3.5.2        Masterplan design considerations
Timber stockpile and crushing area in RRA1 is maintained in the current location, with expansion due to
proximity to site won spoil for day cover and access to the landfill minimising interaction with other waste
areas in RRA1. The timber operation employs contractor shredding, with no required fixed plant. This is of
priority as the timber processing areas are located in areas of Future Landfill Cell 3.1 and 3.2, which can be
reclaimed by NSC in future where these cells are to be opened for landfilling operations. There is currently
poor sorting of treated and untreated timber undertaken by the public at transfer station bays and no sorting
currently undertaken by NSC or WMC. The arrangement of the timber area will include the following areas:
Table 17     Areas for timber sorting and processing within RRA1

 Area                         Description
 Unsorted/ poorly sorted      Area for the stockpiling of timber received at transfer that is unsorted or poorly sorted.
 Timber Stockpile             Loads of timber that have been confirmed by NSC as sufficiently sorted could bypass
                              this stockpile and sorting and be diverted straight to treated timber or untreated timber
                              stockpiles.
 Untreated Timber Stockpile   Stockpile for timber that is sorted and identified as untreated, less area required as
                              there is less untreated timber within the waste stream.
 Treated Timber Stockpile     Stockpile for timber that is sorted and identified as treated, majority of timber is treated,
                              or cannot be determined (assumed treated), this area is larger.
 Area for shredding or        Area typically cleared hardstand to be used for placement of shredding plant during
 mixing shredded timber       timber shredding, or area for mixing shredded timber with spoil material for use as
 with cover material          landfill day cover.
 Shredded Untreated           Stockpile area for shredded untreated timber for transfer to composting area and
 Timber Stockpile             inclusion to compost feedstock.
 Shredded Timber Stockpile    Stockpile area for shredded treated timber for mixing with site won spoil and use as day
                              cover on the landfill




                                                          Project number 526384 File Noosa Masterplanning Report 2025-02-07 Revision 0   27

Used in these records

About this file

File size
9.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 5 - Traffic Impact Assessment Final PTT.pdf · 9.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.