3.0 PROPOSED DEVELOPMENT
3.1 PROPOSAL
3.1.1 Site Layout
The proposal comprises a new compost facility and two weighbridges. The new weighbridges
would be located to the north of the proposed compost facility and would include one inbound
and one outbound weighbridge. The existing weighbridge would be retained and would facilitate
inbound traffic only (ie a total of three weighbridges). The proposed layout is shown in Figure
3.1, with the full masterplan layout attached in Appendix E.
As discussed in Section 2.1, currently, approximately 17,000 tonnes of green waste is received
per annum. Council has advised that the proposed composting facility has been designed with
a capacity of 25,000 tonnes per annum, with the flexibility to increase to 30,000 tonnes per
annum within the existing infrastructure. For this assessment, the ultimate capacity (ie 30,000
tonnes) has been considered. The proposed expansion would be supported by an additional five
full-time staff.
Figure 3.1: PROPOSED SITE LAYOUT
3.1.2 Green Waste Processing
Currently, the NRRC processes green waste into mulch. As discussed in Section 2.5.1,
approximately 20% of green waste mass is lost in the process (ie a yield of 80%). Losses typically
occur from moisture evaporation and the removal of contaminants.
P:\2025-26\26-369 NOOSA RESOURCE RECOVERY CENTRE\OUTPUTS\26-369 TRAFFIC IMPACT ASSESSMENT FINAL.DOCX 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 5 - Traffic Impact Assessment Final PTT.pdfRelated documentApplication case desk ↗
About this file
- File size
- 9.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.