Skip to the record
Every meeting, every word.

Original source · versioned page text

TIA - Application decision - s62A (PA) - Approval_1

Attached to the e-mail SARA response with conditions - MCU25/0090 and OPW25/0136.

of 12

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

       a) starts to have effect when the development approval has effect; and
       b) stops having effect if the development approval lapses or is cancelled; and
       c) replaces any earlier decision made under section 62(1) in relation to the land.

2. In accordance with section 485 of the TIA and section 31 of the Transport Planning and
   Coordination Act 1994 (TPCA), a person whose interests are affected by this decision may
   apply for a review of this decision only within 28 days after notice of the decision was given
   under the TIA. A copy of the review provisions under TIA and TPCA are attached in
   Attachment C for information.

3. In accordance with section 485B of the TIA and section 35 of TPCA a person may appeal
   against a reviewed decision. The person must have applied to have the decision reviewed
   before an appeal about the decision can be lodged in the Planning and Environment Court. A
   copy of the Appeal Provisions under TIA and TPCA is attached in Attachment C for information.

Further approvals
The Department of Transport and Main Roads also provides the following information in relation to
this approval:

1. Road Access Works Approval Required – Written approval is required from the department to
   carry out road works that are road access works (including driveways) on a state-controlled road
   in accordance with section 33 of the TIA. This approval must be obtained prior to commencing
   any works on the state-controlled road. The approval process may require the approval of
   engineering designs of the proposed works, certified by a Registered Professional Engineer of
   Queensland (RPEQ). Please contact the department to make an application.

2. General advice:
      a) It is to note that the presence of the "keep clear" does not give vehicles from the
         proposed development site any priority when exiting or entering the property. The keep
         clear markings are not a stop line. Vehicles travelling on the road are not required to give
         way to vehicles entering or exiting the property. The Department note that th “Keep
         Clear” line markin is to assist in the service requirements of the Fire Brigade (opposite
         the subject site)

If further information about this approval or any other related query is required, the North Coast
Region Corridor Management Team should be contacted by email at
[email protected] or on (07) 5451 7055.

Yours sincerely




Kirsty Simmonds
A/Senior Town Planner




                                                                                              Page 3 of 12
Log in to download the original file

TIA - Application decision - s62A (PA) - Approval_1.pdf · 359 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.