Appendix B - Amended Biome Consulting Response

Attached to the e-mail Amended Biome Report - stormwater in addition to Information Response - MCU170551 - 20 Trading Post Road Cooroy.msg.

of 100

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (16.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Central Bioretention Basin
Critical Section
CROSS SECTION DETAILS                                                                10% AEP                            1% AEP
     POINT       CH                          Z             n                  wA       wP         n x wA        wA        wP      n x wA




                   1           ‐16.2         100.95     0.060
                   2           ‐16.2         100.35     0.060
                   3             ‐15         100.05     0.060             0.04            0.57     0.00        0.05      0.66      0.00
                   4              15         100.05     0.060             4.14            30.00    0.25        4.79      30.00     0.29
                   5            18.6         100.95     0.060             0.04            0.57     0.00        0.05      0.66      0.00




                                                                          wA       wP     n x wA     wA       wP     n x wA
                                                      TOTAL            4.216176 31.13798 0.252971 4.886761 31.31527 0.293206
                               S
                             0.005                                         R                n       Q            R         n        Q
                                                                       0.135403           0.060    1.31       0.15605    0.060     1.67
                                                             Flow                          1.31                           1.67

                                                            WSL                      100.188                            100.210

                       Calculated by Manning's Equation                                   1.31                           1.67
                                               Vel (m/s)                                  0.31                           0.34

                                                                    Basin Section
                                                                101

                                                               100.9

                                                               100.8

                                                               100.7
  Height (m AHD)




                                                               100.6

                                                               100.5

                                                               100.4

                                                               100.3

                                                               100.2

                                                               100.1

                                                                100
      -20              -15             -10            -5                  0               5        10           15         20        25
                                                                              Width (m)

                                                      Existing Sur face             10 % AEP        1% A EP




As indicated in results above velocities are less than 0.5m/s during the minor and major storm
events. This is also within the requirements for the major storm (less than 2m/s). However, scour or
damage of vegetation is unlikely as the results do not take into account the backflow effect caused
by the outlet pit and weir which will reduce velocities through the basin. Therefore the design of the
basin is appropriate to cater for inflow velocity.
Log in to download the original file

Appendix B - Amended Biome Consulting Response.PDF · 16.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.