Original source · versioned page text
Appendix B - Amended Biome Consulting Response
Attached to the e-mail Amended Biome Report - stormwater in addition to Information Response - MCU170551 - 20 Trading Post Road Cooroy.msg.
The original of this document is very large (16.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
VERSION: A
DATE : 22.02.18
STORMWATER MANAGEMENT DESIGN DRAWINGS
Proposed Resort Development
20 Trading Post Road, Cooroy
for
Palm Lake Resort
Project No: BC-17152
February 2018
SCHEDULE OF DRAWINGS
Drawing No. Drawing Title
DWG-100 LOCALITY AND DRAWING INDEX PLAN
DWG-210 MUSIC CATCHMENT PLAN
DWG-310 BASIN D3 LAYOUT AND CROSS SECTION
DWG-320 BASIN D3 - INLET AND OUTLET DETAILS
DWG-330 BASIN D3 - FILTER MEDIUM AND UNDERDRAINAGE DETAILS
BIOME Consulting Pty Ltd
Unit 30201, Southport Central Tower 3,
9 Lawson St, Southport QLD 4215
PO Box 3469, Australia Fair, Southport
Site Location O 07 5532 7779
M 0415 935 222
E [email protected]
W www.BIOMEconsulting.com.au
ABN 86 166 087 476
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.