Proposed Multiple Dwelling 51 Elanda Street, Sunshine Beach Civil Operational Works General Notes: 1. All dimensions shown are in meters unless otherwise shown. 2. All setout on site is the sole responsibility of the contractor. Contractor to allow for all means necessary to accurately set out the works. 3. All works to be constructed in accordance with project specifications and where and where further details are required the contractor shall refer to local council development guideline, local council specifications, local water authority guidelines and associated standard drawings. 4. Should any of the constructed works be constructed outside of the tolerances specified within the project specification and local authority requirements, the contractor will rectify at their cost including costs incurred by SCCE.(Design/Inspections/Lodgments). 5. Existing services have been plotted from supplied data and as such their accuracy cannot be guaranteed. No responsibility is taken by SCCE or the principal for the accuracy and completeness of this information. It is the responsibility of the contractor to accurately establish the location and level of all existing services prior to the commencement of any work. Any discrepancies shall be reported to superintended. Contractor to locate and protect services as required during proposed works. 6. The contractor is to check through locating, Potholing and survey all critical connection points for all civil works shown on the drawings including any potential existing services clashes prior to commencement of civil works. Contractor to immediately report any discrepancies to SCCE and await formal direction prior to commencing civil works. 7. On completion of services installation, all disturbed areas shall be restored to original level and functional condition including all disturbed surfaces, kerbs, footpaths, concrete areas, gravel areas, grassed areas, landscape areas and pavement. 8. Contractor shall be responsible for repair of any damage to authority/council's infrastructure. Such repair or reinstatement to be carried out immediately to the satisfaction of infrastructure owner/manager/authority/council. 9. Contractor to undertake all works in accordance with all workplace health and safety requirements. 10. Where any excavation or construction work are to be in close proximity to neighboring lot boundaries or infrastructure, contractor to allow in scope of works to provide all measures necessary to ensure the integrity of existing boundaries and infrastructure. This may include the use of low vibration equipment, trench sharing etc as required. 11. Prior to the contractor commencing any works detailed on these drawings, the contractor is to notify SCCE receive written confirmation that works can commence. 12. Contractor to provide as constructed drawings for all constructed works in accordance with local authority requirements including ADAC. 13. Contractor to undertake all works in accordance with relevant approvals. 14. Contractor to allow to liaise/co-ordinate with electrical, landscape and other service contractors throughout civil construction. 15. Contractor to organise all demolition permits prior to any demolition works commencing on site. 16. Contractor to allow to demolish all existing structures, roads and services within limit of works and remove from site u.n.o. 17. Contractor to undertake dilapidation report for adjoining properties and council roads and verger prior to commencement of any work on site. Inspection Requirements 18. Contractor to undertake past construction dilapidation report and council roads and verges at practical completion. The following inspections are required for engineering certification to be 19. Contractor to cleat and grub all vegetation on site as identified in the approved vegetation management plan. Contractor to ensure all tree issued. Contractor is to provide a minimum of 72 hours notice for roots and stumps are completely removed and backfilled to level 1 supervision, Contractor to allow to mulch all cleared vegetation and required inspections. Should the contractor fail to request an inspection, the contractor will be responsible for all costs to allow for the works stockpile on site or remove from site as directed. to be inspected. Any inspections that fail are to be re-inspected with all 20. Drawings to be read in conjunction with the following consultants/contractors drawings: reinspection costs to be paid by the contractor. 