Decision Notice - Approved by Delegation of Authority DBW24/0077 (As Published)
Officer: Matt Pinese
Direct Telephone: 07 53296284
Our Reference: DBW24/0077 & RAP24/0021
Your Reference: n/a
16 October 2024
AM Mihos
C/- Brennan Planning Pty Ltd
44 Maple St
COOROY QLD 4563
[email protected]
Dear Sir/Madam,
Decision Notice
Planning Act 2016
I refer to your application and advise that on 16 October 2024, Council decided to approve the
application, subject to conditions.
Details of the decision are as follows:
1. APPLICATION DETAILS
Application No: DBW24/0077
Street address: 66 Lorikeet Dr Peregian Beach Qld 4573
Real property description: Lot 912 P 93121
Planning Scheme: Noosa Plan 2020 (25 September 2020)
2. DECISION DETAILS
Council decided to issue the following type of approval:
• Development Permit for Building Work Assessable Against the Planning Scheme - Additions to
Dwelling House (Building Work For A Dwelling House in The Coastal Protection And Scenic
Amenity Overlay and Driveway Width).
3. CURRENCY PERIOD OF APPROVAL
The currency period for this development approval is stated in the conditions below.
ABN 97.969.214.121 PO Box 141
noosa.qld.gov.au Tewantin QLD 4565
[email protected] 07 5329 6500
Page 1 of 8
Document Set ID: 23302434
Version: 3, Version Date: 22/10/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 7 pages
Page 2
4. ASSESSMENT MANAGER CONDITIONS
PLANNING
When Conditions must be Complied With
1. Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to
the use commencing, and then compliance maintained at all times while the use continues.
Currency Period
2. This development approval lapses if the works have not substantially started by 16 October
2026, unless an application to extend the currency period is approved by Council.
Approved Plans
3. Development authorised by this approval must be undertaken generally in accordance with
the Approved Plans listed in the table below. The plans must be amended to incorporate the
amendments listed within the table below and resubmitted to Council prior to the issue of any
Development Permit for Building Works*
Plan No. Rev. Plan/Document Name Date
DD.02 02 Exist. and Demolition Level G Floor Plan prepared 08/08/2024
by Georgina Price Design
DD.03 02 Exist. and Demolition Level 1 Floor prepared Plan 08/08/2024
Georgina Price Design
DD.04 02 Level G prepared by Georgina Price Design 08/08/2024
DD.07 02 West and North Elevations prepared by Georgina 08/08/2024
Price Design
DD.08 02 East and South Elevations prepared by Georgina 08/08/2024
Price Design
DD.09 02 Section A-A, B-B, prepared by Georgina Price 08/08/2024
Design
DD.10 02 Section C-C, D-D, prepared by Georgina Price 08/08/2024
Design
The following plans require amendment.
Plan No. Rev. Plan/Document Name Date
DD.01 02 Site Plan and Notes prepared by Georgina Price 08/08/2024
Design
DD.05 02 Level G prepared by Georgina Price Design 08/08/2024
DD.06 02 Roof Plan prepared by Georgina Price Design 08/08/2024
Amendments The above plans showing the proposed section of the carport roof within the
front setback (below in red linework) is to replaced with an open (permeable)
timber slats or similar covering.
Page 2 of 8
Document Set ID: 23302434
Version: 3, Version Date: 22/10/2024
Page 3
Building Height
4. The maximum height of the development must not exceed 8 metres above the ground level.
External Colours & Finishes
5. External colours and finishes must be of muted environmental tones that blend with the
surrounding vegetation and landscape, with broad expanses of a single colour or reflective
surfaces not permitted.
Car Parking
6. A minimum of 2 car parking spaces must be provided on site and made available and
accessible at all times for residents.
Lighting Amenity
7. No flood lighting must be used on site. Any vertical illumination resulting from direct, reflected
or other incidental external lighting emanating from the site must not exceed 8 lux when
measured at any point 1.5 metres outside the boundary and at any level from ground level
upward.
Environment
8. Sediment or any other material including building materials or waste products must not be
deposited or released into the road reserve, stormwater drain or adjacent properties.
Landscaping Works
9. A minimum of 20% of the site must be retained as soft landscaping.
10. Existing trees on the site must be retained, except where required to be removed to
accommodate the approved dwelling alterations and extension. In this regard, the removal
of vegetation must not extend beyond 3 metres of the building footprint.
11. Existing vegetation in the road reserve must be retained, unless written authorisation from
Council is granted for the clearing.
