Refer to Table 6.3a-b for a summary of the pre and post developed flows for the northern
and southern catchments. Refer to Appendix D for detailed Rational Method calculations.
Table 6.3a Pre Vs Post Developed – Southern Flow Path – CMT 1
AEP Q Pre Q Post Variance
(m3/s) (m3/s)
63% 6.14 6.15 0.04%
39% 8.18 8.18 0.04%
18% 11.37 11.38 0.04%
10% 13.79 13.79 0.04%
5% 16.57 16.58 0.04%
2% 21.17 21.18 0.04%
1% 24.425 24.434 0.04%
Table 6.3b Pre Vs Post Developed – Northern Flow Path – CMT 2
AEP Q Pre Q Post Variance
(m3/s) (m3/s)
63% 0.54 0.55 2.3%
39% 0.72 0.73 2.3%
18% 0.99 1.01 2.3%
10% 1.19 1.22 2.3%
5% 1.42 1.46 2.3%
2% 1.79 1.83 2.3%
1% 2.05 2.10 2.3%
The increases to peak discharge within the existing overland flow paths are minor and, as
noted in Section 6.1, will not result in discernible adverse impacts downstream of the site.
The existing waterways are heavily vegetated and have limited potential for future
development given the changes to the local area planning provisions and subsequent
downzoning of adjacent allotments.
No onsite detention measures are proposed as part of this development application.
11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.