Rational Calculations ‐ Catchment 1
Reference ‐ Chapter 4 QUDM.
Job Name. Triller Court CATCHMENT INFORMATION
Job No. C6361 LOCAL AUTHORITY NSC
Date 9/05/2022 IFD INFORMATION Noosa
Designed BWM 10% AEP 60min 65.2
Checked MVC
EXISTING TIME OF CONCENTRATION DEVELOPED TIME OF CONCENTRATION COEFFICIENT OF RUNOFF
Sub‐Catchment Area (Ha) Fraction Impervious (%) Runoff Coefficients
Std Inlet Time Std Inlet Time CMT No. Pre Catch Post Catch Existing Developed Existing Developed
1 99.908 99.908 2.7 2.8 0.6668 0.6670
2
Slope (%) 24.0 Slope (%) 3
SHEET FLOW
SHEET FLOW
Flow Length (m) 50.0 Flow Length (m) 4
Horton's 'n' 0.035 Horton's 'n' 5
Flow Time (min) 7 Flow Time (min) Total 99.908 99.908 2.7 2.8 0.67 0.67
PEAK DISCHARGE CALCULATIONS
CHANNEL FLOW
Flow Length (m) 148.0 PIPED FLOW Flow Length (m) Rainfall (mm/hr) Coefficient of Runoff Peak Discharge (m³/s)
Fall (m) 26.0 Fall (m) AEP Existing Developed Existing Developed Existing Developed Difference (%)
Flow Time (min) 1.0 Flow Time (min) 63% 41.5 41.5 0.53 0.53 6.14 6.15 0.04%
Multiplier ∆ 3 Multiplier ∆ 39% 52 52 0.57 0.57 8.18 8.18 0.04%
Flow Time (min) 3.0 Flow Time (min) 18% 64.7 64.7 0.63 0.63 11.37 11.38 0.04%
10% 74.5 74.5 0.67 0.67 13.79 13.79 0.04%
5% 85.3 85.3 0.70 0.70 16.57 16.58 0.04%
CHANNEL FLOW
Flow Length (m) 203.0 Flow Length (m) 2% 99.5 99.5 0.77 0.77 21.17 21.18 0.04%
KERB FLOW
Fall (m) 15.0 Fall (m) 1% 110 110 0.80 0.80 24.425 24.434 0.04%
Flow Time (min) 1.3 Flow Time (min)
Multiplier ∆ 3 Multiplier ∆ MANNING'S CALCULATIONS ‐ Pre Developed
Flow Time (min) 3.9 Flow Time (min) Scenario Area Perimeter Radius 'n' Slope Velocity Discharge
Pre 33.581 49.559 0.678 0.15 2.0 0.73 24.425
CHANNEL FLOW
CHANNEL FLOW
Flow Length (m) 250.0 Flow Length (m)
Fall (m) 13.0 Fall (m) MANNING'S CALCULATIONS ‐ Post Developed
Flow Time (min) 1.8 Flow Time (min) Scenario Area Perimeter Radius 'n' Slope Velocity Discharge
Multiplier ∆ 3 Multiplier ∆ Post 33.591 49.571 0.678 0.15 2.0 0.73 24.433
Flow Time (min) 5.4 Flow Time (min)
MANNING'S CALCULATIONS ‐ Max Depth
Total 0 Scenario Area Perimeter Radius 'n' Slope Velocity Discharge
CHANNEL FLOW
Flow Length (m) 575.0 Post 64.492 93.314 0.691 0.15 2.0 0.74 47.53
Fall (m) 12.0
Flow Time (min) 5.0
Multiplier ∆ 3
Flow Time (min) 15.0
CHANNEL FLOW
Flow Length (m) 865.0
Fall (m) 13.0
Flow Time (min) 7.0
Multiplier ∆ 3
Flow Time (min) 21.0
Total 48
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.