Skip to the record
Every meeting, every word.

Council archive · source document

Attachment 5 - Traffic Impact Assessment Final PTT · 132005.638.06

of 161

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Appendix I
Free of Charge Volumes
Free-of-charge waste quantity, skip numbers, and area size required for Masterplan design.
Table I.1     Area and collection information for free-of-charge streams, eastern aisle

 Free-of-         Requirements                                  Value                                   Units
 charge areas
 stream
 E-waste          Monthly movements                             4                                       trucks
                  Weekly movements                              1                                       trucks
                  Monthly vol                                   10.45                                   m3
                  Weekly vol                                    2.6125                                  m3
                  120%                                          3.135                                   m3
                  Need 1 x empty crate 3m3 and 1 x being filled
                  Capacity required                             3.135                                   m3
                  1 x 3.5m3 crate full and 1 x 3.5m3 crate being filled
 RVM              Monthly movements                             5                                       trucks
                  Weekly movements                              1.25                                    trucks
                  Monthly vol                                   98                                      m3
                  Weekly vol                                    24.5                                    m3
                  120%                                          29.4                                    m3
                  The RVM vending machines output to wheeled 1m3 sulo skips
                  Capacity required                             23.52                                   m3
                  24 x 1m3 sulo skips required + 4 being filled
 Co-mingled       Monthly movements                             9                                       trucks
 recycling
                  Weekly movements                              2.25                                    trucks
                  Monthly vol                                   170                                     m3
                  Weekly vol                                    42.5                                    m3
                  120%                                          51                                      m3
                  Capacity required                             22.66666667                             m3
                                                                7.555555556                             3m3 skips
                  10 skips required, 8 x full and 2 x being filled
 Mattresses       Space allowance only:
                   - pallets for public placement
                   - Area for vertical placement behind
                  There is no data on movements or weight of these.
                  King mattress 1.83m x 2.03m




                                                           Project number 526384 File Noosa Masterplanning Report 2025-02-07 Revision 0

Used in these records

About this file

File size
9.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 5 - Traffic Impact Assessment Final PTT.pdf · 9.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.