1. Prestart a. Surveyor - Bennett and Bennett 2. Earthworks - final stripping of topsoil, installation of sediment and erosion control measures. b. Electrical - tbc 3. Unsuitable ground c. Communications - tbc 4. Stormwater pipe laid on bedding prior to backfill 5. Stormwater trench backfilled prior to pavement placement. d. Landscape - tbc 6. Stormwater structure base slabs 21. Contractor to prepare and have approved by relevant: road opening permit and traffic management plan for all works within council road 7. Pavement subgrade 8. Pavement reinforcing reserves. Contractor to allow for all costs associated with implementation of the Traffic Management Plan. 9. Pavement prior to sealing (preseal) 10. Practical completion 22. No works are to be undertaken on land outside of the site boundary without formal approval by the owner/custodian of that land including 11. On maintenance but not limited to private property, road reserve, parks/open space, easements. 12. Off maintenance 13. Any other inspection as specified by local authorities (refer 23. The contractor shall have an approved set of constructions drawings and approvals on site at all times. development approval) 24. Contractor to install information signage in accordance with local authority standards prior to commencement of works. 25. Contractor to prepare construction management plan in accordance with local authority requirements and have approved by local authority where required. 26. Proprietary items shall be installed in accordance with the manufacturer's specifications u.n.o. REV: DESCRIPTION: DATE DRAFT CHECKED APPROVED APPROVED BY: CLIENT: PROJECT: DRAWING TITLE: 13469 PROJECT NUMBER: A3 ORIGINAL Signed: SIZE Sunshine Coast Civil Engineers Copyright in the drawings, information and data recorded in this document is the property of Sunshine Coast Civil Engineers Pty Ltd. This document and DRAWING NUMBER: REVISION: the information are solely for the use of the authorized recipient and this document may not be used, copied, or reproduced in whole or in part for any Date: 23/11/24 www.sunshinecoastcivilengineers.com purpose than that for which it was supplied by Sunshine Coast Civil Engineers Pty Ltd. This document shall only be used for construction if stamped and approved for construction.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 16 pages
Page 2
S
S
S
S
S
S
43
.5
44.
44.5
0
S
45.0
S S S
45.5
SW SW
46.0
46.5
47.0
E
47.5
E
48.0
E
48.5
W
49.0
E
W
E
Meters
4 0 4 8
1:250
REV: DESCRIPTION: DATE DRAFT CHECKED APPROVED APPROVED BY: CLIENT: PROJECT: DRAWING TITLE:
13469
PROJECT NUMBER: A3 ORIGINAL
Signed: SIZE
Sunshine Coast Civil Engineers Copyright in the drawings, information and data recorded in this document is the property of Sunshine Coast Civil Engineers Pty Ltd. This document and
DRAWING NUMBER: REVISION:
the information are solely for the use of the authorized recipient and this document may not be used, copied, or reproduced in whole or in part for any
Date: 23/11/24 www.sunshinecoastcivilengineers.com purpose than that for which it was supplied by Sunshine Coast Civil Engineers Pty Ltd. This document shall only be used for construction if stamped and
approved for construction.
Page 3
SW SW
Meters
3 0 3 6
1:200
REV: DESCRIPTION: DATE DRAFT CHECKED APPROVED APPROVED BY: CLIENT: PROJECT: DRAWING TITLE:
13469
PROJECT NUMBER: A3 ORIGINAL
Signed: SIZE
Sunshine Coast Civil Engineers Copyright in the drawings, information and data recorded in this document is the property of Sunshine Coast Civil Engineers Pty Ltd. This document and
DRAWING NUMBER: REVISION:
the information are solely for the use of the authorized recipient and this document may not be used, copied, or reproduced in whole or in part for any
Date: 23/11/24 www.sunshinecoastcivilengineers.com purpose than that for which it was supplied by Sunshine Coast Civil Engineers Pty Ltd. This document shall only be used for construction if stamped and
approved for construction.
Page 4
General: Kerb inlet the imminent rainfall and run-off.
1. Refer drg no. C101, which is to be requested and viewed prior to commencement of15.construction
For kerb inlet standard detail and specification refer to international erosion control association
c. All reasonable and practicable steps have been taken to treat the water within
if not supplied. Australasia (IECA) best practices standard drawing esc-03 kerb inlet sediment traps.
best-practice time frames;
Check dams d. Flocculent has been appropriately applied and the concentration of TSS in the captur
Sediment control
2. All erosion and sediment control measures to be in accordance with international 16. For control
erosion water has already significantly decreased.
check dam standard detail and specification refer to international erosion control association
association (IECA) Australia guidelines and the specifications. Australasia (IECA) best practices standard drawing rcd-01 check dams.
