Council archive · source document
Attachment 5 - Traffic Impact Assessment Final PTT · 132005.638.06
Site No. Week 3 Surveyed Tue 08 Apr 25 to Mon 14 Apr 25 Job# 21953
Location Eumundi Noosa Road Outside no 561 (10kmh)
Date Total Avg Two ways Suburb Doonan Direction Two ways
# 0 1 2 3 4 5 DirTwoWay!C13
Time AUSTROADS vehicle classification Mean 85th percentile Maximum Motor
Total
(hour starting) 1 2 3 4 5 6 7 8 9 10 11 12 13 Speed (kph) Speed (kph) Speed (kph) Cycle Bicycle
24 Hour Volumes &
1387 944 16 357 37 12 1 13 1 2 0 0 0 3 16.6 23.3 41.8 20 54
Average Speeds
% of vehicles by class 100% 68% 1% 26% 3% 1% 0% 1% 0% 0% 0% 0% 0% 0% 1.5% 3.9%
Copyright Austraffic, 1983-2016 (DatXL 3.1.35; 2.46) Page 4 of 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 5 - Traffic Impact Assessment Final PTT.pdfRelated documentApplication case desk ↗
About this file
- File size
- 9.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.