Skip to the record
Accept no substitutions.

Council archive · source document

08/1981 - Preliminary Building Approval - Demolition [As Published] · 172008.1981

of 20

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

   

“Nat
1.

INTEGRATED PLANNING ACT 1997 Part E, Version 3.1, 3 March 2008

a a ormpl| Hevelopment¥Application

 

PartE

Building &/or operational work assessable against a planning scheme

ure:of the works «

Nature of work that requires assessment against a planning scheme:
By Building work - Complete Table A (1 Operationat work - Complete Table 8

 

Table A
(i) What is the nature of the building work made assessable in the ptanning scheme?

| Dewourtient-0F-6cSTAe BULLONG |

(ii) Are there any current approvals associated with this application? (e.g. material change of use)
No LO Yes - Provide details below

List of approval reference/s Date approved Date approval lapses (if known}
Li.

 

 

 

 

 

 

 

 

 

 

 

Table B
(i) What is the nature of the operational work made assessable in the planning scheme?
CO Roadworks CO Stormwater (2 Water infrastructure [[] Clearing vegetation under the planning scheme

(1 Drainage works + (] Earthworks CO Sewerage infrastructure
(Landscaping U Signage (1 Other - Specify
(iii) What type of approvat is being sought? (NOTE: if you have indicated multiple operational works in question (i) above and your answers to this question
would be different for different operational work, it may be more appropriate to provide these details in an attachment to this form)
CL) Development Permit {_] Preliminary Approval (1 Both (Specify below)
(iv) Is the operational work necessary to facilitate the creation of new lots (ie. subdivision)?
CINo (1 Yes - Specify the number of lots being created

 

 

 

 

 

 

(v) Are there any current approvals associated with this apptication? (6.9. Development Permit or Preliminary Approval for MCU or reconfiguring a fo!)
CINo (1 Yes - Complete Table B(a)
Table Bia) - Ust of approval references Date approved’ —_| Date approval lapses (if known)

1.

 

 

 

 

 

 

 

 

 

2. Whats the dollar value of this operational work? (ie. the total value including GST, materials and fabour) $
‘Mandatory information =
3. Confirm the following mandatory information accompanies this application

 

 

 

 

 

Confirmation of iodgement| Method of lodgement

 

 

Plans, and specifications if applicable, showing the nature’and location of the Proposed works (including the
extet of any cut ane i) aes : _ " BS, Confirmed

 

 

 

 

OFF

ICE USE ONLY

 

 

 

 

 

 

 

 

Advice

for completing Part E

 

General advice

Part A must also be completed for all IDAS development applications.
The applicant is responsible for answering all questions fully and correctly, untess following a response there is a statement to go directly to another question.

 

 

Qi

 

[ A development permit authorises development to occur, while a preliminary approval is a step in the appraval process and does not authorise development to occur.

 

Page 1

Used in these records

About this file

File size
1.7 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_1981 - Preliminary Building Approval - Demolition [As Published].pdf · 1.7 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.