3. Erosion and sediment control details shown are minimum requirements. It is the contractors 27. For all other stormwater releases, flows and discharges from the site, the release limit
responsibility to install additional control measures as deemed necessary throughout
construction. Revegetation prescribed in (1a) above must not be exceeded unless the development is in full complian
4. 17. order
The contractor is responsible to maintain all sediment control devices in a functional For revegetation
and this standard.
standard specification refers to international erosion control association
Australasia (IECA) best practices standard drawing R-01 revegetation general.
replace all blocked sediment devices as required until successful off maintenance of works.
5. Construction of all sediment management devices to the satisfaction of the superintendent. Shall 28. It is recommended that a site-specific relationship between turbidity and suspended solid
be completed and effective prior to: determined for each sediment basin. Once a correlation between suspended solids and tu
a. Stripping of topsoil and grass. Field inlet has been established for a sediment basin, testing stormwater for compliance with relea
limits, prior to release, can be done on site with a turbidity tube or calibrated turbidity
18. For field inlet standard detail and specification refer to international erosion control association
b. Bulk earthworks to the site. This has the advantage of providing immediate assessment to justify a release rather t
Australasia (IECA) best practices standard drawing ESC-02 grated stormwater (field) inlet
c. Services installation. sediment trap. waiting for laboratory results to confirm concentration levels and compliance. Note that
post-release TSS validation is appropriate to demonstrate that the NTU/TSS correlatio
d. Pavement construction. being maintained.
6.
Operation and maintenance
All sediment management measures are to remain in place until instruction is received in writing
from the superintendent to remove all or part of the silt control applications. 19. In accordance with council esc guidelines, all esc measures shall be inspected: 29. Background refers to receiving water quality immediately upstream of the site location r
7. The bulk earthworks and sediment control layout plan shall be read in conjunction20.withAttheleast daily (when work is occurring on site) or weekly (when work is not Occurring point at the time of release. Where there is no immediate upstream receiving water at t
on site)
approved drawings. location and time of release, then the turbidity release limit (NTU) will be equal to the
21. Within 24 hours of expected rain; and limit for 50mg/l total suspended solids (TSS) based upon the onsite correlation between
8. Prior to commencement of construction approval is to be obtained from the superintendent
22. Within for
18 hours of a rainfall event (i.e. An event of sufficient intensity and Duration to
andmobilise
NTU.
the location of the site access point and wash down area which are to be maintained throughout
sediment on site).
the construction period.
9. If erosion and sediment control devices have been found to be different or failed in service,
Contractor
corrective action is to be undertaken immediately which may include amendments' additions
original approved erosion control plans. Such amendments are to be approved by superintendent,
to the Update Requirements
if deemed necessary and relevant. 23. Civil contractor is to provide an updated program of ESC maintenance and control of all stages
of work for approval by the superintendent.
Overall
10. Temporary drainage control flow should be diverted around the work site where possible.
Sediment release guidelines:
11. All drainage, erosion and sediment controls to be installed and be operational before commencing
up-slope earthworks. 24. All releases of stormwater captured onsite, unless otherwise noted in this standard, must not
exceed the following limits:
12. In areas where runoff turbidity is to be controlled, exposed surfaces to be either mulched,
covered with erosion control blankets or turfed if earthworks are expected to be delayed for of total suspended solids (TSS) as a maximum concentration;
a. 50mg/l
more than 14 days.
b. Turbidity (NTU) value less than 10% above background;
Sediment fence c. Ph value must be in the range 6.5 to 8.5 except where, and to the extent that, the natural
13. For sediment fence standard detail and specification refer to international erosion controlreceiving waters lie outside this range.
association Australasia (IECA) best practices standard drawings sf-01 and sf-02 sediment fence.
