Council archive · source document
MCU14/0077 & OPW14/0324 - Decision Notice
Officer: Glen Conforti Direct Telephone: 53296241 Our Reference: MCU14/0077 & OPW 14/0324 Your Reference: 53213 19 January 2015 Wilson Clark Construction Pty Ltd C/- Murray & Associates (Qld) Pty Ltd PO Box 246 NAMBOUR QLD 4560 Dear Sir/Madam Decision Notice Sustainable Planning Act 2009 I refer to your application and advise that on 15 January 2015 Council decided to approve the application in full subject to conditions. Details of the decision are as follows: application details Application No: MCU14/0077 & OPW14/0324 Street Address: Noosa Metro Innovation Park 10/100 Rene Street Noosaville Qld 4566 Real Property Description: Lot 10 SP 230643 Planning Scheme: The Noosa Plan (16 September 2013) Decision details The following type of approval has been issued: Development Permit for Material Change of Use of Premises - Industrial Business Type 1 - Warehouse & Retail Business Type 4 - Showroom (trade related showroom, plumbing supplies) Development Permit for Operational Work Stormwater Drainage, Landscaping, Car Parking and Access Driveway) Relevant period of approval The relevant period for this development approval is 4 years starting the day that this development approval takes effect. assessment manager conditions MATERIAL CHANGE OF USE When Conditions must be Complied With Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to the use commencing, and then compliance maintained at all times while the use continues. Approved Plans Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan, prepared by Date DD201 J Floor Plan, prepared by Cool Architecture 14 October 2014 DD301 J Roof Plan, prepared by Cool Architecture 14 October 2014 DD401 J Rene Street Streetscape North Elevation, prepared by Cool Architecture 14 October 2014 DD402 J Eastern Elevation & Western Elevation, prepared by Cool Architecture 14 October 2014 DD403 J South Elevation, prepared by Cool Architecture 14 October 2014 2864-1 B Cover Sheet, prepared by Construction Hydraulic 15 October 2014 2864-OP2 C Stormwater Management Plan, prepared by Construction Hydraulic 15 October 2014 2864-OP3 C Stormwater Quality & Quantity Details, prepared by Construction Hydraulic 15 October 2014 2864-OP4 A Stormwater Quality Maintenance, prepared by Construction Hydraulic 15 October 2014 DD701 J Landscaping Plan, prepared by Cool Architecture 14 October 2014 DD702 J Landscaping Notes & Schedules, prepared by Cool Architecture 14 October 2014 Building Height The maximum height of the development must not exceed 8 metres above the finished ground level and the natural ground level. Performance Bond Security in the form of a cash bond or trading bank guarantee to the sum of $10,000 must be submitted to Council, to secure performance of all conditions of this approval, prior to pre-start meeting. The cash bond or trading bank guarantee will be returned on performance of the conditions of approval less any costs incurred by Council in respect of enforcing performance of this permit. Council reserves the right to call upon the bond or guaranteed sum to effect compliance with conditions. Street Identification The street address of the development must be clearly visible and discernible from the primary frontage of the site by the provision of a street number and, where appropriate, the building name. Building Appearance All air conditioning units or other mechanical equipment must be fully enclosed or screened such that they are not visible from the street frontages nor adjoining properties. Water & Sewer Connections An underground connection to reticulated water and sewerage must be provided to the development site in accordance with the standards and requirements of Northern SEQ Distributor–Retailer Authority (Unitywater). A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority (Unitywater) must be submitted to Council that certifies an underground connection to reticulated water and sewerage has been provided to the development site. Landscaping The development site must be landscaped. The works must be undertaken in accordance with The Noosa Plan, Planning Scheme Policy PSP03 Landscaping Plants and Guidelines and the approved plans. Dense screening vegetation must be provided for the full length of the black PVC chainlink fence and the bin enclosure along the Rene Street frontage. All landscape works must be established and maintained in accordance with the approved design for the life of the development, and in a manner that ensures healthy, sustained and vigorous plant growth. All plant material must be allowed to grow to full form and be refurbished when its life expectancy is reached. All landscape works must be maintained generally in accordance with the approved design for the life of the development. Site Access and Driveways A sealed access driveway must be provided from the common property road to all parking and manoeuvring areas of the development. The works must include in particular a driveway crossover in accordance with IPWEAQ standard drawing SEQ R- 051 or R-052 Car Parking A minimum of 17 car parking spaces must be provided and marked on the site. The car parking must be made available and accessible at all times while the use is open for business. The works must include in particular: carspaces 1-5 and 12-15 must be allocated as staff parking spaces 1 disabled parking space within the total crossfalls and gradients in accordance with Australian Standard AS2890: Parking Facilities wheel stops for carspaces 7-12 to prevent vehicles entering the biobasin. The wheel stops must be designed and