Skip to the record
Accept no substitutions.

Council archive · source document

OPW25/0012 - Fauna Management Plan

of 50

Plans and drawings: the text below has words only, no drawings.

Very large file (18.3 MB): may take a few minutes to open.

Log in to see the plans as drawn

Original PDF page 12, section 1. The text section number identifies this passage in the reader.

Fauna Management Plan
3-7 Serenity Close, Noosa Heads



   c) Construction management measures, and,
   d) Post-construction management measures.


4.1   PRE-CLEARING MANAGEMENT MEASURES


A number of actions are required immediately prior to the commencement of any
vegetation removal. Table 1 summarises the pre-clearing activities required as part of the
Fauna Management Plan.

TABLE 1: PRE-CLEARING ACTIVITIES.

 Action                 Task                                     Responsibility        Timing
 Appoint licensed       1)   Appoint licensed Fauna Spotter.     Permit holder, Site   Prior to any
 Fauna Spotter               Licensed Fauna Spotter is a         Manager,              vegetation
                             person or company holding a         Fauna Spotter         clearing
                             current Rehabilitation Permit
                             issued by the State Government.
                        2) The appointed Fauna Spotter
                           must meet the requirements for
                           the position of Koala Spotter.
                        3) Advise State of appointment of
                           licensed Fauna Spotter
                        4) Advise State of:
                             a) the expected date the clearing
                             activity will commence;
                             b) the expected duration of the
                             clearing activity;
                             c) the name and contact details
                             of the Fauna Spotter that has
                             been contracted for the clearing
                             activity; and,
                             d) the name, contact details and
                             authority number of the spotter
                             catcher that has been contracted
                             for the clearing activity.

 Pre-clearing survey    1)   Undertake a survey of the fauna     Environmental         Prior to any
 of fauna habitat            habitat features of impacted        scientist, Fauna      vegetation
 features impacted by        vegetation, including number of     Spotter               clearing
 vegetation clearing         hollows removed and what
                             fauna species are likely to be
                             impacted, number of hollow
                             logs, as well as number of nests
                             or possum dens. The location
                             and details of fauna habitat
                             features should be recorded and
                             mapped using a GPS, with




                                                                                            10 | 35

Used in these records

About this file

File size
18.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

OPW25_0012 - Fauna Management Plan.pdf · 18.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.