Council archive · source document
Attachment 5 - Traffic Impact Assessment Final PTT · 132005.638.06
Site No. Week 1-2 Surveyed Wed 19 Mar 25 to Tue 01 Apr 25 Job# 21953
Location Eumundi Noosa Road Outside no 561 (10kmh)
Date Total Avg Two ways Suburb Doonan Direction Two ways
# 6 0 1 2 3 4 DirTwoWay!C13
Time AUSTROADS vehicle classification Mean 85th percentile Maximum Motor
Total
(hour starting) 1 2 3 4 5 6 7 8 9 10 11 12 13 Speed (kph) Speed (kph) Speed (kph) Cycle Bicycle
24 Hour Volumes &
1354 922 15 328 56 16 0 13 2 0 0 0 0 2 16.4 23.6 54.4 19 70
Average Speeds
% of vehicles by class 100% 68% 1% 24% 4% 1% 0% 1% 0% 0% 0% 0% 0% 0% 1.4% 5.2%
Copyright Austraffic, 1983-2016 (DatXL 3.1.35; 2.46) Page 4 of 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 5 - Traffic Impact Assessment Final PTT.pdfRelated documentApplication case desk ↗
About this file
- File size
- 9.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.