installed in accordance with AS/NZS2890.1:2004. All car parking areas and access driveways must be maintained exclusively for vehicle parking and manoeuvring and kept in a tidy and safe condition at all times. Directional signage must be provided to direct visitors and customers to the car parking spaces provided on site. Service Vehicles Service vehicle parking, manoeuvring and standing spaces must be provided on the site. Stormwater Drainage & Quality The site must be provided with a stormwater drainage system connecting to a lawful point of discharge. Any overflow from rainwater tanks installed on site must receive treatment within the bioretention basin prior to release from the site. Earthworks and Retaining Walls All fill and associated batters must be contained entirely within the subject site unless written permission from the respective landowner(s) is provided to Council. All earthworks must be undertaken in accordance with the provisions of Australian Standard AS3798: Guidelines on Earthworks for Commercial and Residential Developments. Where the development involves excavation or filling over, or adjacent to, drainage, water supply or sewerage infrastructure, all access chamber surface levels must be adjusted to provide a freeboard of 100mm above the finished ground surface level. Damage to Services and Assets Any damage caused to existing services and assets as a result of the development works must be repaired at no cost to the asset owner at the following times: where the damage would cause a hazard to pedestrian or vehicle safety, immediately; or where otherwise, upon completion of the works associated with the development. Any repair work which proposes to alter the alignment or level of existing services and assets must first be referred to the relevant service authority for approval. Signage All advertising signage must comply with the Advertising Devices Code. Waste Management Refuse storage, removal and collection facilities must be provided in accordance with the following: provision of separate bins (240l wheelie bins or 1.1 m3 bulk bins) for general and recyclable waste for the site collection by service vehicles from the kerbside of the internal common property road frontage provision of a hardstand impervious area within the site for the permanent storage location of the bins, having minimum dimensions of 0.36 m2 (600mm x 600mm) per bin provision of a 1.5m high purpose built enclosure to the storage location which is screened from the street provision of a wash-down area in the vicinity of the permanent storage location fitted with a hose-cock and a drain connected to the sewer that has a stormwater catchment area of no more than 1m². Operational Works Prior to Commencement of Works Council must be contacted at least 5 working days prior to any works commencing to organise a prestart. The contact number to arrange a pre-start meeting is 5329 6244. The pre-start meeting must include the relevant parties for the following aspects of the works: Civil engineering works; Erosion and sediment control works A Construction Management Plan must be submitted to Council prior to the pre-start meeting and must specifically address the following: Traffic Management during all aspects of the construct phase including: A Traffic Management Control Plan in accordance with Manual of Uniform Traffic Control Devices (MUTCD) detailing all temporary signage and traffic control measures prior to construction Maintenance of safe pedestrian access across the frontage of the site both during daily construction and after daily construction has ceased Proposed fencing to the site during the construction phase of the development Adequate parking arrangements for construction workers Maintenance and protection of water quality and existing drainage lines through the construction site through the implementation of appropriate erosion and sediment control measures Works program identifying key components of the works and their respective durations Establishment of a communication protocol with the general public, adjoining owners, emergency services and local businesses to advise of construction times, impacts on traffic and services and other relevant issues Any conflict between the development and an existing or proposed service must be referred to the relevant service authority for determination prior to commencement of works. During Construction The developer must meet any costs to repair damage to any Council asset during construction, where damage is a result of the development works. Damage to assets must be repaired immediately where it creates a hazard to the community. In circumstances where the damage does not create a hazard to the community, it must be repaired immediately on completion of the works associated with the development. A condition report including photographs of the Rene Street frontage of the site should be completed and submitted to Council at the prestart meeting. All works must be supervised by a Registered Professional Engineer of Queensland (RPEQ) who is independent of the Developer and Principal Contractor, and they must certify that all works conform to the Operational Works permit. Where municipal works are involved, such confirmation must be submitted for the respective hold points prior to any site inspection by Council Officers. All works must be constructed in accordance with: The approved plans/documents and conditions detailed in this Decision Notice All relevant Noosa Council Planning Scheme Policies, standard drawings, standard specifications and guidelines The latest version of the Healthy Waterways