Council archive · source document
Avocet Pde OPW - App E Slope · OPW20/0092
AUSTRALIAN GEOGUIDE LR8 (CONSTRUCTION PRACTICE) Sensible development practices are required when building on hillsides, particularly the hillside has more than a low risk of instability (GeoGuide LR7). Only building techniques intended to maintain, or reduce. the overall level of landslide risk should be considered. Examples of good hillside construction practice are illustrated below. EXAMPLES OF GOOD HILLSIDE CONSTRUCTION PRACTICE =a Vegetation reamed = Surface water interception drainage d a Waleright adequately sted anc founded root water storage tanks (with due regard for impact of polentcal leakage) Fimoble structure Root water piped of site or stored — On-site delention tanks, waterlignt and adequately foundes. Potential leakage managed by subsoil drains - — ~ Piar footings into rock Subsoll drainage may be required in slope Cutting and fling minimised in develooment ~ Sewage ¢ffuent pumped out or connected io sewer Tanks adequataly foundad and watertght. Potential leakage managed by sub-soll drains ~____ Engineered retaineig walls with both surface and ‘subsurface drainage (constructad before dwelling) (p) Aa (pei) See 280 AGS [TON Opperie 1 WHY ARE THESE PRACTICES GOOD? Roadways and parking areas - are paved and incorporate kerbs which prevent water discharging straight into the hillside (GeoGuide LR5). Cuttings - are supported by retaining walls (GeoGuide LR6). Retaining walls - are engimeer designed to withstand the lateral earth pressures and surcharges expected, and include drains to prevent water pressures developing in the backfill. Where the ground slopes steeply down towards the high side of 2 retaining wall, the disturbing force (see GeoGuide LRG) can be two or more times that in level ground. Retaining walls must be designed taking these forces into account. Sewage - whether treated or not is either taken away in pipes or contained in properly founded tanks so it cannot soak into the ground. Surface water - from roofs and other hard surfaces is piped away to a suitable discharge point rather than being allowed to infiltrate into the ground. Preferably, the discharge point will be in a natural creek where ground water exits, rather than enters, the ground. Shallow, lined, drains on the surface can fulfil the same purpose (GeoGuide LR5). Surface loads - are minimised. No fill embankments have been built. The house is a lightweight structure Foundation loads have been taken down below the level at which a landslide is likely to occur and, preferably, to rock. This sort of construction is probably not applicable to sol slopes (GeoGuide LR3). If you are uncertain whether your site has rock near the surface, or is essentially a sol slope, you should engage a geotechnical practitioner to find out. Flexible structures - have been used because they can tolerate a certain amount of movement with minimal signs of distress and maintain their functionality. Vegetation clearance - on soil slopes has been kept to a reasonable minimum. Trees, and to a lesser extent smaller vegetation, take large quantities of water out of the ground every day. This lowers the ground water table, which in tum helps to maintain the stability of the slope. Large scale clearing can result in a rise in water table with a consequent increase in the likelihood of a landslide (GeoGuide LR5). An exception may have to be made to this rule on steep rock slopes where trees have little effect on the water table. but their roots pose a landslide hazard by dislodging boulders. Possible effects of ignoring good construction practices are illustrated on page 2. Unfortunately, these poor construction practices are not as unusual as you might think and are often chosen because, on the face of it, they will save the developer, or owner, money. You should not lose sight of the fact that the cost and anguish associated with any one of the disasters Hlustrated, is likely to more than wipe out any apparent savings at the outset. ADOPT GOOD PRACTICE ON HILLSIDE SITES 74 Australian Geomechanics Vol 42 No 1 March 2007
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Avocet Pde OPW - App E Slope.pdfRelated documentApplication case desk ↗
About this file
- File size
- 8.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.