Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

001A2FB1.001

of 23

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Text sections not matched to the original PDF pages. See original document to check page numbers.

ow
             INTEGRATED PLANNING ACT 1997                                                                                   IDAS Assessment Checklist, Version 22
             SECTION 1              section 1 must be completed for all applications that require completion of the [DAS Assessment Checklist
             HERITAGE                                                                                                          _
             1.1A      Is any part of the proposal intended to be carried out on a Queensland heritage place under the Queens/and Heritage Act 1992?
                          DX] No-Goto118        [_] Yes
                        IFA, schedule 8, part 1, table 5, item 2, IP Regulation, schedule 2, tate 2, item 18.
             1.1B      Does the proposal involve development intended to be carried out on a place entered in a local heritage register under part 11 of
                       the Queensland Heritage Act 1992, other than if the place is on Cairns or Mackay airport land?
                          [X] No-Gotoar2         [_] Yes
                        IPA, schedule 8, part 1, table 5, item 24, IP Regulation, schedule 1, part 2, table 5, item 2.
             REMOVING QUARRY MATERIAL; WILDRIVERAREA                      =                          ge
             1.2       Does the proposal involve removing quarry material from a watercourse or lake as defined under the Water Act 2000?
                        [X] No-Gotoar.3      [_] Yes
                        IPA, schedule 8, part 1, table 5, item 1; iP Regulation, schedule 2, table 2, item 11; IP Regulation, schedule 1, table 5, item 2 (wild river area); Water Act 2000,
                        section 966C; Wild Rivers Act 2005, section 43A
   6         [ENVIRONMENTALLY RELEVANT. ACTIVITY; WILDRIVERAREA                                                  ns              eg            ee            |
             1.3       Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?
                             No-Gotoat.4      [_] Yes
                         IPA, schedule 8, part 1, table 2, item 1; IPA, schedule 8, part |, table 5, tems 3 and 4; 1P Regulation, schedule 2, table 2. itams t and 23; Environmental Protection Act 1994, section
                         73AA (wild nver area): Wild Rivers Act 2005, section 43A; relevant wild river declaration; Wild Rivers Code.
             WITHIN THE LIMITS OF APORT) «008                    ha ce SE                    Pe      Ee                                              ua
             1.4       Is any part of the premises within the limits of a port under the Transport Infrastructure Act 1994?
                       DX] No - Goto a1.5
                       [_] Yes
                         IP Regulation, schedule 2, table 2, tems 15 and 16
             DECLAREDFISHHABITATAREA                           S—=CS;S7«7«<S;S; ; TOSS:t;é<‘<CS:S:StSSS     a a a
             1.5       Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994?
                        DX) No - Goto 07.6
                        LJ Yes - if answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA, schedule
  ©                              8, this application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). If DPI&F is not the
                                 Assessment Manager for the application, the agency has jurisdiction as Advice Agency.
                         IP Regulation, schedule 2, table 2, tam 26
             COMMUNITY INFRASTRUCTURE                           ekg                                                                 ee               de
              1.6       Is any part of the premises designated for community infrastructure?
                        [X] No - Goto 01.7
                        [_] Yes
                         IP Regulation, schedule 2, table 3, tem 7
             WASTEWATERMANAGEMENT                                          ee ae                                        gee        ee    gee
              1.7       Does the proposal involve the establishment or expansion of a waste water disposal system?
                         [X] No - End of Section?  [_] Yes
                         IP Regulation, schedule 2, table 3, tem 5

Used in these records

About this file

File size
1.5 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

001A2FB1.001.pdf · 1.5 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.