Temporary construction entry/exit 26. The concentration of TSS released by dewatering may only exceed 50mg/l where it can be
demonstrated and supported through documentation that:
14. For construction entry / exit standard detail and specification refer to international erosion
a. Further significant rainfall is forecast to occur before the TSS concentration is likely to be
control association Australasia (IECA) best practices standard drawings exit-01 and exit-02
reduced
construction exit - rock pad (construction sites only), exit-03 - rock pads for building sites and to 50mg/l;
exit-04 and exit-05 construction exit - vibration grid. b. Releasing a higher concentration of total suspended solids will result in a better
environmental outcome by providing storage for the capture and treatment of run-off from
REV: DESCRIPTION: DATE DRAFT CHECKED APPROVED APPROVED BY: CLIENT: PROJECT: DRAWING TITLE:
13469
PROJECT NUMBER: A3 ORIGINAL
Signed: SIZE
Sunshine Coast Civil Engineers Copyright in the drawings, information and data recorded in this document is the property of Sunshine Coast Civil Engineers Pty Ltd. This document and
DRAWING NUMBER: REVISION:
the information are solely for the use of the authorized recipient and this document may not be used, copied, or reproduced in whole or in part for any
Date: 23/11/24 www.sunshinecoastcivilengineers.com purpose than that for which it was supplied by Sunshine Coast Civil Engineers Pty Ltd. This document shall only be used for construction if stamped and
approved for construction.
Page 5
RUNOFF FROM PAD
PROVIDE SAND BAGS ACROSS FLOW PATH.
DIRECTED TO SEDIMENT
PROVIDE TURF AROUND SAND BAGS, TO A
TRAP.
MINIMUM OF 1m IN FRONT AND 2m BEHIND.
NT
ME EXTENT TO BE DETERMINED ON SITE BY
LI GN SUPERINTENDENT.
15 T YA
MINM ER
OP
PR
BERM (300MM MIN HEIGHT)
NOM
200
2m
min
.
GEOTEXTILE
FABRIC, BIDIM A34
OR SIMILAR 3 MIN N TURFED AREA
M ME 1m
B ITU min
E OF .
E DG
SILT FENCE ON BACK OF DIR
KERB SANDBAGS ECT
ION
UNBOUND PAVEMENT OF
MATERIAL (GRAVEL), FLO
W
EXCLUDE MATERIAL FINER
THAN AS SIEVE 2.36mm NOTE:
EXTENT AND SETOUT OF CHECK DAMS TO BE
TEMPORARY CONSTRUCTION ENTRY/EXIT PROPOSED ON SITE BY CONTRACTOR TO THE
SATISFACTION OF THE SUPERINTENDENT
NTS
SAND BAG CHECK
Ø100 SLOTTED PIPE
WRAPPED IN GEO-FABRIC DAM
SOCK NTS
PROVIDE WEIGHT TO CENTER
OF PIPE TO AVOID FIX TO TOP OF STAKE
FLOATATION WITH SHADECLOTH
INLET GRATE TO BE FASTENER OR TIE TO
WRAPPED IN FILTER FABRIC STEEL PICKET.
AND SECURED
GEOTEXTILE
FABRIC AND SL42
50x50 HW STAKE OR STEEL
GULLY PIT SEDIMENT BARRIER OVERLAND FL
OW
PICKET 1200 MIN LONG
NTS
200
INLET GRATE TO BE
WRAPPED IN FILTER
BACKFILL
FABRIC AND
SECURED
SEDIMENT FENCE
- ALTERNATIVE 1
FIELD INLET SEDIMENT NTS
BARRIER 3000 MAX. (WITHOUT
NTS SL42 FABRIC, 2000 MAX C)
FIX TO TOP OF STAKE
WITH SHADECLOTH
FASTENER OR TIE TO
STEEL PICKET.
