Skip to the record
The first. The best. The only NoosaWatch™.

Council archive · source document

Attachment 5 - Traffic Impact Assessment Final PTT · 132005.638.06

of 161

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                                                                                                                                                                                                                                                                                                                  IT IS THE RESPONSIBILITY OF THE
                                                                                                                                                                                                                                                                                                                              CONTRACTOR TO CONTACT THE RELEVANT
                                                                                                                                                                                                                                                                                                                             AUTHORITIES TO CONFIRM THE LOCATION OF
                                                                                                                                                                                                                                                                                                                                ALL EXISTING SERVICES PRIOR TO THE
                                                                                                                                                                                                                                                                                                                                  COMMENCEMENT OF EXCAVATION

                                                                                                          BUILDING                                                               HES B
                                                                                                                                                                                        ASIN
                                                                                                                                                                                                                                                                              CONCRETE CRUSHING AREA WITH
                                                                                                                                                                                                                                                                                   C&D SORTING AREA

                                                                                                                CLEANAWAY
                                                                                                                  DEPOT                                                  GRAV
                                                                                                                                                                              E
                                                                                                                                                                        CLEA L HARDST
                                                                                                                                                                            NAWA          AND
                                                                                                                                                                          PARK Y VEHICL ,
                                                                                                                                                                                ING A       E                                          SCRAP METAL
                                                                                                                                                                                      REA
                           SITE ENTRANCE                                                                                                                                                                                              STOCKPILE AREA
                                                                                                                                          RCBC CROSSING       ACCOUNT CUSTOMER
                                                                                                                                 REVIVA                       WEIGHBRIDGE (WB2)
                                                                                                        BUILDING
                                                                                                                                 CENTRE




                                                                                                                                                                                                                 UP




                                                                                                                             TRANSFER
                                                                                                                             STATION                                                  COMPOST FACILITY AREA
                                                                                            WEIGHBRIDGE                      BUILDING
                                                                                               (W1B)
                                                                                                                                                                                                                                                                                                                LANDFILL
                                                                                                                                                                                                                                                                                                                 CELL 3.1



                                                                                                                                                                                                                        ACCESS ROAD
                                              EUMUNDI-NOOSA ROAD




                                                                                                         BUILDING




                                                                                                                                                      LEACHATE TANK FARM
                                                                                                                                                         TANK STORAGE



                                                                                                                                                                                                                                                                                                                                                               LANDFILL
                                                                                                                                                                                                                                                                                                                                                               CELL 3.2




                                                                                                                                                                                                                                                                                     LANDFILL


                                                                                                                                                                                                                                                                                                                                   SCALE 1:1000 (A1) - 1:2000 (A3)

                                                                                                                                                                                                                                                                                                                             Check all dimensions before commencement of work.
                                                                                                                                                                                                                                                                                                                             Check Site boundary dimensions from the Title plans
                                                                                                                                                                                                                                                                                                                             Check Building Boundary clearances by set out.
                                                                                                                                                                                                                                                                                                                             Notwithstanding the information supplied on this drawing,
                                                                                                                                                                                                                                                                                                                             the location, depth and extent of underground or overhead
                                                                                                                                                                                                                                                                                                                             services are to be confirmed and protected on site by the
                                                                                                                                                                                                                                                                                                                             contractor prior to commencement of works.

                                                                                                                                                   Approved
Checked -    CJT                                                                                                                                                                                      Drawing title -                                  Project -   DOONAN RESOURCE              Site -                      Project No.     244035       Sheet No.               C1002
Design -    CJT        Drawn -    KR
                                                                                                                                                                                                      SITE MASTER PLAN                                             RECOVERY REDEVELOPMENT       561 EUMUNDI-NOOSA ROAD,     Digital Ref :   C1000 COMPLETE SITE PLAN   Issue :      A
Scales -    AS SHOWN                                                                                                                               COVEY ASSOCIATES PTY LTD   124 DUPORTH AVENUE                                                       Client -
                                                                                                                                                                                                                                                                   NOOSA SHIRE COUNCIL          DOONAN                       This Document is copyright and shall not be copied
                                                                   A   21.09.2026   PRELIMINARY ISSUE                  LMc
                                                                                                                                                   ABN 59 137 305 992         PO BOX 16                                                                                                                                      without written approval, nor shall it be used except
Document Stage -       PRELIMINARY                                                                                                                 (07) 5443 7777             MAROOCHYDORE QLD 4558                                                                                                                          for the Development and the Site Specified.
                                                                   Issue Date                     Description         By                           [email protected]
       C:\12dS\data\12DSERVER\244035_3605\Design (Covey)\Drawings - Concept Design\Uncontrolled\C1000 COMPLETE SITE PLAN.dwg                                                                                                                                                                                                Plot 21 September 2026 - 4:30 PM

Used in these records

About this file

File size
9.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 5 - Traffic Impact Assessment Final PTT.pdf · 9.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.