Table 3        Traffic streams not requiring weighbridge

 Vehicles disposing of free-of-charge items                                         Empty vehicles                  Operational and
                                                                                    leaving site                    other vehicles
 ◼   E-waste              ◼   Domestic               ◼    Cardboard/paper           ◼    WMC landfill               ◼    Vehicles
 ◼   Paint                    batteries              ◼    Domestic                       vehicles, green                 accessing
                          ◼   Lead-acid                   chemicals                      waste vehicles                  Reviva, NSC
 ◼   White goods                                                                                                         offices, WMC
     (degassed                batteries (e.g.,       ◼    Domestic                  ◼    Vehicles from
                              car batteries)                                             RRA1 after                      Offices, the Ed
     fridges, washing                                     polystyrene                                                    Shed
     machines, dryers,    ◼   Scrap metals                                               material drop off
                                                     ◼    Empty gas                                                 ◼    Deliveries to site
     dishwashers)         ◼   Comingled                   bottles                   ◼    Vehicles exiting
 ◼   Motor oil                recycling                                                  Transfer Station


Weighbridge locations have been selected based on site layout, as part of the Masterplanning process. The
anticipated weighbridge passes are provided in Table 4. Through the provision of multiple weighbridges, the
pressure on the current single weighbridge is alleviated, where possible all streams not requiring
weighbridge pass have been allocated a bypass, please refer to the Design Decisions Register (refer
Appendix B). The anticipated passes are based on data provided by NSC for November 2023, a
conservative sensitivity estimate is provided for 120% of the passes, limited seasonal or monthly variation
advised by NSC.
Table 4        Weighbridge Location and Expected Vehicle Passes

 Weighbridge      Location               Direction       Vehicles                                                    Number of
 Number                                                                                                              vehicles per month
                                                                                                                     100%           120%
 1                At existing Reviva     Incoming        Vehicles to Transfer Bays                                   4934           5921
                  Building                               Vehicles to Bulk Tipping Floor
 2                Before proposed        Incoming        Vehicles to RRA1 for Green Waste,                           7552           9062
                  culvert crossing to                    Concrete, Steel and Clean Fill
                  RRA1
 3                Before proposed        Outgoing        Sales vehicles                                              879            1055
                  culvert crossing to                    Vehicles carrying recoverables from smalls
                  RRA1                                   Vehicles carrying recoverables from RRA1
 Weighbridge      N/A                    N/A             Internal movements, vehicles to landfill,                   3034           3641
 passes                                                  deliveries, vehicles to free of charge area.
 eliminated

Currently, there are a significant number of internal movements that pass over the weighbridge from RRA1
to another location in RRA1 and from RRA1 to the landfill. The waste materials moved include steel, treated
timber, landfill, and clean fill. Steel is the sole of these streams not taken to landfill. There is not an
associated cost payable to NSC for these movements, or purpose to weighing these movements, such as
quantity tracking or otherwise. Hence, this traffic has mostly been removed from the weighbridge passing
volume. At the time of preparing this report, the WMC services contract was not available for review of
services required, hence it is not known if there are service payments for WMC associated with internal
movement of waste. In terms of NSC waste charges, all waste to transfer stations and RRA1 areas are
weighed upon entry to site and there are no further applicable payments for this waste. Materials removed
from site for offsite processing and as part of the sales operation (compost and crushed concrete) are
weighed at the outgoing weighbridge at the northern section of site (WB3).
Landfill waste from RRA1 to the landfill constitute the majority of internal movements for weighbridge passes,
required for the purposes of regulatory reporting of landfill waste quantities. Landfill cover material including
incorporated treated timber does not contribute to regulatory waste reporting, and internal movement of this
waste to landfill has been removed from weighbridge passes internally. Where NSC cannot confirm treated
timber (rather than untreated timber) inclusion to landfill cover material, this waste stream is also landfilled, in
this case vehicles transporting treated timber will be required to pass over a weighbridge for regulatory
reporting of quantity of landfilled waste. Similarly, clean fill received on site and transported to the landfill for
inclusion to cover materials, has not been considered to require internal weighing and vehicle movements
have been removed from weighbridge streams.


                                                               Project number 526384 File Noosa Masterplanning Report 2025-02-07 Revision 0   6

Used in these records

About this file

File size
9.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 5 - Traffic Impact Assessment Final PTT.pdf · 9.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.