SL42 FABRIC TO AS 1304 GEOTEXTILE
FABRIC AND SL42 50x50 HW STAKE OR STEEL
PICKET 1200 MIN LONG
DISTURBED AREA OVERLAND FL
DIR OW
E 300
CT MIN
IONO
NOM
150
FF
LO
W
GEOTEXTILE FABRIC
CRUSHED OR GRANULAR
POSTS OR STEEL PICKETS MATERIAL, GRADING TO
DRIVEN 600MM INTO TABLE 4 OF QT
GROUND SPECIFICATION MRS11.03.
600 MAX
100 MIN HORIZONTAL
OVERLAP OF FABRIC
DIRECTION
OF FLOW UNDISTURBED AREA
SEDIMENT
BACKFILL
FENCE -
ALTERNATIVE 2
200
SEDIMENT FENCE NTS
HEADWALL INLET SEDIMENT PROTECTION DETAIL
NTS
REV: DESCRIPTION: DATE DRAFT CHECKED APPROVED APPROVED BY: CLIENT: PROJECT: DRAWING TITLE:
13469
PROJECT NUMBER: A3 ORIGINAL
Signed: SIZE
Sunshine Coast Civil Engineers Copyright in the drawings, information and data recorded in this document is the property of Sunshine Coast Civil Engineers Pty Ltd. This document and
DRAWING NUMBER: REVISION:
the information are solely for the use of the authorized recipient and this document may not be used, copied, or reproduced in whole or in part for any
Date: 23/11/24 www.sunshinecoastcivilengineers.com purpose than that for which it was supplied by Sunshine Coast Civil Engineers Pty Ltd. This document shall only be used for construction if stamped and
approved for construction.
Page 6
REV: DESCRIPTION: DATE DRAFT CHECKED APPROVED APPROVED BY: CLIENT: PROJECT: DRAWING TITLE:
13469
PROJECT NUMBER: A3 ORIGINAL
Signed: SIZE
Sunshine Coast Civil Engineers Copyright in the drawings, information and data recorded in this document is the property of Sunshine Coast Civil Engineers Pty Ltd. This document and
DRAWING NUMBER: REVISION:
the information are solely for the use of the authorized recipient and this document may not be used, copied, or reproduced in whole or in part for any
Date: 23/11/24 www.sunshinecoastcivilengineers.com purpose than that for which it was supplied by Sunshine Coast Civil Engineers Pty Ltd. This document shall only be used for construction if stamped and
approved for construction.
Page 7
2 3
4
05
05
C2
43.5
44.0
44.
5
04
05
C2
5
03 4
C2
0
1
02 4
C2
0
8
7
Meters
4 0 4 8
6
01 4
C2
0
1:250
49.5
REV: DESCRIPTION: DATE DRAFT CHECKED APPROVED APPROVED BY: CLIENT: PROJECT: DRAWING TITLE:
13469
PROJECT NUMBER: A3 ORIGINAL
Signed: SIZE
Sunshine Coast Civil Engineers Copyright in the drawings, information and data recorded in this document is the property of Sunshine Coast Civil Engineers Pty Ltd. This document and
DRAWING NUMBER: REVISION:
the information are solely for the use of the authorized recipient and this document may not be used, copied, or reproduced in whole or in part for any
Date: 23/11/24 www.sunshinecoastcivilengineers.com purpose than that for which it was supplied by Sunshine Coast Civil Engineers Pty Ltd. This document shall only be used for construction if stamped and
approved for construction.
