Attachment 5 - Traffic Impact Assessment Final PTT · 132005.638.06
MOVEMENT SUMMARY
Site: 101 [2038 Tues Post Dev (Site Folder: Post Dev)]
New Site
Site Category: (None)
Give-Way (Two-Way)
Vehicle Movement Performance
Mov Turn INPUT DEMAND Deg. Aver. Level of 95% BACK OF Prop. Effective Aver. Aver.
ID VOLUMES FLOWS Satn Delay Service QUEUE Que Stop No. Speed
[ Total HV ] [ Total HV ] [ Veh. Dist ] Rate Cycles
veh/h % veh/h % v/c sec veh m km/h
South: Eumundi Noosa Road
2 T1 553 7.9 580 7.9 0.314 0.1 LOS A 0.0 0.0 0.00 0.00 0.00 59.8
3 R2 43 6.3 45 6.3 0.070 9.7 LOS A 0.3 1.9 0.58 0.80 0.58 49.9
Approach 596 7.8 625 7.8 0.314 0.8 NA 0.3 1.9 0.04 0.06 0.04 59.0
East: Site Access
4 L2 118 23.1 124 23.1 0.218 10.7 LOS B 0.8 6.6 0.60 0.84 0.62 49.2
Approach 118 23.1 124 23.1 0.218 10.7 LOS B 0.8 6.6 0.60 0.84 0.62 49.2
North: Eumundi Noosa Road
7 L2 72 22.6 75 22.6 0.047 5.8 LOS A 0.0 0.0 0.00 0.57 0.00 52.7
8 T1 575 6.5 603 6.5 0.322 0.1 LOS A 0.0 0.0 0.00 0.00 0.00 59.8
Approach 647 8.3 678 8.3 0.322 0.7 NA 0.0 0.0 0.00 0.06 0.00 58.9
All 1361 9.4 1427 9.4 0.322 1.6 NA 0.8 6.6 0.07 0.13 0.07 57.9
Vehicles
Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Site tab).
Vehicle movement LOS values are based on average delay per movement.
Minor Road Approach LOS values are based on average delay for all vehicle movements.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is
not a good LOS measure due to zero delays associated with major road movements.
Delay Model: SIDRA Standard (Geometric Delay is included).
Queue Model: SIDRA Standard.
Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
SIDRA INTERSECTION 9.0 | Copyright © 2000-2020 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: PEKOL TRAFFIC AND TRANSPORT | Licence: NETWORK / 1PC | Processed: Monday, 31 August 2026 1:39:09 PM
Project: P:\2025-26\26-369 Noosa Resource Recovery Centre\Calcs\SIDRA\26-369 Eumundi Noosa Road - NRRF Access.sip9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 5 - Traffic Impact Assessment Final PTT.pdfRelated documentApplication case desk ↗
About this file
- File size
- 9.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.