Skip to the record
Every meeting, every word.

Original source · versioned page text

Appendix C - Engineering Report

of 56

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (13.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 50, section 1. The text section number identifies this passage in the reader.

I spoke to Michael Lukin today and we both agree that it would be Unitywaters understanding that lots within the
Net Serv Plan can, and are to connect upon development of the lot. As well as this the topography of the land allows
for the rear of lot 4 to connect, and Unitywater would support this if desired, so long as in accordance with the SEQ
Codes and Unitywater policies etc. However, this is up to the developer and also in accordance with Councils
planning etc.



Is this the information you are after on this?



Kind Regards



Jarrod Murphy | Principal Development Engineer

Development Services

Sustainable Infrastructure Solutions

Unitywater

PO Box 953 Caboolture Qld 4510

m: 0407 953 054

e: [email protected]




                                                          2
Log in to download the original file

Appendix C - Engineering Report.pdf · 13.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.