Appendix B - Amended Biome Consulting Response
Attached to the e-mail Amended Biome Report - stormwater in addition to Information Response - MCU170551 - 20 Trading Post Road Cooroy.msg.
The original of this document is very large (16.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Multi‐Pipe Outlet
Sizing of the scour rock protection for the proposed multiple pipe outlet was determined using
calculations specified in Section 10.4.15 of QUDM, 2013. Below indicates rock protection
requirements and the adopted outlet rock protection configuration at each pipe outlet.
Central Basin Overflows
Location
(2 x 1050)
Catchments B1, B2
Q (m3/s) 1.5
Area (m2) 1.7
Outlet Velocity (m/s) 0.87
Diameter (m) 1.05
No of Cells 2
Equivalent Diameter (m) 1.45
Multiplication Factor for Multiple Cells N/A
Length Ratio D:L 3
Width (m) 1.45
Length (m) 4.35
d50 (mm) 200
Thickness of Rock Protection (mm) 400
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.