Page 8
50 50 50 50
49 49 49 49
48 48 48 48
47 47 47 47
46 46 46 46
45 45 45 45 50 50
44 44 44 44 48 48
43 43 43 43 46 46
42 42 42 42 44 44
41 41 41 41 42 42
40 40 40 40 40 40
44.511
45.484
45.048
44.812
47.254
47.303
47.313
47.981
49.082
47.827
NGL
NGL
NGL
DESIGN
DESIGN
DESIGN
44.721
44.959
44.960
44.938
46.303
48.600
48.600
49.581
49.551
49.178
BASEMENT
BASEMENT
BASEMENT
43.062
43.062
43.062
43.062
43.062
43.062
43.062
43.062
REV: DESCRIPTION: DATE DRAFT CHECKED APPROVED APPROVED BY: CLIENT: PROJECT: DRAWING TITLE:
13469
PROJECT NUMBER: A3 ORIGINAL
Signed: SIZE
Sunshine Coast Civil Engineers Copyright in the drawings, information and data recorded in this document is the property of Sunshine Coast Civil Engineers Pty Ltd. This document and
DRAWING NUMBER: REVISION:
the information are solely for the use of the authorized recipient and this document may not be used, copied, or reproduced in whole or in part for any
Date: 23/11/24 www.sunshinecoastcivilengineers.com purpose than that for which it was supplied by Sunshine Coast Civil Engineers Pty Ltd. This document shall only be used for construction if stamped and
approved for construction.
Page 9
50 50
48 48
46 46
44 44
42 42
45.011
49.784
47.900
47.615
47.477
47.313
46.942
46.628
43.583
NGL
DESIGN
49.861
49.591
48.566
48.488
48.600
48.600
48.600
44.950
43.538
BASEMENT
43.062
43.062
43.062
43.062
43.062
43.062
50 50
49 49
48 48
47 47
46 46
45 45
44 44
43 43
42 42
45.941
49.800
47.600
47.485
47.363
47.239
46.839
45.124
43.695
NGL
DESIGN
49.861
47.371
49.550
48.616
46.125
48.600
48.600
44.963
43.633
BASEMENT
43.062
43.062
43.062
43.062
43.062
43.062
43.062
REV: DESCRIPTION: DATE DRAFT CHECKED APPROVED APPROVED BY: CLIENT: PROJECT: DRAWING TITLE:
13469
PROJECT NUMBER: A3 ORIGINAL
Signed: SIZE
Sunshine Coast Civil Engineers Copyright in the drawings, information and data recorded in this document is the property of Sunshine Coast Civil Engineers Pty Ltd. This document and
DRAWING NUMBER: REVISION:
the information are solely for the use of the authorized recipient and this document may not be used, copied, or reproduced in whole or in part for any
Date: 23/11/24 www.sunshinecoastcivilengineers.com purpose than that for which it was supplied by Sunshine Coast Civil Engineers Pty Ltd. This document shall only be used for construction if stamped and
approved for construction.
Page 10
POINT TABLE POINT TABLE
POINT Y X LEVEL POINT Y X LEVEL
1 241.366 -5.303 49.769 28 224.701 -13.448 48.446
2 240.187 -6.219 49.956 29 224.688 -12.873 48.544
3 238.996 -7.146 49.994 30 224.606 -12.372 48.631
4 236.162 -9.349 50.083 31 224.456 -11.873 48.716
5 234.172 -11.027 49.953 32 224.181 -11.243 48.839
6 232.185 -12.708 49.822 33 222.732 -9.200 48.887
9 228.833 -15.647 49.325 35 221.685 -7.542 49.254
10 227.990 -16.395 49.125 36 223.514 -6.260 49.526
16
15 17 11 226.795 -17.458 48.725 37 225.808 -4.559 49.348
14 18
19 12 225.001 -19.053 48.125 38 227.421 -6.764 49.537
13
20 13 223.207 -20.648 47.525 40 228.723 -9.200 49.705
12
21
11 14 221.414 -22.242 46.925 41 230.808 -7.217 49.838
10 22
9 24 23 15 219.620 -23.837 46.325 42 232.750 -5.301 49.962
25
26
27 16 218.666 -24.685 46.006 43 235.934 -3.193 49.993
28
6 29
30 17 217.622 -23.513 45.974 44 237.152 -2.317 49.956
31
5 32
18 216.578 -22.341 45.942 45 237.995 -0.957 49.768
4 40 33
