Original source · versioned page text
Information Request OPW25 0053
Construction Management
It is noted the site is located at the end of a cul-de-sac, adjacent to an access driveway and
the entrance of a pathway. Council has concerns the construction may impact
vehicle/pedestrian access and safety.
Information Required
2. Provide a construction management plan demonstrating how the impacts will be
managed.
Portable Long Service Fee Levy
The provided DA Form 1 (item 21) has nominated the portable long service fee levy
is not applicable.
Information Required
3. Provide the monetary value of the proposed operational works as specified as part of
item 14.3 of the DA Form 1.
3. DUE DATE FOR RESPONSE TO INFORMATION REQUEST
The due date for providing the requested information is 16/07/2025. Email your response to
[email protected]. Please advise Council of your response to this information request
in accordance with section 13 of the Development Assessment Rules.
If you do not provide a response before the due date, it will be taken as if you have decided
not to respond to the information request and Council will continue with the assessment of
your application.
4. OTHER DETAILS
You can follow the progress of this application online at www.noosa.qld.gov.au. The “Online
Services” page can be accessed via "Quick Links" on the left hand side of the screen.
Should you have any further queries in relation to the above, please do not hesitate to contact
me on the number above.
Yours faithfully,
Felix Gough
Development Engineer
Page 2 of 2
Document Set ID: 23674613
Version: 5, Version Date: 16/04/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.