document “Water Sensitive Urban Design Technical Design Guidelines for South East Queensland” for all water quality devices to be constructed on site. Bioretention Basins During construction and establishment of the bioretention devices, the supervising RPEQ must certify that the device was constructed in accordance with Construction and Establishment Guidelines: Swales, Bioretention Systems and Wetlands (Water by Design, 2009) and that the forms contained in section 3.15 of the guidelines, including the associated supporting information and data, are completed. These forms and certification must be submitted to council prior to commencement of use. A construction hold point with a council delegate must be established once the contributing catchment is effectively stabilised with at least 80% groundcover, and bioretention device underdrainage pipe work is installed. At the time of the construction holdpoint, a sample of the drainage layer, transition layer, and filtration media materials must be stockpiled onsite accompanied by laboratory results that demonstrate that the media complies with the specifications contained in the latest version of the Guidelines for Soil Filter Media in Bioretention Systems (Facility for Advancing Water Biofiltration) and that the minimum hydraulic conductivity of 180mm/hr or as specified on the approved engineering plans will be achieved. The bioretention underdrains and cleanout points must be provided as uPVC pipe generally as shown on IPWEAQ Standard DrawingWSUD-003. Where the bioretention filter media interfaces with stormwater pits and retaining walls, nonwoven geotextile must be fixed to the pit/retaining wall and extend 300mm out into the filter media generally in accordance with IPWEAQ Standard Drawing WSUD-001 to prevent tunnelling of water along the interface. All overflow pits within the bioretention devices must be provided with letterbox type grates in accordance with IPWEAQ Standard Drawing WSUD-001. A minimum of five of the following species must be planted in the bioretention basin surface at a minimum density of 8 plants/m2: Carex appressa. Carex fascicularis.Ficinia nodosa. Juncus usitatis. Lomandra longifolia. Ghania sieberiana. Where landscaping/garden beds are proposed adjacent to the bioretention basin, a 900mm deep root barrier must be installed to the interface between the landscape/garden area and the bioretention basin. Following Construction - Prior to issuing of a final compliance certificate, council must receive evidence that the results for the in situ hydraulic conductivity testing conducted in accordance with PRACTICE NOTE 1: In Situ Measurement of Hydraulic Conductivity (FAWB, April 2008) for the bioretention filter media achieve the design criteria. Maintenance - All stormwater quality treatment devices must be maintained in accordance with the Maintaining Vegetated Stormwater Assets, Version 1 (Water by Design, 2009). Records of all maintenance activities undertaken must be kept and made available to council upon request. Erosion and Sediment Control Erosion and sediment control measures must be installed and maintained to minimise erosion on the site and to minimise the export of sediment and associated pollutants from the site. The erosion and sediment control measures must be designed, installed and maintained in accordance with current best practice standards.* Any waters discharged from the site in a 43mm rainfall event or less must contain less than 50mg Total Suspended Solids per Litre. (*refer to advisory notes) Prescribed Water Contaminants (as defined in the Environmental Protection Act 1994) must not be released from the site or to waters within the site, or be likely to be released should rainfall occur, unless all reasonable and practicable measures as detailed within the International Erosion Control Association Best Practice Erosion and Sediment Control Document (2008) are taken to prevent or minimise the release and concentration of contamination. Prior to the the issue of the Certificate of Classification, all site surfaces must be effectively stabilised using methods which have achieved effective short-term stabilisation and which will continue to achieve effective stabilisation in the medium to long-term (refer to advisory notes). For the purpose of this condition, an effectively stabilised surface is defined as one that does not, or is not likely to result in visible evidence of soil loss caused by sheet, rill or gully erosion or lead to sedimentation, or lead to water contamination. Any exposed areas must be effectively stabilised without delay and prior to rainfall occurring. Works Within Road Reserve/Reinstatement Safe pedestrian access on all streets in the vicinity of the development must be maintained at all times. Should footpath/road closures be necessary to carry out construction works, Council’s Engineering Officer must be notified prior to the proposed closure and all requirements complied with. All frontage works must match neatly with existing road and verge/footpath features. Additional works beyond the frontage may be required to provide an acceptable transition to existing road and verge/footpath profiles. In this regard, any sections of the footpath in the common property frontage of the site that is either damaged or missing must be replaced as part of these works. Site Access and Driveways Any existing unnecessary or redundant property accesses must be removed, and the kerb, footpath and verge area reinstated to match the existing footpath and/or verge treatments. Grassed verge areas to be reinstated must be provided with 100 mm