12. All landscape works must be established and maintained for the life of the development, and
in a manner that ensures healthy, sustained and vigorous plant growth. All plant material
must be allowed to grow to full form and be refurbished when its life expectancy is reached.
13. A mix of native landscaping, such as ground covers, shrubs and trees, is provided for a width
of 5 metres from the seaward or rear boundary of the site to provide adequate landscape
buffering to protect the coastal dune system. Refer to the Table 3.1 & 3.2 of PSP2
Landscaping for suitable coastal species.
Page 3 of 8
Document Set ID: 23302434
Version: 3, Version Date: 22/10/2024
Page 4
14. Site Access and Driveways
15. Driveway crossovers must be constructed in accordance with Council’s Standard Drawings
RS-049, RS-050 and any associated addendum.
16. Any existing unnecessary or redundant property accesses must be removed, and the kerb,
footpath and verge area reinstated to match the existing footpath and/or verge treatments.
Grassed verge areas to be reinstated must be provided with 100 mm topsoil and grass seed
or turf, and must be maintained by the developer until established.
Stormwater Drainage
17. Stormwater runoff from the development must be discharged to a lawful point of discharge
and/or disposed of on-site without causing scour or damage to the subject site or any
adjoining property.
18. Appropriate scour protection must be provided at the outlet of all stormwater pipes including
temporary outlets.
19. Works associated with this permit must not adversely impact on the existing drainage
conditions on other properties (e.g., by blocking or interfering with natural overland flows).
20. Construction of all internal stormwater drainage works must comply with the relevant
section/s of Australian Standard AS/NZS 3500.3.
Earthworks and Retaining Walls
21. All earthworks must include the installation and maintenance of appropriate erosion and
sediment control measures. Prescribed Water Contaminants (as defined in Schedule 10 of
Environmental Protection Regulation 2019) must not be released from the site or to waters
within the site, or be likely to be released should rainfall occur, unless all reasonable and
practicable measures are taken to prevent or minimise the release and concentration of
contamination.
22. Erosion and Sediment Control 20. Prescribed Water Contaminants (as defined in Schedule
10 of Environmental Protection Regulation 2019) must not be released from the site or to
waters within the site, or be likely to be released should rainfall occur, unless all reasonable
and practicable measures are taken to prevent or minimise the release and concentration of
contamination.
23. Sediment and erosion control measures must be in place prior to works commencing. If such
measures are not in place or are not satisfactory, “on the spot” fines may be issued. Such
fines can be issued if sediments from the site are found to enter or have the potential to enter
Council’s stormwater system, natural waterways, any downstream stormwater filtration
system or adversely impacting on other properties. The sediment and erosion control design
and measures have NOT been approved, it is the site's Supervising Engineer who is
responsible for ensuring that the sediment and erosion control measures have:
24. The erosion and sediment control measures must be designed, installed and maintained in
accordance with the supervising engineer instructions and the current best practice
standards * (Refer to Advisory Note).
a. Been duly designed by an RPEQ or CPESC and constructed in accordance with "best
practise" methods,
b. Been revised by an RPEQ or CPESC to address the issues raised by changes in the
projected construction schedule and/or methods,
c. Been revised to address predicted rainfall events, and
d. Achieve the desired environmental outcomes.
Council may request further controls to be installed should the implemented measures be
found inefficient.
Page 4 of 8
Document Set ID: 23302434
Version: 3, Version Date: 22/10/2024
Page 5
25. The erosion and sediment control measures must be designed, installed and maintained in
accordance with the supervising engineer instructions and the current best practice
standards * (Refer to Advisory Note).
26. The developer must ensure non-essential exposure of soil is prevented by restricting the
extent of disturbance and minimising the duration of soil exposure to adverse weather
conditions and effectively turf, cover or stabilise any disturbed area without delay and prior
to rainfall occurring.
27. The developer must ensure sediment does not leave the site or enter onto adjoining
properties or Council’s drainage system due to surface runoff or on tyres of vehicles and/or
machinery. It is essential to implement appropriate approved erosion and sediment control
measures throughout the site during all phases of construction including vehicle shakedown
pad/grid (or similar) at the access to the construction site. Where sediments or other
contaminants are deposited on a road, they must be removed so as not to enter Council’s
drainage system or waterways.
28. Prior to the completion of the development and commencement of use, all site surfaces must
be effectively stabilised using methods which have achieved effective short-term stabilisation
and which will continue to achieve effective stabilisation in the medium to long-term. For the
purpose of this condition, an effectively stabilised surface is defined as one that does not, or
is not likely to result in visible evidence of soil loss caused by sheet, rill or gully erosion or
lead to sedimentation, or lead to water contamination.
