Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

Attachment 5 - Traffic Impact Assessment Final PTT · 132005.638.06

of 161

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                                                                                                                                                                                                                                                                                                                                                                                   LEGEND
                                                                                                                                                                                                                                                                                                                                                                                                               Bank - Top Right
                                                                                                                                          Proposed HES




                                                                                                                                                                                                             Forebay
                                                                                                                                          Basin (Type B)                                                                                                                                                                                                                                                       Bank - Top Left

                                                                                                                                                                                                                                                                                                                                                                                                               Machinery footprint
                                                                                                                                                                                                                               Cleanaway                                                                                                                                                                       Composting process operational
                                                                                                                                                                                                                                                                                                                                                                                                               area boundary
                                                                                                                                                                                                                             Collected Green
                                                                                                                                                                                                                                                                                                                                                                                                               Aeration pipes - Heaps system
                                                                                                                                                                                                                                  Waste                                                                                                                                                                        Pile section
                                                                                                                                                                                                                                                                                                                                                                                                               Control panel
                                                                                                                                                                                                                                                                                                                                                                                                               Fan
                                                                                                                                                                                                                                                                                                                                                                                                               Water tank
                                                                                                                                                                                                                                                                                                                                                                                                               Wall
                                                                                                                                                                                                                                                                                                                                                                                                               Solar Panels


                                                                                                                 Bioretention
                                                                                                                 Basin Surface                    Public Drop-off
                                                                                                                                                   Green Waste
                                                                                     Joins sheet 1,2 & 3




                                                                                                                                   Crushed                                          Concrete
                                                                                                                                   Concrete                                       Crushing Area
                                                                                                                                    20mm                                                                                                                                                                                                                                         A
                                                                                                                                                                                                                                                                                                                                                                                 -




                                                                                                                                   Crushed
                                                                                                                                   Concrete
                                                                                                                                    40mm
                                                                                                                                                                                                                                                   Mature
                                                                                                                                                                                                                                                  Compost
                                                                                                                                                                                        Concrete                                                  Stockpile
                                                                                                                                                                                       drop-off and
                                                                                                                                    Crushed                                              stockpile
Plot Date: 2025-02-06 10:20 AM Filename: 524971-W00001-SKT-RO-0002(REV1)OPT4.DWG




                                                                                                                                    Concrete
                                                                                                                                     80mm
                                                                                                                                                                                                                                                                                                                                                                                              NOTES
                                                                                                                                                                                                                                                                                                                                                                                              1.   Each pile has 4 pipes each, and is 6m wide
                                                                                                                                                                                                                                                                                                                                                                                              2.   It is estimated that 4 piles per week will be filled with
                                                                                                                                  Compost for                                                                                                                                                                                                                                                      shredded green waste.
                                                                                                                                                                                                                                                                                                                                                                                              3.   Each pile has a separate aeration fan, two heaps
                                                                                                                                   sale with                                                                                                                                                                                                                                                       control panels are required to operate the 72 piles.
                                                                                                                                 Bagging plant                                                                                                                     Steel                                                                                                                      4.   5,000KL Slimline tanks are positioned near control
                                                                                                                                                                                                                                                                 Stockpile                                                                                                                         panels, between compost arrays, these are tied into
                                                                                                                                                                               Concrete                                                                                                                                                                                                            future pond local to composting area by NSC.
                                                                                                                                                                                 slurry                                                                                                                                                                                                       5.   Areas 1 to 6 have a minimum 2% fall northwest to
                                                                                                                                                                                                                                                                                                                                                                                                   indicative pond location.
                                                                                                                                                                                capture                                                                                                                                                                                                       6.   Composting process operational area has a minimum
                                                                                                                                                                                                                                                                                                                                                                                                   2% fall toward indicative pond location, north.
                                                                                                                                                                                                                                                                                                                                                                                              7.   Earthen safety bund, to half the height of the largest
                                                                                                                                                                                                                                                                                                                                                      DETAIL     A                                 operational vehicle operating in the area.
                                                                                                                                                                                                                                                                                                                                                      1:200      -



                                                                                   REFERENCE DRAWINGS                                            REFERENCE MODELS                                                                                                                                                                      All written dimensions   CONSTRUCTION STATUS                                 PROJECT
                                                                                                                                                                                                                                                                                                1:500
                                                                                                                                                                                                                                                                                                        5   0         10        20 m
                                                                                                                                                                                                                                                                                                                                       take precedence over       NOT FOR                            FEASIBILITY STUDY
                                                                                                                                                                                                                                                                                                                                         scaled dimensions.
                                                                                                                                                                                                                                                                                                                                                                CONSTRUCTION                   OF A COMPOST SITE FOR NOOSA
                                                                                                                                                                                                            PREPARED BY                                       CLIENT                                                                                                                                                  TITLE
                                                                                                                                                                                                                                                                                                                                       Coordinate system               DRAWN BY
                                                                                                                                                                                                                                                                                                                                       MGA                              EDITH R.              DETAIL AREA 5 - CONCEPT LAYOUT
                                                                                                                                                                                                                                                                                                                                       Height datum                   DESIGNED BY            BASIN AREA,CONCRETE AREAS, PIPES
                                                                                                                                                                                                                                                                                                                                       AHD                              GRACE T.            ARRANGEMENT & PILE DETAIL - SHEET 5
                                                                                   REV           DATE       REVISION DETAILS                     REV   DRAWN        DESIGNED      VERIFIED     APPROVED
                                                                                                                                                                                                                                                                                                                                                                   STATUS            CODE                     DOCUMENT CODE
                                                                                    5            06/02/25   INITIAL DRAFT                         5    E. RIVERA                 G. TRIPCONY    D. McLEAN
                                                                                                                                                                                                                                                                                                                                                                 SUITABLE FOR
                                                                                                                                                                                                                                                                                                                                                                STAGE APPROVAL        S4       524971 - W00002 - SKT - EN - 0006
                                                                                                                                                                                                                                                                                                                           PRINT ALL COPIES                          DOCUMENT STATE          SCALE           SIZE          REFERENCE No.                REV
                                                                                                                                                                                                             CERTIFICATION   No.      CERTIFIER       DATE             CLIENT DOCUMENT NUMBER                   REV        IN COLOUR                            WORK IN PROGRESS            AS SHOWN          A1            CN-524971                     5

Used in these records

About this file

File size
9.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 5 - Traffic Impact Assessment Final PTT.pdf · 9.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.