• The area should be stripped of uncontrolled fill, soft, overly wet, foreign, or otherwise
deemed unsuitable material (material that is potentially compressible) down to a relatively
stiff dry base ensuring no organics material is present.
• Stripped areas must be inspected by the geotechnical testing authority (GTA) to ensure no
soft spots or loose zones are present. This should be done with the use of a loaded body
truck or 12 tonne roller as a minimum. Areas showing signs of movement under the action
of the testing equipment should be either over excavated and replaced with select fill or
conditioned onsite through tyning, blending or other suitable methods.
• Although no standard exists for the moisture content of soils, it is recommended that the
site soils be placed at or near optimum moisture content (OMC) for general earthworks
operations. This increases efficiency during earthworks operations. A range of +/- 2% of
OMC is recommend for general earthworks.
• Where site soils are proposed for use as fill in other areas, won material will need to have
a maximum particle size of 75 mm or be observed to break down under the energy of
compactive equipment.
• Fill materials should be placed in relatively horizontal layers with a maximum placement
thickness of 200 mm. The materials should be compacted to a minimum dry density ratio
of 95% relative to Standard compactive effort.
• Highly plastic clays at this site will be very sensitive to the presence or lack of moisture and
therefore care should be used to place the material within the range nominated and to a
maximum dry density of 102% relative to Standard compactive effort. Where this does not
happen, the material could readily swell, soften, or be subject to significant trafficability
issues.
• Fill material will be subject to potential settlement post placement. Well compacted fill
placed in accordance with AS3798 and otherwise, good earthworks procedure should
typically be subject to settlement in the order of 0.5% to 1.0% of the fill thickness over a
log cycle of time.
5.2 Site Movement
The results of the investigation, previous experience, and published correlations were used to
estimate the maximum characteristic ground surface movement (ys) value in accordance with
AS 2870.
The results of the calculations indicate that at the time of the investigation, a ys value
approximately equal to less than <20 mm is considered suitable; however, the site must be
classified as Class P given the requirement for slope stability assessment.
It is important to understand that numerous things can affect and consequently increase or
decrease the ys value for a site.
29 Apr 2020 Proposed Residnetial Dwelling
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Avocet Pde OPW - App E Slope.pdfRelated documentApplication case desk ↗
About this file
- File size
- 8.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.