Attachment 5 - Traffic Impact Assessment Final PTT · 132005.638.06
Figures 2.2 and 2.3 demonstrate that:
— Tuesday is the busiest weekday and typically peaks between 11:00am and 12:00pm
— Sunday is the busiest weekend day and typically peaks between 11:15am and 12:15pm
Table 2.3 summarises the Tuesday and Sunday peak hour demand volumes and other key
operational attributes of the site access. The raw survey data is attached in Appendix B. Based
on these data the average vehicle length has been calculated using the design vehicle lengths
provided in the Austroads Design Vehicles and Turning Path Templates Guide (2023)
Table 2.3: INTERSECTION ATTRIBUTES – PEAK HOUR
ATTRIBUTE TUESDAY PEAK HOUR SUNDAY PEAK HOUR
Peak Hour 11:00am to 12:00pm 11:15am to 12:15pm
Total Volume (vph) 189 180
— Eastbound (In) 93 87
— Westbound (Out) 96 93
% Heavy Vehicles 30% 29%
Average Vehicle Length 6.7m 6.2m
The weighbridge data, summarised in Table 2.2, represents a month of activity at the site. For
comparison, the tube count data has been converted to represent a monthly volume, as follows:
— eastbound (in): 19,450 vehicles per month
— westbound (out): 19,580 vehicles per month
— total volume: 39,030 vehicles per month
2.5.3 Intersection Turning Movement Data
To assist in the quantification of existing road network operations proximate to the site, turning
movement surveys were conducted at the Eumundi Noosa Road / Site Access priority-controlled
intersection. Surveys were undertaken from 10:00am to 2:00pm on Tuesday, 12 May 2026, and
on Sunday, 10 May 2026, to capture the peak hours identified in Table 2.3.
Table 2.4 summarises the existing demand volumes and other key operational attributes of the
intersection. The raw survey data is attached in Appendix B.
Table 2.4: INTERSECTION ATTRIBUTES
ATTRIBUTE TUESDAY PEAK HOUR SUNDAY PEAK HOUR
Peak Hour 11:30pm to 12:30pm 11:00am to 12:00pm
Total Volume (vph) 1,020 1,120
% Heavy Vehicles 8.6% 0.6%
Peak Flow Factor 95.4% 93.7%
Access Volume (vph) 156 110
— In 84 58
— Out 72 52
% Heavy Vehicles (Access) 16.1% 4.5%
P:\2025-26\26-369 NOOSA RESOURCE RECOVERY CENTRE\OUTPUTS\26-369 TRAFFIC IMPACT ASSESSMENT FINAL.DOCX 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 5 - Traffic Impact Assessment Final PTT.pdfRelated documentApplication case desk ↗
About this file
- File size
- 9.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.