Original source · versioned page text
Appendix B - Amended Biome Consulting Response
Attached to the e-mail Amended Biome Report - stormwater in addition to Information Response - MCU170551 - 20 Trading Post Road Cooroy.msg.
The original of this document is very large (16.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
CALIBRE CONSULTING
Existing Scenario Layout
Developed Mitigated Scenario Layout
[OCR of page images]
CALIBRE CONSULTING
Existing Scenario Layout
Al
Oe
OUT
B1 B2 B3 B4 D2
O- O o=
C1 C2 G 1
O..—_
Developed Mitigated Scenario Layout
Al A2 /
Oar BasinA
in O—g = A OUT
$+.
OO B4 / ink1
in D2 D_OUT
link28 lin!
C1 C3 de2
} - SthBasin node: .
© link23 Tal oO Tink ink27 ink2
link4 >
\ ink26 3
D1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.