19 217.729 -21.333 46.325 46 239.834 -3.327 49.769
41 35
3
38 20 219.523 -19.738 46.925
2 36
1 42
37 21 221.309 -18.134 47.525
46 43
44 22 223.095 -16.530 48.125
45 23 223.393 -16.262 48.225
24 223.786 -15.826 48.001
25 224.170 -15.261 48.118
26 224.489 -14.569 48.249
27 224.634 -14.015 48.348
Meters
4 0 4 8
1:250
REV: DESCRIPTION: DATE DRAFT CHECKED APPROVED APPROVED BY: CLIENT: PROJECT: DRAWING TITLE:
13469
PROJECT NUMBER: A3 ORIGINAL
Signed: SIZE
Sunshine Coast Civil Engineers Copyright in the drawings, information and data recorded in this document is the property of Sunshine Coast Civil Engineers Pty Ltd. This document and
DRAWING NUMBER: REVISION:
the information are solely for the use of the authorized recipient and this document may not be used, copied, or reproduced in whole or in part for any
Date: 23/11/24 www.sunshinecoastcivilengineers.com purpose than that for which it was supplied by Sunshine Coast Civil Engineers Pty Ltd. This document shall only be used for construction if stamped and
approved for construction.
Page 11
Meters
3 0 3 6
1:200
REV: DESCRIPTION: DATE DRAFT CHECKED APPROVED APPROVED BY: CLIENT: PROJECT: DRAWING TITLE:
13469
PROJECT NUMBER: A3 ORIGINAL
Signed: SIZE
Sunshine Coast Civil Engineers Copyright in the drawings, information and data recorded in this document is the property of Sunshine Coast Civil Engineers Pty Ltd. This document and
DRAWING NUMBER: REVISION:
the information are solely for the use of the authorized recipient and this document may not be used, copied, or reproduced in whole or in part for any
Date: 23/11/24 www.sunshinecoastcivilengineers.com purpose than that for which it was supplied by Sunshine Coast Civil Engineers Pty Ltd. This document shall only be used for construction if stamped and
approved for construction.
Page 12
Discharge to
landscaping
over rubble pit
REV: DESCRIPTION: DATE DRAFT CHECKED APPROVED APPROVED BY: CLIENT: PROJECT: DRAWING TITLE:
13469
PROJECT NUMBER: A3 ORIGINAL
Signed: SIZE
Sunshine Coast Civil Engineers Copyright in the drawings, information and data recorded in this document is the property of Sunshine Coast Civil Engineers Pty Ltd. This document and
DRAWING NUMBER: REVISION:
the information are solely for the use of the authorized recipient and this document may not be used, copied, or reproduced in whole or in part for any
Date: 23/11/24 www.sunshinecoastcivilengineers.com purpose than that for which it was supplied by Sunshine Coast Civil Engineers Pty Ltd. This document shall only be used for construction if stamped and
approved for construction.
Page 13
SW
REV: DESCRIPTION: DATE DRAFT CHECKED APPROVED APPROVED BY: CLIENT: PROJECT: DRAWING TITLE:
13469
PROJECT NUMBER: A3 ORIGINAL
Signed: SIZE
Sunshine Coast Civil Engineers Copyright in the drawings, information and data recorded in this document is the property of Sunshine Coast Civil Engineers Pty Ltd. This document and
DRAWING NUMBER: REVISION:
the information are solely for the use of the authorized recipient and this document may not be used, copied, or reproduced in whole or in part for any
Date: 23/11/24 www.sunshinecoastcivilengineers.com purpose than that for which it was supplied by Sunshine Coast Civil Engineers Pty Ltd. This document shall only be used for construction if stamped and
approved for construction.
Page 14
43
.5
44.0
44.
