Appendix C - Engineering Report

of 56

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (13.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 11, section 1. The text section number identifies this passage in the reader.

Refer to Table 6.3a-b for a summary of the pre and post developed flows for the northern
and southern catchments. Refer to Appendix D for detailed Rational Method calculations.


               Table 6.3a Pre Vs Post Developed – Southern Flow Path – CMT 1
                          AEP     Q Pre      Q Post    Variance
                                  (m3/s)     (m3/s)
                         63%       6.14       6.15      0.04%
                         39%       8.18       8.18      0.04%
                         18%      11.37      11.38      0.04%
                         10%      13.79      13.79      0.04%
                          5%      16.57      16.58      0.04%
                          2%      21.17      21.18      0.04%
                          1%      24.425     24.434     0.04%


               Table 6.3b Pre Vs Post Developed – Northern Flow Path – CMT 2
                          AEP     Q Pre      Q Post    Variance
                                  (m3/s)     (m3/s)
                         63%       0.54       0.55       2.3%
                         39%       0.72       0.73       2.3%
                         18%       0.99       1.01       2.3%
                         10%       1.19       1.22       2.3%
                          5%       1.42       1.46       2.3%
                          2%       1.79       1.83       2.3%
                          1%       2.05       2.10       2.3%


The increases to peak discharge within the existing overland flow paths are minor and, as
noted in Section 6.1, will not result in discernible adverse impacts downstream of the site.
The existing waterways are heavily vegetated and have limited potential for future
development given the changes to the local area planning provisions and subsequent
downzoning of adjacent allotments.


No onsite detention measures are proposed as part of this development application.




                                                                                         11
Log in to download the original file

Appendix C - Engineering Report.pdf · 13.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.