topsoil and grass seed or turf, and must be maintained by the developer until established. The following must be complied with during the construction of the required crossover/driveway: The driveway must be constructed so as not to concentrate stormwater runoff onto neighbouring properties or cause ponding of water within the road reserve Earthworks The finished surface levels of the site must be graded and shaped to ensure that all surface runoff is directed to the proposed drainage system and not directed on to any adjoining property. All earthworks shall be undertaken in accordance with the provisions of AS 3798 Guidelines on Earthworks for Commercial and Residential Development. Certification must be provided by an RPEQ and submitted to Council the issue of the Certificate of Classification for the building. Service Conduits under Existing Road Features Electrical conduits or other services proposed to be installed under existing sealed carriageways, concrete pathways or concrete/sealed driveways must be installed by boring. Trenching is not permitted, unless specifically approved by Council. Supervision/Certification Upon completion of the work a certificate must be issued by an RPEQ certifying that the works have been constructed in accordance with the Operational Works permit. Landscaping The finished level of all mulch in garden beds must be a minimum of 50mm below the level of the adjacent top of pavement. All landscaping is to be constructed in accordance with Council’s Planning Scheme Policy PSP03 Landscaping Plants and Guidelines. All approved landscaping works must be maintained in good condition for the duration of the approved use. All landscape works must be constructed and work procedure undertaken in accordance with: The approved plan and conditions detailed in this Decision Notice. All relevant council Planning Scheme Policies, standard drawings, standard specifications and guidelines. Landscape works must be supervised, constructed and certified by qualified persons*. (* Refer to Advisory Note) referral agencies Not Applicable. Advisory notes The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions: Qualified Person – Landscaping For the purpose of supervising landscape works and preparing a landscape certification, is considered to be a landscape architect, landscape designer or horticulturist with a minimum of three years current experience in the field of landscape design. Equitable Access and Facilities The plans for the proposed building work have NOT been assessed for compliance with the requirements of the National Construction Code - Building Code of Australia (Volume 1) as they relate to people with disabilities. Your attention is also directed to the fact that in addition to the requirements of the National Construction Code as they relate to people with disabilities, one or more of the following may impact on the proposed building work: the Disability Discrimination Act 1992 (Commonwealth); the Anti-Discrimination Act 1991 (Queensland); and the Disability (Access to Premises – Buildings) Standards. Development Compliance Inspection Prior to the commencement of the use, please contact Council's Development Assessment to arrange a Development Compliance Inspection. Infrastructure Charges This Development Permit will trigger an “Infrastructure Charge Notice” to be issued in accordance with Council’s “Adopted Infrastructure Charges Resolution” under the State Planning Regulatory Provision (Adopted Charges) and the Sustainable Planning Act 2009. General Advisory Notes Council has undertaken an audit check of the Operational Works drawings in relations to the proposed works. A detailed check of the calculations and drawings has not been undertaken, as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects of the engineering design. Council reserves the right to require further amendments and/or additions at a later date should design errors become apparent. Council reserves the right to call up any performance bond held or levy charges against the property, should emergency works be required to be undertaken by Council to make the site safe due to inactivity on the development site for extended periods of time. Should any changes or modifications to the approved plans be required as a result of construction constraints, a “Request to change an existing approval” under the Sustainable Planning Act 2009 must be made. Amended plans clearly indicating the changes must be lodged with this application along with the appropriate fees. Prestart, On and Off Maintenance Inspections Request Contact Council on 5329 6244 to arrange a prestart or an inspection giving a minimum of 5 business days’ notice of preferred inspection time. If Council officers are required to undertake additional inspections of the same works, a reinspection fee will be applicable in accordance with Council’s Fees and Charges register applicable at the time. Erosion and Sediment Control Accepted best practice standards include: the Sunshine Coast Regional Council Manual for Erosion and Sediment Control V1.2 or other superseding document subsequently adopted by Noosa Council; Best Practice Erosion and Sediment Control, International Erosion Control Association (2008) As a general rule, a site is determined to have achieved effective short-term stabilisation if at the time of the request for “on maintenance”: Methods of stabilisation are: appropriate for slopes and slope lengths; and are consistent with best practice environmental management practices such as in the Manual for Erosion and Sediment Control or the IECA Manual; and Stormwater runoff