Damage to Services and Assets
29. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets
must first be referred to the relevant service authority for approval.
5. REFERENCE DOCUMENTS
Not applicable.
6. REFFERRAL AGENCIES
Not applicable.
7. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form part
of the assessment manager conditions:
General Advisory Notes
1. Council has undertaken an audit check of the drawings in relations to the proposed works. A
detailed check of the calculations and drawings has not been undertaken. The RPEQ bears
full responsibility for all aspects of the engineering design. Council reserves the right to
require further amendments and/or additions at a later date should design errors become
apparent.
2. Should any changes or modifications to the approved plans be required as a result of
construction constraints, a “Request to change an existing approval” under the Planning Act
2016 must be made. Amended plans clearly indicating the changes must be lodged with this
application along with the appropriate fees.
Driveway
Page 5 of 8
Document Set ID: 23302434
Version: 3, Version Date: 22/10/2024
Page 6
3. Written approval may be required by Council to construct, modify or alter a crossover if the
proposed crossover is considered a non-standard. There is a fact sheet available to assist in
determining if your proposed vehicle crossover requirements are considered by Council as
standard or non-standard.
Refer to the General Information on the Construction and Maintenance of Vehicle Crossovers
on Council Controlled Land Factsheet at:
https://www.noosa.qld.gov.au/planningdevelopment/building-plumbing/fences-driveways
Erosion and Sediment Control
4. Accepted best practice standards include International Erosion Control Association
Australasia Best Practice Erosion and Sediment Control.
5. Qualified Person, for the purpose of erosion and sediment control is a Certified Professional
in Erosion and Sediment Control (CPESC) or suitably experienced Registered Professional
Engineer of Queensland (RPEQ).
External Colours and Finishes
6. Appropriate wall colours will depend on the existing native vegetation and backdrop, but may
include muted earth/environmental tones that blend with the natural environment, such as –
green, olive green, blue green, grey green, green blue, indigo, brown, blue grey, and green
yellow.
Retention of Existing Trees and Vegetation
7. All trees on neighbouring properties must be protected in accordance with AS 4970,
Protection of trees on development sites.
8. The plans for the proposed building work have NOT been assessed for compliance with the
requirements of the National Construction Code - Building Code of Australia (Volume 1) as
they relate to people with disabilities. Your attention is also directed to the fact that in addition
to the requirements of the National Construction Code as they relate to people with
disabilities, one or more of the following may impact on the proposed building work:
a. the Disability Discrimination Act 1992 (Commonwealth);
b. the Anti-Discrimination Act 1991 (Queensland); and
c. the Disability (Access to Premises – Buildings) Standards.
Resubmission of Amended Plans Required
9. The conditions of this Decision Notice require resubmission of plans to Council with
amendments. Please address the amended plan/s to Council’s Development Assessment
Branch with the Reference No. DBW24/0077.
Infrastructure Charges
10. All developments and/or changes to existing developments may require payment of
“Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution”
made pursuant to the planning legislation and regulations current at the time of issue. For
further information, please refer to https://www.noosa.qld.gov.au/planning-
development/development-tools-guidelines/infrastructure-charges.
8. PROPERTY NOTES
Not applicable.
9. VARIATION APPROVAL DETAILS
Not applicable.
Page 6 of 8
Document Set ID: 23302434
Version: 3, Version Date: 22/10/2024
Page 7
10. FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit Required Subject of the required Development Permit
Development Permit for Building Works All building work.
11. SUBMISSIONS
Not applicable.
12. RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Planning Act 2016 is attached.
During the appeal period, you as the applicant may suspend your appeal period and make written
representations to Council about the conditions contained within the development approval. If
Council agrees or agrees in part with the representations, a negotiated decision notice will be
issued. Only one negotiated decision notice may be given.
13. OTHER DETAILS
If you wish to obtain more information about the decision, electronic copies are available on line at
www.noosa.qld.gov.au or at Council Offices.
