Council archive · source document
Attachment 5 - Traffic Impact Assessment Final PTT · 132005.638.06
Appendix I
Free of Charge Volumes
Free-of-charge waste quantity, skip numbers, and area size required for Masterplan design.
Table I.1 Area and collection information for free-of-charge streams, eastern aisle
Free-of- Requirements Value Units
charge areas
stream
E-waste Monthly movements 4 trucks
Weekly movements 1 trucks
Monthly vol 10.45 m3
Weekly vol 2.6125 m3
120% 3.135 m3
Need 1 x empty crate 3m3 and 1 x being filled
Capacity required 3.135 m3
1 x 3.5m3 crate full and 1 x 3.5m3 crate being filled
RVM Monthly movements 5 trucks
Weekly movements 1.25 trucks
Monthly vol 98 m3
Weekly vol 24.5 m3
120% 29.4 m3
The RVM vending machines output to wheeled 1m3 sulo skips
Capacity required 23.52 m3
24 x 1m3 sulo skips required + 4 being filled
Co-mingled Monthly movements 9 trucks
recycling
Weekly movements 2.25 trucks
Monthly vol 170 m3
Weekly vol 42.5 m3
120% 51 m3
Capacity required 22.66666667 m3
7.555555556 3m3 skips
10 skips required, 8 x full and 2 x being filled
Mattresses Space allowance only:
- pallets for public placement
- Area for vertical placement behind
There is no data on movements or weight of these.
King mattress 1.83m x 2.03m
Project number 526384 File Noosa Masterplanning Report 2025-02-07 Revision 0
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 5 - Traffic Impact Assessment Final PTT.pdfRelated documentApplication case desk ↗
About this file
- File size
- 9.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.