BA250052 Architectural
Attached to the e-mail Generally in Accordance - Revised Design - MCU21/0150.02.
INSTALLATION OF GUTTERING MUST
COMPLY WITH NCC VOL 2 2022
REFER TO ENGINEER DESIGN PART 7.4.3 - SELECTION OF GUTTERING
AND PART 7.4.4 - INSTALLATION OF GUTTERS.
FOR ALL ROOF FRAMING
DETAILS & SPECIFICATIONS DOWNPIPES TO COMPLY WITH NCC VOL 2 2022
PART 7.4.5 - DOWNPIPES - SIZE AND INSTALLATION
DP - 90mm PVC Downpipes
SP - Spreader Downpipe N/A
150mm MEGAFLOW QUAD GUTTER
DP
600
DP
600
7.5 PITCH 14 PITCH
FALL FALL
45.79m2 74.33m2
DP
600
DP
270
PARAPHET
MATERIALS/FINISHES LEGEND TOTAL m²/LM
ROOF LAYOUT COLORBOND 'TRIMDECK' ROOF SHEETING COLOUR CBOND JASPER 120.12 m²
SCALE 1:100 COLORBOND 150mm QUAD GUTTER
DP - 90MM PVC DOWNPIPES
COLOUR CBOND JASPER 23 LM
PAINT FINISH CBOND JASPER 4 DOWNPIPES
ROOF INSULATION - 55MM ANTICON UNDER ROOF SHEET 120.12 m²
NOTE: R3.5 INSULATION BATTS TO INTERNAL CELINGS ONLY. NO CEILING INSULATION TO OUTDOOR
VERANDAHS OR PATIOS. ANTICON ONLY TO THESE AREAS.
FOR CONSTRUCTION
Rev No. Description Date
1 Concept Floor Plan 12/08/2024 Client: Sophie McLaren
ROOF LAYOUT
22/11/2024 12:13:19 PM
2 Concept Plans Selections 23/08/2024 Description: New Dwelling
3 Preliminary Working Drawings 28/08/2024 Project number 6335
4 For Construction 3/10/2024
5 For Construction - Lodgement 15/10/2024 Site Address: 9 Rules Rd Pomona Qld Date 12/08/2024 A106.01
6 For Construction - Contract 18/11/2024 Drawn by T.D
© QBCC Lic no. 15187645 Checked by T.D Scale As indicated
See the original