2.3      SURROUNDING AREA
         The subject site is bounded to the north by Noosa Hills Golf Course, to the south by Emu
         Mountain Road, to the east by Walter Hay Drive and to the west by Eumundi Noosa Road.

         The surrounding area consists primarily of Environmental Management uses.

2.4      SURROUNDING ROAD NETWORK
         Key attributes of the surrounding road network are summarised in Table 2.1.

         Table 2.1:            ROAD NETWORK ATTRIBUTES
                                      EUMUNDI NOOSA                      EMU MOUNTAIN                       WALTER HAY
           ATTRIBUTE
                                          ROAD                               ROAD                             DRIVE
           Road Hierarchy                       Arterial                          Arterial                      Arterial
                                      Undivided with one lane           Undivided with one lane           Undivided with one
           Cross-Section
                                           per direction                     per direction                 lane per direction
           Jurisdiction                           TMR                               TMR                         Council
           Speed Limit (km/h)                      80                                80                           80
                                          Environmental                     Environmental                   Environmental
           Predominant Land
                                         Management and                    Management and                  Management and
           Use
                                        Community Facilities              Community Facilities            Community Facilities

         Emu Mountain Road intersects Eumundi Noosa Road and Walter Hay Drive at the south-west
         and south-east corners of the site, respectively, as roundabouts, as shown in Figure 1.1.

2.5      TRAFFIC DATA

         2.5.1        Weighbridge Data
         A review of the Noosa Resource Recovery Facility Efficiency Optimisation and Masterplan report
         prepared by Aurecon (dated 7 February 2025) has been undertaken (attached in Appendix A).
         A month’s worth of weighbridge data for November 2023 was used to inform the proposed
         master plan layout. Since the raw weighbridge data is not available for this traffic impact
         assessment, the Aurecon report has been used to understand existing weighbridge operations.
         The key data used for this report are summarised below:

         —         typical weighbridge service times of 20 to 30 seconds per vehicle
         —         the number of weighbridge passes, summarised in Table 2.2
         —         the quantity and type of waste, summarised in Table 2.2

         Table 2.2:            WEIGHBRIDGE DATA FOR NOVEMBER 2023
                                                   QUANTITY OF                                                   QUANTITY OF
                              WEIGHBRIDGE                                                     WEIGHBRIDGE
           INBOUND                                    WASTE             OUTBOUND                                    WASTE
                              PASSES (VEH)                                                    PASSES (VEH)
                                                    (TONNES)                                                      (TONNES)
           Green Waste             4,356                2,960           Mulch Sales                 492                2,347

           Other Waste            10,753                9,803           Other                       276                1,118
           Total                  15,109                12,763          Total                       768                3,465




 P:\2025-26\26-369 NOOSA RESOURCE RECOVERY CENTRE\OUTPUTS\26-369 TRAFFIC IMPACT ASSESSMENT FINAL.DOCX                           3

Used in these records

About this file

File size
9.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 5 - Traffic Impact Assessment Final PTT.pdf · 9.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.