Council archive · source document
Attachment 5 - Traffic Impact Assessment Final PTT · 132005.638.06
Options that will improve efficiency and streamlining of facility operations to improve the attractiveness of the
NRRF to both commercial sources and residents are evaluated in Section 3 with a view to optimising
diversion from landfill and maximising participation in recycling and circular economy at the NRRF. In
support of implementation of this masterplan design, potential staging of this work to maintain operational
waste facilities during construction and estimate of probable project costs including detailed design and
capital construction costs have been developed in Section 5.
Project number 526384 File Noosa Masterplanning Report 2025-02-07 Revision 0 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 5 - Traffic Impact Assessment Final PTT.pdfRelated documentApplication case desk ↗
About this file
- File size
- 9.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.