Council archive · source document
Attachment 5 - Traffic Impact Assessment Final PTT · 132005.638.06
Appendix C
Transfer Station Access Duration
Table D.1 Vehicle transfer bay access times used in number of bay selection
Bay type Vehicle type Frequency Time to unload Sum (minutes) Weighted average
(minutes) (minutes)
Small Bays Vehicle Type A 967 5 9670 11.06
Vehicle Type E 1814 10 36280
Vehicle Type J 116 15 2320
Vehicle Type H 526 25 15780
Trailer Bays Vehicle Type B 592 10 11840 12.79
Vehicle Type F 746 15 14920
Bulk Tipping Vehicle Type G 57 35 2280 26.37
Floor
Vehicle Type L 2 25 80
Vehicle Type M 9 10 135
Vehicle Type N 0 10 0
Vehicle Type K 16 5 80
Project number 526384 File Noosa Masterplanning Report 2025-02-07 Revision 0
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 5 - Traffic Impact Assessment Final PTT.pdfRelated documentApplication case desk ↗
About this file
- File size
- 9.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.