Council archive · source document
Attachment 5 - Traffic Impact Assessment Final PTT · 132005.638.06
AUSTROADS / DTMR
TURN WARRANT ASSESSMENT TOOL
Version 0.1: 10 Feb 2023
Job Number: 26-369 Input Turning Volumes (vph):
Date: 7/9/26
Initials: RL Tues Sun Tues Sun
466 551
Assessment Year: 2028 41 37 477 553
Scenario: Post Dev 68 65
Design Domain: NDD
Design Speed: 90
Lane Count: 2L2W
Splitter Island: No
Design Vols Left Turn Right Turn
(vph): QM QL QM QR
AM: 477 68 1011 41
PM: 553 65 1169 37
Treatment AUL CHR
NDD - 70km/h < Design Speed < 100km/h
120
100
CHR
AUL / CHL
80
CHR(s)
QL / QR (vph)
AUL(s)
60
BAR
BAL
40
20
0
0 200 400 600 800 1000 1200
QM (vph)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 5 - Traffic Impact Assessment Final PTT.pdfRelated documentApplication case desk ↗
About this file
- File size
- 9.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.