Your faithfully,
Matt Pinese
Development Planner
Enc: Appeal Rights
Approved Plans/Documents
Page 7 of 8
Document Set ID: 23302434
Version: 3, Version Date: 22/10/2024
Page 8
Appeal Rights
PLANNING ACT 2016 & PLANNING REGULATION 2017
Chapter 6 Dispute resolution (3) The appellant or, for an appeal to a tribunal, the registrar must,
within the service period, give a copy of the notice of appeal to –
Part 1 Appeal rights
(a) the respondent for the appeal; and
229 Appeals to tribunal or P&E Court
(b) each co-respondent for the appeal; and
(1) Schedule 1 of the Planning Act 2016 states –
(c) for an appeal about a development application under schedule
(a) Matters that may be appealed to –
1, table 1, item 1 – each principal submitter for the
(i) either a tribunal or the P&E Court; or development application; and
(ii) only a tribunal; or (d) for and appeal about a change application under schedule 1,
table 1, item 2 – each principal submitter for the change
(iii) only the P&E Court; and
application; and
(b) The person-
(e) each person who may elect to become a co-respondent for the
(i) who may appeal a matter (the appellant); and appeal, other than an eligible submitter who is not a principal
submitter in an appeal under paragraph (c) or (d); and
(ii) who is a respondent in an appeal of the matter; and
(f) for an appeal to the P&E Court – the chief executive; and
(iii) who is a co-respondent in an appeal of the matter; and
(g) for an appeal to a tribunal under another Act – any other
(iv) who may elect to be a co-respondent in an appeal of the
person who the registrar considers appropriate.
matter.
(4) The service period is –
(2) An appellant may start an appeal within the appeal period.
(a) if a submitter or advice agency started the appeal in the P&E
(3) The appeal period is –
Court – 2 business days after the appeal has started; or
(a) for an appeal by a building advisory agency – 10 business
(b) otherwise – 10 business days after the appeal is started.
days after a decision notice for the decision is given to the
agency; or (5) A notice of appeal given to a person who may elect to be a co-
respondent must state the effect of subsection (6).
(b) for an appeal against a deemed refusal – at any time after the
deemed refusal happens; or (6) A person elects to be a co-respondent by filing a notice of election,
in the approved form, within 10 business days after the notice of
(c) for an appeal against a decision of the Minister, under chapter
appeal is given to the person.
7, part 4, to register premises or to renew the registration of
premises – 20 business days after a notice us published under 231 Other appeals
section 269(3)(a) or (4); or
(1) Subject to this chapter, schedule 1 and the P&E Court Act, unless
(d) for an appeal against an infrastructure charges notice – 20 the Supreme Court decides a decision or other matter under this
business days after the infrastructure charges notice is given Act is affected by jurisdictional error, the decision or matter is non-
to the person; or appealable.
(e) for an appeal about a deemed approval of a development (2) The Judicial Review Act 1991, part 5 applies to the decision or
application for which a decision notice has not been given – matter to the extent it is affected by jurisdictional error.
30 business days after the applicant gives the deemed
(3) A person who, but for subsection (1) could have made an
approval notice to the assessment manager; or
application under the Judicial Review Act 1991 in relation to the
(f) for any other appeal – 20 business days after a notice of the decision or matter, may apply under part 4 of that Act for a
decision for the matter, including an enforcement notice, is statement of reasons in relation to the decision or matter.
given to the person.
(4) In this section –
Note – decision includes-
See the P&E Court Act for the court’s power to extend the appeal
(a) conduct engaged in for the purpose of making a decision; and
period.
(b) other conduct that relates to the making of a decision; and
(4) Each respondent and co-respondent for an appeal may be heard
in the appeal. (c) the making of a decision or failure to make a decision; and
(5) If an appeal is only about a referral agency’s response, the (d) a purported decision; and
assessment manager may apply to the tribunal or P&E Court to
(e) a deemed refusal.
withdraw from the appeal.
non-appealable, for a decision or matter, means the decision or
(6) To remove any doubt. It is declared that an appeal against an
matter-
infrastructure charges notice must not be about-
(a) is final and conclusive; and
(a) the adopted charge itself; or
(b) may not be challenged, appealed against, reviewed, quashed,
(b) for a decision about an offset or refund-
set aside or called into question in any other way under the
(i) the establishment cost of trunk infrastructure identified in Judicial Review Act 1991 or otherwise, whether by the
a LGIP; or Supreme Court, another court, a tribunal or another entity; and
(ii) the cost of infrastructure decided using the method (c) is not subject to any declaratory, injunctive or other order of
included in the local government’s charges resolution. the Supreme Court, another court, a tribunal or another entity
on any ground.
230 Notice of appeal
232 Rules of the P&E Court
(1) An appellant starts an appeal by lodging, with the registrar of the
tribunal or P&E Court, a notice of appeal that- (1) A person who is appealing to the P&E Court must comply with the
rules of the court that apply to the appeal.
(a) is in the approved form; and
(b) succinctly states the grounds of the appeal. (2) However, the P&E Court may hear and decide an appeal even if
the person has not complied with the rules of the P&E Court
(2) The notice of appeal must be accompanied by the required fee.
Page 8 of 8