from the site is not currently, and is not likely to result in visible evidence of sedimentation or erosion, or lead to water contamination. If at the time of request for “on maintenance”, the method of short-term stabilisation has not achieved a level of stability that Council's Officers believe will have a high probability of achieving long term stability, Council Officers may take the following matters into consideration in determining whether the site is capable of achieving medium to long-term stability: Evidence that the site has been effectively stabilised in the short term; Evidence that soil has been adequately ameliorated; Evidence that seed of annual and perennial grass species has been applied at an adequate rate; and That grass seed has germinated at a density that is likely to achieve an effective grass cover. For example, while hydromulch can provide an immediate and effective stabilising cover to soils, the protective cover can be relatively short-lived if vegetation fails to establish before the thin layer of mulch decomposes. So if hydromulch is selected as the method of temporary short term stabilisation, Council Officers will seek to confirm that perennial as well as annual grasses are well established to reduce the risk of instability of the site in the medium to long term. As a general rule, hydromulch will only be accepted as a “patch” fix and should comprise no more than 20% of the exposed site area due to the high risk of failure. Due to the requirement to progressively stabilise exposed areas, it is not envisioned that this will present any difficulties for an appropriately managed and compliant site. property notes The following property notes will be placed against the subject property in Council’s property record system: MCU14/0077 – Stormwater Treatment Device This property is serviced by a bioretention basin water quality treatment device that must be maintained in accordance with the document titled Maintaining Vegetated Stormwater Assets, Version 1 (Water by Design, 2009). Records of all maintenance activities undertaken on stormwater quality treatment devices must be kept for a minimum of 5 years and made available to Council upon request. preliminary approval overriding planning scheme Not Applicable further development permits required Development Permit for Building Work (All Building Works) self assessable codes The following codes for self-assessable development related to the development approval issued under this Decision Notice must be complied with. Advertising Devices Code submissions No properly made submissions were received about this application. reasons/grounds for approval The Assessment Manager considers the decision conflicts with the planning scheme and the following are sufficient grounds to justify the decision despite the conflict: The proposal adds to the range of businesses and employment opportunities in the Shire Business Centre The trade related warehouse and showroom is more compatible with industrial uses when compared to typical retail uses and is therefore suitably located as proposed, being a transitional area between industrial and retail uses in the Shire Business Centre. RIGHTS OF APPEAL You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Sustainable Planning Act 2009 is attached. During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a “negotiated decision notice” will be issued. Only one “negotiated decision notice” may be given. Taking this step will defer your appeal period, which will commence again from the start the day after you receive a “negotiated decision notice”. (Refer to Part 8 “Dealing with decision notices and approvals” - Division 1 “Changing decision notices and approvals during applicant’s appeal period” of the Sustainable Planning Act 2009.) OTHER DETAILS If you wish to obtain more information about Council’s decision, electronic copies are available on line at www.noosa.qld.gov.au, or at Council Offices. Yours faithfully Kerri Coyle Manager Planning & Environment cc Unitywater Enc: Adopted Infrastructure Charge Notice Approved Plans/Documents Appeal Rights Appeal Rights SUSTAINABLE PLANNING ACT 2009 & SUSTAINABLE PLANNING REGULATION 2009 The following is an extract from the Sustainable Planning Act 2009 (Chapter 7). MATERIAL CHANGE OF USE, RECONFIGURING A LOT & OPERATIONAL WORKS Division 8 Appeals to court relating to development applications and approvals 461 Appeals by applicants (1) An applicant for a development application may appeal to the court against any of the following— (a) the refusal, or the refusal in part, of the development application; (b) any condition of a development approval, another matter stated in a development approval and the identification or inclusion of a code under section 242; (c) the decision to give a preliminary approval when a development permit was applied for; (d) the length of a period mentioned in section 341; (e) a deemed refusal of the development application. (2) An appeal under subsection (1)(a), (b), (c) or (d) must be started within 20 business days (the applicant’s appeal period) after— (a) if a decision notice or negotiated decision notice is given—the day the decision notice or negotiated decision notice is given to the applicant; or (b) otherwise—the day a decision notice was required to be given to the applicant. (3) An appeal under subsection (1)(e) may be started at any time after the last day a decision on the matter should have been made. 462 Appeals by submitters—general (1) A submitter for a development application may appeal to the court only against— (a) the part of the approval