Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

Attachment 5 - Traffic Impact Assessment Final PTT · 132005.638.06

of 161

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Figure 15    Example cardboard compactor with 30m3 compaction chamber




Figure 16    Images of the waste initiatives baler from schematic drawing and chamber placement



3.7          Northern Operational Area

3.7.1        Current operation
Currently, the northern operational area is occupied by WMC, other than a newly placed modular building for
the NSC projects team, and used for the following purposes:
◼   LV carparking for WMC and NSC projects team
◼   Vehicle washdown (vehicle washbay with oily water separator)
◼   WMC vehicle maintenance
◼   WMC bin storage areas
◼   Park-up of compactor trucks, 24 spaces required
◼   WMC offices and amenities
The office buildings include a combination of older standalone buildings and fixed modular buildings, which
are ageing and of reduced layout optimisation.




                                                      Project number 526384 File Noosa Masterplanning Report 2025-02-07 Revision 0   31

Used in these records

About this file

File size
9.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 5 - Traffic Impact Assessment Final PTT.pdf · 9.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.