Decision Notice - Approved by Delegation of Authority DBW24/0077 (As Published)
14. Site Access and Driveways
15. Driveway crossovers must be constructed in accordance with Council’s Standard Drawings
RS-049, RS-050 and any associated addendum.
16. Any existing unnecessary or redundant property accesses must be removed, and the kerb,
footpath and verge area reinstated to match the existing footpath and/or verge treatments.
Grassed verge areas to be reinstated must be provided with 100 mm topsoil and grass seed
or turf, and must be maintained by the developer until established.
Stormwater Drainage
17. Stormwater runoff from the development must be discharged to a lawful point of discharge
and/or disposed of on-site without causing scour or damage to the subject site or any
adjoining property.
18. Appropriate scour protection must be provided at the outlet of all stormwater pipes including
temporary outlets.
19. Works associated with this permit must not adversely impact on the existing drainage
conditions on other properties (e.g., by blocking or interfering with natural overland flows).
20. Construction of all internal stormwater drainage works must comply with the relevant
section/s of Australian Standard AS/NZS 3500.3.
Earthworks and Retaining Walls
21. All earthworks must include the installation and maintenance of appropriate erosion and
sediment control measures. Prescribed Water Contaminants (as defined in Schedule 10 of
Environmental Protection Regulation 2019) must not be released from the site or to waters
within the site, or be likely to be released should rainfall occur, unless all reasonable and
practicable measures are taken to prevent or minimise the release and concentration of
contamination.
22. Erosion and Sediment Control 20. Prescribed Water Contaminants (as defined in Schedule
10 of Environmental Protection Regulation 2019) must not be released from the site or to
waters within the site, or be likely to be released should rainfall occur, unless all reasonable
and practicable measures are taken to prevent or minimise the release and concentration of
contamination.
23. Sediment and erosion control measures must be in place prior to works commencing. If such
measures are not in place or are not satisfactory, “on the spot” fines may be issued. Such
fines can be issued if sediments from the site are found to enter or have the potential to enter
Council’s stormwater system, natural waterways, any downstream stormwater filtration
system or adversely impacting on other properties. The sediment and erosion control design
and measures have NOT been approved, it is the site's Supervising Engineer who is
responsible for ensuring that the sediment and erosion control measures have:
24. The erosion and sediment control measures must be designed, installed and maintained in
accordance with the supervising engineer instructions and the current best practice
standards * (Refer to Advisory Note).
a. Been duly designed by an RPEQ or CPESC and constructed in accordance with "best
practise" methods,
b. Been revised by an RPEQ or CPESC to address the issues raised by changes in the
projected construction schedule and/or methods,
c. Been revised to address predicted rainfall events, and
d. Achieve the desired environmental outcomes.
Council may request further controls to be installed should the implemented measures be
found inefficient.
Page 4 of 8
Document Set ID: 23302434
Version: 3, Version Date: 22/10/2024