australia.            AUTHORISED             RG Strategic Australia.
                                                   BY:
 PROJECT:       38 Avocet Parade,                  DATE TESTED:           23/04/2020
                Peregian Beach.                    JOB NO:                20/0309


                 Drilling Method: Hand Auger 100mm.                                     Borehole
                                                                                          No.2
    Depth       Description                                         PENET.             Est. Bearing
                                                                (blows per 100mm)
    (mm)                                                                                Capacity
                                                                                           (kPa)
                                                                1     2      3 4
       0        SAND (SP)- Fine to coarse grained, pale grey/
                brown, moist, loose.
     100                                                              2                    50
     200                                                              1
     300                                                              2
     400                                                              1                    30
     500                                                              2
     600                                                              2
     700                                                              2                    50
     800                                                              2
     900                                                              2
     1000                                                             2                    50
     1100                                                             2
     1200                                                             2
     1300       SAND (SP)- Fine to coarse grained, pale grey/         3                    100
                brown, moist, medium-dense.
     1400                                                             3
     1500                                                             3
     1600       Hole Collapsing-Hole Terminated.                      4                    125
     1700                                                             3
     1800                                                             4
     1900                                                             5                    150
     2000                                                             5
     2100                                                             5
     2200                                                             5                    150
     2300                                                             6
     2400                                                             6
     2500                                                             6                    200
     2600                                                             6
     2700                                                             6
     2800                                                             7                   >200
     2900                                                             6
     3000                                                             6




Page | 5 Borelogging in accordance with AS1726-2017 Geotechnical Site Investigations Code
                                            20/0309

Page 56

              THE ONLY NAME IN SOILS


 SOIL PROFILE REPORT
 CLIENT:        RG Strategic Australia.            AUTHORISED           RG Strategic Australia.
                                                   BY:
 PROJECT:       38 Avocet Parade,                  DATE TESTED:         23/04/2020
                Peregian Beach.                    JOB NO:              20/0309


                 Drilling Method: Hand Auger 100mm.                                   Borehole
                                                                                        No.3
    Depth       Description                                         PENET.           Est. Bearing
                                                                (blows per 100mm)
    (mm)                                                                              Capacity
                                                                                         (kPa)
                                                                1   2     3     4
       0        SAND (SP)- Fine to coarse grained, pale grey/
                brown, moist, loose.
     100                                                                  1              30
     200                                                                  1
     300                                                                  1
     400                                                                  2              50
     500                                                                  1
     600                                                                  2
     700                                                                  1              30
     800                                                                  2
     900                                                                  1
     1000                                                                 2              50
     1100                                                                 2
     1200       SAND (SP)- Fine to coarse grained, pale grey/             3              100
                brown, moist, medium-dense.
     1300                                                                 3
     1400                                                                 3
     1500                                                                 3              100
     1600       Hole Collapsing-Hole Terminated.                          3
     1700                                                                 3
     1800                                                                 5              150
     1900                                                                 6
     2000                                                                 6
     2100                                                                 6              200
     2200                                                                 6
     2300                                                                 7
     2400                                                                 7             >200
     2500                                                                 8
     2600                                                                 7
     2700                                                                 7             >200
     2800                                                                 7
     2900                                                                 7
     3000                                                                 7




Page | 6 Borelogging in accordance with AS1726-2017 Geotechnical Site Investigations Code
                                            20/0309

Page 57

        THE ONLY NAME IN SOILS




                                 Site- 38 Avocet Parade,
                                     Peregian Beach.



Page | 7 Borelogging in accordance with AS1726-2017 Geotechnical Site Investigations Code
                                            20/0309

Page 58

         THE ONLY NAME IN SOILS




Page | 8 Borelogging in accordance with AS1726-2017 Geotechnical Site Investigations Code
                                            20/0309

Page 59

                    The only name in soils


                           Test Locality Plan
                                                           LEGEND

 N                                                            BH - Borehole Location
                                                              PN - Dynamic Cone Penetrometer Location
                                                              PT - Percolation Test
                                                                  -Trees


                                                                                      BH2
                                                                                      PN2

                                                                                      2m         5m
              12m




                                    BH1
                        4.5m        PN1




                                                                                   13% Slope




                                                                                BH3               7m
                                                                                PN3




                                                                                                                     10m




                                                Avocet Parade
                                                                                                                 Not to Scale
Note: Any dimensions, contours, slope directions and magnitudes shown on the plan shall not be used for any building
construction or costing calculations. The purpose of the plan is to show the approximate location of the field tests only. All
dimensions in metres UNO .



Client: RG Strategic Australia.                                                                                        Job No. 20/0309
Address: 38 Avocet Parade,                                                                                      Date Tested: 23/04/2020
        Peregian Beach.                                                                                Authorised:RG Strategic Australia.

Page 60

~

Ci

STRATEGIC

STRATEGIC SOLUTIONS,
CREATIVE THINKING

rgstrategic.com.au

 

Used in these records

About this file

File size
8.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Avocet Pde OPW - App E Slope.pdf · 8.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.