Skip to the record
Accept no imitations.

Original source · versioned page text

Appendix B - Amended Biome Consulting Response

Attached to the e-mail Amended Biome Report - stormwater in addition to Information Response - MCU170551 - 20 Trading Post Road Cooroy.msg.

of 100

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (16.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

                                                                                                                                  VERSION:          A
                                                                                                                                  DATE : 22.02.18




STORMWATER MANAGEMENT DESIGN DRAWINGS
                 Proposed Resort Development
                 20 Trading Post Road, Cooroy
                                    for
                    Palm Lake Resort

                      Project No: BC-17152
                            February 2018


                                                                            SCHEDULE OF DRAWINGS
                                                              Drawing No.                               Drawing Title
                                                                 DWG-100     LOCALITY AND DRAWING INDEX PLAN
                                                                 DWG-210     MUSIC CATCHMENT PLAN

                                                                 DWG-310     BASIN D3 LAYOUT AND CROSS SECTION
                                                                 DWG-320     BASIN D3 - INLET AND OUTLET DETAILS
                                                                 DWG-330     BASIN D3 - FILTER MEDIUM AND UNDERDRAINAGE DETAILS




                           BIOME Consulting Pty Ltd
                     Unit 30201, Southport Central Tower 3,
                       9 Lawson St, Southport QLD 4215
                     PO Box 3469, Australia Fair, Southport
 Site Location                  O 07 5532 7779
                                M 0415 935 222
                       E [email protected]
                       W www.BIOMEconsulting.com.au
                              ABN 86 166 087 476
Log in to download the original file

Appendix B - Amended Biome Consulting Response.PDF · 16.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.