45.0
5
45.5
46.0
46.5
47.0
Water Supply Network Works
47.5
Water Supply Code of Australia, South East
Queensland Service Providers Edition Version 1.3 (August 2019), Part 2: Construction and Design
Part 3:
48.0
Drawings
Water Supply Code of Australia, South
East Queensland Service Providers Edition Version 1.3 (August 2019), Part 2: Construction
Part 3: Drawings
48.5
W South East
Queensland Code Accepted Civil Infrastructure Products and Material List,
49.0
W
Meters
4 0 4 8
1:250
REV: DESCRIPTION: DATE DRAFT CHECKED APPROVED APPROVED BY: CLIENT: PROJECT: DRAWING TITLE:
13469
PROJECT NUMBER: A3 ORIGINAL
Signed: SIZE
Sunshine Coast Civil Engineers Copyright in the drawings, information and data recorded in this document is the property of Sunshine Coast Civil Engineers Pty Ltd. This document and
DRAWING NUMBER: REVISION:
the information are solely for the use of the authorized recipient and this document may not be used, copied, or reproduced in whole or in part for any
Date: 23/11/24 www.sunshinecoastcivilengineers.com purpose than that for which it was supplied by Sunshine Coast Civil Engineers Pty Ltd. This document shall only be used for construction if stamped and
approved for construction.
Page 15
“ ”
REV: DESCRIPTION: DATE DRAFT CHECKED APPROVED APPROVED BY: CLIENT: PROJECT: DRAWING TITLE:
13469
PROJECT NUMBER: A3 ORIGINAL
Signed: SIZE
Sunshine Coast Civil Engineers Copyright in the drawings, information and data recorded in this document is the property of Sunshine Coast Civil Engineers Pty Ltd. This document and
DRAWING NUMBER: REVISION:
the information are solely for the use of the authorized recipient and this document may not be used, copied, or reproduced in whole or in part for any
Date: 23/11/24 www.sunshinecoastcivilengineers.com approvedthan
purpose that for which it was supplied by Sunshine Coast Civil Engineers Pty Ltd. This document shall only be used for construction if stamped and
for construction.
Page 16
S
S
S
S
S
S
44.
44.
0
S
45.0
5
S S S
45.5
46.0
46.5
47.0
Gravity Sewerage Network Works
47.5
48.0
48.5
49.0
Meters
4 0 4 8
1:250
REV: DESCRIPTION: DATE DRAFT CHECKED APPROVED APPROVED BY: CLIENT: PROJECT: DRAWING TITLE:
13469
PROJECT NUMBER: A3 ORIGINAL
Signed: SIZE
Sunshine Coast Civil Engineers Copyright in the drawings, information and data recorded in this document is the property of Sunshine Coast Civil Engineers Pty Ltd. This document and
DRAWING NUMBER: REVISION:
the information are solely for the use of the authorized recipient and this document may not be used, copied, or reproduced in whole or in part for any
Date: 23/11/24 www.sunshinecoastcivilengineers.com purpose than that for which it was supplied by Sunshine Coast Civil Engineers Pty Ltd. This document shall only be used for construction if stamped and
approved for construction.
Page 17
REV: DESCRIPTION: DATE DRAFT CHECKED APPROVED APPROVED BY: CLIENT: PROJECT: DRAWING TITLE:
13469
PROJECT NUMBER: A3 ORIGINAL
Signed: SIZE
Sunshine Coast Civil Engineers Copyright in the drawings, information and data recorded in this document is the property of Sunshine Coast Civil Engineers Pty Ltd. This document and
DRAWING NUMBER: REVISION:
the information are solely for the use of the authorized recipient and this document may not be used, copied, or reproduced in whole or in part for any
Date: 23/11/24 www.sunshinecoastcivilengineers.com approvedthan
purpose that for which it was supplied by Sunshine Coast Civil Engineers Pty Ltd. This document shall only be used for construction if stamped and
for construction.
Used in these records
Engineering Plans.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.