relating to the assessment manager’s decision about any part of the application requiring impact assessment under section 314; or (b) the part of the approval relating to the assessment manager’s decision under section 327. (2) To the extent an appeal may be made under subsection (1), the appeal may be against 1 or more of the following— (a) the giving of a development approval; (b) any provision of the approval including— (i) a condition of, or lack of condition for, the approval; or (ii) the length of a period mentioned in section 341 for the approval. (3) However, a submitter may not appeal if the submitter— (a) withdraws the submission before the application is decided; or (b) has given the assessment manager a notice under section 339(1)(b)(ii). (4) The appeal must be started within 20 business days (the submitter’s appeal period) after the decision notice or negotiated decision notice is given to the submitter. 463 Additional and extended appeal rights for submitters for particular development applications (1) This section applies to a development application to which chapter 9, part 7 applies. (2) A submitter of a properly made submission for the application may appeal to the court about a referral agency’s response made by a prescribed concurrence agency for the application. (3) However, the submitter may only appeal against a referral agency’s response to the extent it relates to— (a) if the prescribed concurrence agency is the chief executive (environment)—development for an aquacultural ERA; or (b) if the prescribed concurrence agency is the chief executive (fisheries)—development that is— (i) a material change of use of premises for aquaculture; or (ii) operational work that is the removal, damage or destruction of a marine plant. (4) Despite section 462(1), the submitter may appeal against the following matters for the application even if the matters relate to code assessment— (a) a decision about a matter mentioned in section 462(2) if it is a decision of the chief executive (fisheries); (b) a referral agency’s response mentioned in subsection (2). 464 Appeals by advice agency submitters (1) Subsection (2) applies if an advice agency, in its response for an application, told the assessment manager to treat the response as a properly made submission. (2) The advice agency may, within the limits of its jurisdiction, appeal to the court about— (a) any part of the approval relating to the assessment manager’s decision about any part of the application requiring impact assessment under section 314; or (b) any part of the approval relating to the assessment manager’s decision under section 327. (3) The appeal must be started within 20 business days after the day the decision notice or negotiated decision notice is given to the advice agency as a submitter. (4) However, if the advice agency has given the assessment manager a notice under section 339(1)(b)(ii), the advice agency may not appeal the decision. 465 Appeals about decisions relating to extensions for approvals (1) For a development approval given for a development application, a person to whom a notice is given under section 389, other than a notice for a decision under section 386(2), may appeal to the court against the decision in the notice. (2) The appeal must be started within 20 business days after the day the notice of the decision is given to the person. (3) Also, a person who has made a request under section 383 may appeal to the court against a deemed refusal of the request. (4) An appeal under subsection (3) may be started at any time after the last day the decision on the matter should have been made. 466 Appeals about decisions relating to permissible changes (1) For a development approval given for a development application, the following persons may appeal to the court against a decision on a request to make a permissible change to the approval— (a) if the responsible entity for making the change is the assessment manager for the application— (i) the person who made the request; or (ii) an entity that gave a notice under section 373 or a pre-request response notice about the request; (b) if the responsible entity for making the change is a concurrence agency for the application—the person who made the request. (2) The appeal must be started within 20 business days after the day the person is given notice of the decision on the request under section 376. (3) Also, a person who has made a request under section 369 may appeal to the court against a deemed refusal of the request. (4) An appeal under subsection (3) may be started at any time after the last day the decision on the matter should have been made. 467 Appeals about changing or cancelling conditions imposed by assessment manager or concurrence agency (1) A person to whom a notice under section 378(9)(b) giving a decision to change or cancel a condition of a development approval has been given may appeal to the court against the decision in the notice. (2) The appeal must be started within 20 business days after the day the notice of the decision is given to the person. [word/footer1.xml] Page 11 of 14 [word/footer2.xml] PO Box 141 P. (07) 5329 6500 [email protected] TEWANTIN QLD 4565 F. (07) 5329 6501 www.noosa.qld.gov.au Page 1 of 14 [word/header1.xml] MCU14/0077 [Attachment: image3.png (image text)] K Coy fs [Attachment: image4.png (image text)] a mm NOOSA COUNCIL
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
MCU14/0077 & OPW14/0324 - Decision NoticeRelated documentApplication case desk ↗
About this file
- File size
- 152 KB (small file)
- File type
- DOCX
No other editions are linked here.